Publication number: 20210198908
Abstract: A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms.
Type:
Application
Filed:
September 29, 2020
Publication date:
July 1, 2021
Applicants:
THE THIRD CONSTRUCTION CO., LTD OF CHINA CONSTRUCTION THIRD ENGNEERING BUREAU, CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUP CO., LTD, CHINA STATE CONSTRUCTION ENGINEERING CORPORATION
Inventors:
Xiaoqing Liu, Huayong Lu, Weixiang Ding, Wei Wang, Shiqing Qian, Jin Li, Guowei Xu, Buyue Zhang, Liai Xu, Zhihua Zhang, Dong Chen, Hanwen Liu, Heng Liu, Lei Wang, Di Li, Leilei Zhu, Jun Wang, Yanhua Zhao, Huiwen Deng, Haonan Wang, Shilong Wen, Xisheng Tian