Abstract: A method for restoring a structure resting on settled soil, deep soil being consolidated, the structure having at least one crack resulting from the settling of the soil, in which a reinforcement substance is injected into the foundation soil of the structure in line with the crack in a primary drilling hole, the method comprising simultaneously with the injection, acquiring a curve revealing edges of the crack being brought together, stopping the injection as soon as an abrupt reduction in slope in absolute value is detected on the curve.