Patents by Inventor IVANA MLADENOVIC

IVANA MLADENOVIC has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20230268723
    Abstract: Various embodiments of the teachings herein include methods for determining the state of an electrical switchgear assembly. The method may include: measuring an electric current and a voltage dropped across the switchgear assembly; ascertaining a time interval of an arc occurring during a switching operation; comparing the ascertained time interval to a reference value specific to the switchgear assembly; measuring a voltage profile during the time interval; and comparing the voltage profile with a reference voltage profile. The time interval begins when the value of the measured voltage exceeds a first threshold value. The time interval ends when the value of the current intensity falls below a second threshold value.
    Type: Application
    Filed: June 28, 2021
    Publication date: August 24, 2023
    Applicant: Siemens Aktiengesellschaft
    Inventors: Ivana Mladenovic, Anne Bauer
  • Patent number: 11676785
    Abstract: A gas-insulated switch has a first contact and a second contact. A contact unit is connected to the first contact as a movement contact unit having a drive unit and is movably mounted along a switch axis. The gas-insulated switch further has a multi-part insulation nozzle system with a primary nozzle and an auxiliary nozzle. A heating channel is formed between the primary nozzle and the auxiliary nozzle. The heating channel originates from an electric arc chamber and opens in a gas reservoir, wherein the gas reservoir is delimited by a ram. The gas reservoir is radially delimited by a wall, in respect of the switch axis, which is not a component of the movement contact unit, and the ram is part of the movement contact unit and is movably mounted such that the ram moves along the switch axis away from the second contact to enlarge the gas reservoir.
    Type: Grant
    Filed: July 8, 2019
    Date of Patent: June 13, 2023
    Assignee: Siemens Energy Global GmbH & Co. KG
    Inventors: Ivana Mladenovic, Paul Gregor Nikolic
  • Patent number: 11183845
    Abstract: Managing control targets, in particular, load balancing processes, when controlling the supply, conversion, storage, feed, distribution, and/or use of energy in an energy network if the increasing, volatile, dynamic, decentralized, local feed and/or storage of electric energy leads to loads at different network connection levels of the energy network to control the energy supply so efficiently and sustainably that load balancing processes resulting from occurring load deviations for example are supported locally and reduced regionally and/or across network connection levels. Provided are hierarchical and network-oriented energy clusters formed within network connection levels of the energy network, and in the process, the expenditure of energy and the local exchange of energy within energy clusters are localized across clusters and/or across network connection levels via a voluntary and incentivized participation in an energy cluster service which manages the control targets in the energy network.
    Type: Grant
    Filed: July 18, 2017
    Date of Patent: November 23, 2021
    Assignee: SIEMENS AKTIENGESELLSCHAFT
    Inventors: Christian Weindl, Ivana Mladenovic
  • Publication number: 20210319966
    Abstract: A gas-insulated switch has a first contact and a second contact. A contact unit is connected to the first contact as a movement contact unit having a drive unit and is movably mounted along a switch axis. The gas-insulated switch further has a multi-part insulation nozzle system with a primary nozzle and an auxiliary nozzle. A heating channel is formed between the primary nozzle and the auxiliary nozzle. The heating channel originates from an electric arc chamber and opens in a gas reservoir, wherein the gas reservoir is delimited by a ram. The gas reservoir is radially delimited by a wall, in respect of the switch axis, which is not a component of the movement contact unit, and the ram is part of the movement contact unit and is movably mounted such that the ram moves along the switch axis away from the second contact to enlarge the gas reservoir.
    Type: Application
    Filed: July 8, 2019
    Publication date: October 14, 2021
    Inventors: IVANA MLADENOVIC, PAUL GREGOR NIKOLIC
  • Publication number: 20200020178
    Abstract: Various embodiments include a method for determining an expected service life of an electrical apparatus with respect to a reference time comprising: providing an ageing model describing an ageing behavior of the apparatus; recording a value of an electrical operating parameter of the apparatus during operation of the apparatus; adjusting the ageing model based at least in part on the recorded value; and determining the expected service life of the apparatus using the adjusted ageing model.
    Type: Application
    Filed: February 15, 2018
    Publication date: January 16, 2020
    Applicant: Siemens Aktiengesellschaft
    Inventors: Wiebke Fröhner, Ivana Mladenovic, Thomas Werner
  • Publication number: 20190267808
    Abstract: Managing control targets, in particular, load balancing processes, when controlling the supply, conversion, storage, feed, distribution, and/or use of energy in an energy network if the increasing, volatile, dynamic, decentralized, local feed and/or storage of electric energy leads to loads at different network connection levels of the energy network to control the energy supply so efficiently and sustainably that load balancing processes resulting from occurring load deviations for example are supported locally and reduced regionally and/or across network connection levels. Provided are hierarchical and network-oriented energy clusters formed within network connection levels of the energy network, and in the process, the expenditure of energy and the local exchange of energy within energy clusters are localized across clusters and/or across network connection levels via a voluntary and incentivized participation in an energy cluster service which manages the control targets in the energy network.
    Type: Application
    Filed: July 18, 2017
    Publication date: August 29, 2019
    Inventors: Christian Weindl, Ivana Mladenovic
  • Publication number: 20180292442
    Abstract: A method identifies a diagnosis variable which indicates an aging state of an operating device in an electrical energy supply network. In the method, first measurement values of at least one measurement variable are detected at a first measuring point of the operating device. Then simultaneously second measurement values of the at least one measurement variable are detected at a second measuring point of the operating device. The diagnosis variable is identified using respective simultaneously detected first and second measurement values. It is proposed that the first and second measurement values are detected in a time-controlled manner in such a way that a signal of the at least one measurement variable is sampled at a prescribed sampling rate at set times and over a set measurement duration so as to generate time profiles of the first and second measurement values.
    Type: Application
    Filed: April 11, 2018
    Publication date: October 11, 2018
    Inventors: WIEBKE FROEHNER, IVANA MLADENOVIC, THOMAS WERNER