Patents Assigned to CHINA ACADEMY OF RAILWAY SCIENCES
  • Patent number: 11982060
    Abstract: A barrier structure for bearing a high-energy impact and construction method thereof are provided. The barrier structure includes a supporting pile array arranged between two opposite mountain slope surfaces. The supporting pile array is arranged in a straight line and includes two or more supporting piles. The two or more supporting piles are fixed at a lower part of a mountain. A barrier net is connected to the two or more supporting piles. The barrier net passes through the supporting pile array and extends to the two opposite mountain slope surfaces. The barrier net is fixed on the two opposite mountain slope surfaces. Pull plates are disposed on the two opposite mountain slope surfaces, and one side of each of the pull plates is fixed to a corresponding slope surface of the two opposite mountain slope surfaces through reverse prestressed anchor cables.
    Type: Grant
    Filed: October 19, 2023
    Date of Patent: May 14, 2024
    Assignees: Railway Construction Research Institute, China Academy of Railway Science Group Co., Ltd., China Academy of Railway Sciences Group Co. , Ltd.
    Inventors: Yufang Zhang, Yong Yao, Kun Yuan, Junli Wan, Wenchao Zhang, Jian Li, Mengjia Liu, Zhongmin Yang, Zhenhua Yin, Guozhuang Song, Yafei Xuan, Peng Zhang, Gongming Chen, Changheng Chen
  • Publication number: 20240092407
    Abstract: A method and device of multi-train operation trend deduction. Temporary speed limit information, scheduling information, line information and train status information are obtained; the coupling relationship between the trains traction calculation and the area of space-time scope which is under temporary speed limit are analyzed, and the time saving driving strategy of the first train within the time domain is calculated; according to the running position and speed of the front train, a multi-train operation tracking model under different block systems is established; according to the temporary speed limit information, the driving strategy of following tracking train is deduced, and the operation of the multi-train is calculated; the operation trend of multi-train to the driving scheduling platform is sent.
    Type: Application
    Filed: December 30, 2022
    Publication date: March 21, 2024
    Applicants: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED SIGNAL & COMMUNICATION RESEARCH INSTITUTE, BEIJING HUATIE INFORMATION TECHNOLOGY Co., Ltd., CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED, BEIJING RUICHI NATIONAL RAILWAY INTELLIGENT TRANSPORT SYSTEM ENGINEERING TECHNOLOGY Co., Ltd.
    Inventors: Rongsheng WANG, Qi ZHANG, Zhiming YUAN, Tao ZHANG, Tao WANG, Shuxin DING
  • Patent number: 11926356
    Abstract: A method and device of multi-train operation trend deduction. Temporary speed limit information, scheduling information, line information and train status information are obtained; the coupling relationship between the trains traction calculation and the area of space-time scope which is under temporary speed limit are analyzed, and the time saving driving strategy of the first train within the time domain is calculated; according to the running position and speed of the front train, a multi-train operation tracking model under different block systems is established; according to the temporary speed limit information, the driving strategy of following tracking train is deduced, and the operation of the multi-train is calculated; the operation trend of multi-train to the driving scheduling platform is sent.
    Type: Grant
    Filed: December 30, 2022
    Date of Patent: March 12, 2024
    Assignees: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED SIGNAL & COMMUNICATION RESEARCH INSTITUTE, BEIJING HUATIE INFORMATION TECHNOLOGY Co., Ltd., CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED, BEIJING RUICHI NATIONAL RAILWAY INTELLIGENT TRANSPORT SYSTEM ENGINEERING TECHNOLOGY Co., Ltd.
    Inventors: Rongsheng Wang, Qi Zhang, Zhiming Yuan, Tao Zhang, Tao Wang, Shuxin Ding
  • Patent number: 11162227
    Abstract: A boltless fastener assembly for a heavy haul railway with an axle load of 35-40 tons includes a pre-embedded steel holder, an e-clip, an insulated gauge block and a rubber pad. A clamping leg-heel end of the e-clip is provided with an L-shaped retaining end. The pre-embedded steel holder is improved to adapt to the e-clip, and an opening is formed at a portion of the pre-embedded steel holder close to the clamping leg-heel end of the e-clip, so that the e-clip can be installed normally. During normal installation, the L-shaped retaining end of the e-clip does not contact the pre-embedded steel holder. When the rail undergoes large torsional deformation, the L-shaped retaining end on one side of a rail moves upward to contact an upper edge of the opening of the pre-embedded steel holder or engages with a second heel end.
    Type: Grant
    Filed: June 5, 2018
    Date of Patent: November 2, 2021
    Assignees: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE, CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED
    Inventors: Junheng Xiao, Hangwei Fang, Zirui Li, Yanshan Li, Chengliang Li, Haoyong Yu, Liangshan Xu, Zhen Pan
  • Patent number: 11136724
    Abstract: A fiber-reinforced prestressed reinforced concrete sleeper is integrally cast and includes a sleeper body and two rail bearing regions. A rail clamping base is arranged on a surface of the each rail bearing region. The two rail bearing regions are located under rails on both sides of the sleeper and the two rail bearing regions are located above the sleeper body. A reinforcing fiber is mixed into the two rail bearing regions only, and a reinforcing rib is arranged in the sleeper body. The reinforcing fiber is concentrated in a main stress region under the surface of the rail bearing regions. The reinforcing fiber arranged in a region with a large stress is more than the reinforcing fiber arranged in a region with a small stress.
    Type: Grant
    Filed: June 11, 2018
    Date of Patent: October 5, 2021
    Assignees: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATON LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE, CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED, BEIJING TIEKE SHOUGANG TRACK TECHNOLOGY Co., LTD
    Inventors: Yangsheng Ye, Ruilin You, Jia Fan, Weibin Liu, Xianggang Du, Zhenyu Tan, Zhanguo Ma, Liangshan Xu
  • Publication number: 20210230809
    Abstract: A boltless fastener assembly for a heavy haul railway with an axle load of 35-40 tons includes a pre-embedded steel holder, an e-clip, an insulated gauge block and a rubber pad. A clamping leg-heel end of the e-clip is provided with an L-shaped retaining end. The pre-embedded steel holder is improved to adapt to the e-clip, and an opening is formed at a portion of the pre-embedded steel holder close to the clamping leg-heel end of the e-clip, so that the e-clip can be installed normally. During normal installation, the L-shaped retaining end of the e-clip does not contact the pre-embedded steel holder. When the rail undergoes large torsional deformation, the L-shaped retaining end on one side of a rail moves upward to contact an upper edge of the opening of the pre-embedded steel holder or engages with a second heel end.
    Type: Application
    Filed: June 5, 2018
    Publication date: July 29, 2021
    Applicants: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE, CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED
    Inventors: Junheng XIAO, Hangwei FANG, Zirui LI, Yanshan LI, Chengliang LI, Haoyong YU, Liangshan XU, Zhen PAN
  • Publication number: 20210123191
    Abstract: A fiber-reinforced prestressed reinforced concrete sleeper is integrally cast and includes a sleeper body and two rail bearing regions. A rail clamping base is arranged on a surface of the each rail bearing region. The two rail bearing regions are located under rails on both sides of the sleeper and the two rail bearing regions are located above the sleeper body. A reinforcing fiber is mixed into the two rail bearing regions only, and a reinforcing rib is arranged in the sleeper body. The reinforcing fiber is concentrated in a main stress region under the surface of the rail bearing regions. The reinforcing fiber arranged in a region with a large stress is more than the reinforcing fiber arranged in a region with a small stress.
    Type: Application
    Filed: June 11, 2018
    Publication date: April 29, 2021
    Applicants: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE, CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED, BEIJING TIEKE SHOUGANG TRACK TECHNOLOGY CO. , LTD
    Inventors: Yangsheng YE, Ruilin YOU, Jia FAN, Weibin LIU, Xianggang DU, Zhenyu TAN, Zhanguo MA, Liangshan XU
  • Patent number: 10745037
    Abstract: A continuous measurement method for a wheel/rail vertical force includes: continuously arranging classic wheel/rail vertical force unit measurement areas in a form of “shear force+support force” on rails, where adjacent unit measurement areas share an end shear force measurement, and each two adjacent unit measurement areas form a unique compound measurement area; obtaining the wheel/rail vertical force when a wheelset passes the unit measurement areas other than the transition area of shear force measurement by using the classic unit measurement areas; obtaining the wheel/rail vertical force when the wheelset passes the transition area of the shared shear force measurement by using the unique compound measurement area; and combining all wheel/rail vertical forces on the unit measurement areas and the compound measurement areas to obtain a long distance fully continuous wheel/rail vertical force of the wheelset.
    Type: Grant
    Filed: April 28, 2015
    Date of Patent: August 18, 2020
    Assignees: China Academy of Railway Sciences, Locomotive & Car Research Institute of China Academy of Railway Sciences, Railway Engineering Research Institute of China Academy of Railway Sciences, Beijing Zongheng Electro-Mechanical Development Co., CR Technological Development Corporation
    Inventors: Yuqing Zeng, Xuwei Li, Weidong Yu, Xuesong Chai
  • Patent number: 10538615
    Abstract: A fiber-reinforced rigid polyurethane foam composite railway sleeper with high fiber content and a manufacturing method thereof. The railway sleeper is formed by bonding a plurality of fiber-reinforced rigid polyurethane foam composite boards with high fiber content by a binder, and the outer surface of the railway sleeper is provided with an anticorrosive paint film. The fiber-reinforced rigid polyurethane foam composite boards with high fiber content include a polyurethane resin as a matrix material and a fiber as a reinforcing material. The problem of insufficient impregnation of the polyurethane and the fiber is solved by using a plurality of technical means such as using a mixed polyether polyol having a low hydroxyl value and a low functionality, using a coupling agent, etc., thus a fiber-reinforced rigid polyurethane foam composite product having a density higher than 840 kg/m3 and a fiber content greater than 60% is manufactured.
    Type: Grant
    Filed: August 14, 2017
    Date of Patent: January 21, 2020
    Assignees: RAILWAY ENGINEERING RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED, CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED
    Inventors: Bin Niu, Zhibin Zeng, Yonghua Su, Tibo Zhao
  • Publication number: 20190185610
    Abstract: A fiber-reinforced rigid polyurethane foam composite railway sleeper with high fiber content and a manufacturing method thereof. The railway sleeper is formed by bonding a plurality of fiber-reinforced rigid polyurethane foam composite boards with high fiber content by a binder, and the outer surface of the railway sleeper is provided with an anticorrosive paint film. The fiber-reinforced rigid polyurethane foam composite boards with high fiber content include a polyurethane resin as a matrix material and a fiber as a reinforcing material. The problem of insufficient impregnation of the polyurethane and the fiber is solved by using a plurality of technical means such as using a mixed polyether polyol having a low hydroxyl value and a low functionality, using a coupling agent, etc., thus a fiber-reinforced rigid polyurethane foam composite product having a density higher than 840 kg/m3 and a fiber content greater than 60% is manufactured.
    Type: Application
    Filed: August 14, 2017
    Publication date: June 20, 2019
    Applicants: RAILWAY ENGINEERING RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED, CHINA ACADEMY OF RAILWAY SCIENCES COPORATION LIMITED
    Inventors: Bin NIU, Zhibin ZENG, Yonghua SU, Tibo ZHAO
  • Publication number: 20180099683
    Abstract: Disclosed is a continuous measurement method for a wheel/rail vertical force.
    Type: Application
    Filed: April 28, 2015
    Publication date: April 12, 2018
    Applicants: CHINA ACADEMY OF RAILWAY SCIENCES, LOCOMOTIVE & CAR RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES, RAILWAY ENGINEERING RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES, BEIJING ZONGHENG ELECTRO-MECHANICAL DEVELOPMENT CO., CR TECHNOLOGICAL DEVELOPMENT CORPORATION
    Inventors: Yuqing ZENG, Xuwei LI, Weidong YU, Xuesong CHAI
  • Patent number: 9758932
    Abstract: A ballastless track system comprises a base; a track slab arranged above the base; a poured-field layer arranged between the base and the track slab, the poured-field layer being formed by filling self-compacting concrete, emulsified asphalt cement mortar or resin mortar, and the inside of the poured-field layer being of a steel bar structure; a connecting piece, the first end of the connecting piece extending into the track slab, and the second end of the connecting piece extending into the poured-field layer; and two rows of rail-seat arranged on the track slab in parallel; and rails arranged on the rail-seat. The ballastless track system is high in reliability, good in durability, and easy in construction and maintenance.
    Type: Grant
    Filed: August 28, 2012
    Date of Patent: September 12, 2017
    Assignee: RAILWAY ENGINEERING RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES
    Inventors: Chunfang Lu, Youming Zhao, Cheng Jiang, Jijun Wang, Meng Wang, Yong Zhao, Weibin Liu, Ziqing Jiang, Ruilin You, Xianggang Du, Jia Fan
  • Patent number: 9222225
    Abstract: Provided in the disclosure is a pre-stressed concrete track slab of slab-type ballast-less track, which includes a slab body (1), on which fastening embedded casings (4) are arranged. At least one row of longitudinal common steel bars (11) and at least one row of transverse common steel bars (12) are arranged in the slab body (1) along a length direction and a width direction. The longitudinal common steel bars (11) are insulated from the transverse common steel bars (12). At least one row of longitudinal pre-stressed steel bars (7) and at least one row of transverse pre-stressed steel bars (6) are fastened in the slab body (1) along the length direction and the width direction through anchor backing plates and fastener devices (8). In the pre-stress directions of the longitudinal pre-stressed steel bars (7) and the transverse pre-stressed steel bars (6), it is post-tensioned in both directions or it is pre-tensioned in one direction and post-tensioned in the other direction.
    Type: Grant
    Filed: December 15, 2011
    Date of Patent: December 29, 2015
    Assignee: Railway Engineering Research Institute of China Academy of Railway Sciences
    Inventors: Jijun Wang, Cheng Jiang, Weibin Liu, Yong Zhao, Meng Wang, Ziqing Jiang, Jia Fan, Xianggang Du, Lu Chunfang
  • Publication number: 20140203094
    Abstract: A ballastless track system comprises a base; a track slab arranged above the base; a poured-field layer arranged between the base and the track slab, the poured-field layer being formed by filling self-compacting concrete, emulsified asphalt cement mortar or resin mortar, and the inside of the poured-field layer being of a steel bar structure; a connecting piece, the first end of the connecting piece extending into the track slab, and the second end of the connecting piece extending into the poured-field layer; and two rows of rail-seat arranged on the track slab in parallel; and rails arranged on the rail-seat. The ballastless track system is high in reliability, good in durability, and easy in construction and maintenance.
    Type: Application
    Filed: August 28, 2012
    Publication date: July 24, 2014
    Applicant: RAILWAY ENGINEERING RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES
    Inventors: Chunfang Lu, Youming Zhao, Cheng Jiang, Jijun Wang, Meng Wang, Yong Zhao, Weibin Liu, Ziqing Jiang, Ruilin You, Xianggang Du, Jia Fan
  • Publication number: 20130264394
    Abstract: Provided in the disclosure is a pre-stressed concrete track slab of slab-type ballast-less track, which includes a slab body (1), on which fastening embedded casings (4) are arranged. At least one row of longitudinal common steel bars (11) and at least one row of transverse common steel bars (12) are arranged in the slab body (1) along a length direction and a width direction. The longitudinal common steel bars (11) are insulated from the transverse common steel bars (12). At least one row of longitudinal pre-stressed steel bars (7) and at least one row of transverse pre-stressed steel bars (6) are fastened in the slab body (1) along the length direction and the width direction through anchor backing plates and fastener devices (8). In the pre-stress directions of the longitudinal pre-stressed steel bars (7) and the transverse pre-stressed steel bars (6), it is post-tensioned in both directions or it is pre-tensioned in one direction and post-tensioned in the other direction.
    Type: Application
    Filed: December 15, 2011
    Publication date: October 10, 2013
    Applicant: RAILWAY ENGINEERING RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCE
    Inventors: Jijun Wang, Cheng Jiang, Weibin Liu, Yong Zhao, Meng Wang, Ziqing Jiang, Jia Fan, Xianggang Du