Abstract: A receiver coil assembly for a geophysical survey system comprising: a first receiver coil supported by a first tubular frame that forms a first loop; a second receiver coil supported by a second tubular frame that forms a second loop; releasable connectors connecting the first tubular frame to the second tubular frame with a sensing axis of the first receiver coil having a different orientation than a sensing axis of the second receiver coil.
Type:
Grant
Filed:
January 24, 2020
Date of Patent:
April 11, 2023
Assignee:
Geotech Ltd.
Inventors:
Edward Beverly Morrison, Carlos Izarra Teran
Abstract: A method and system that includes injecting light into a vapor cell; detecting an output of the light from the vapor cell; modulating the light injected into the vapor cell in dependence on the detected output to achieve an oscillating signal; applying an energy pulse to the vapor cell prior to achieving the oscillating signal to decrease a time required to achieve the oscillating signal; and determining a magnetic field measurement in dependence on a frequency of the oscillating signal.
Abstract: A tow assembly for airborne geophysical surveying that comprises a frame incorporating geophysical surveying equipment; and a suspension assembly for suspending the frame from an aircraft. The suspension assembly has a plurality of suspension ropes connected to the frame at spaced apart connection points for suspending the frame from an aircraft. Lengths of the suspension ropes are adjustable with respect to at least four of the connection points to adjust an attitude of the frame during flight.
Abstract: A method and system that includes injecting light into a vapor cell; detecting an output of the light from the vapor cell; modulating the light injected into the vapor cell in dependence on the detected output to achieve an oscillating signal; applying an energy pulse to the vapor cell prior to achieving the oscillating signal to decrease a time required to achieve the oscillating signal; and determining a magnetic field measurement in dependence on a frequency of the oscillating signal.
Abstract: A bucking system for an electromagnetic survey system which uses a network to interconnect the turns of a transmitter coil with the turns of one or more bucking coils in which the network includes passive circuit elements which to provide accurate bucking of the transmitter coil field at a sensor location, both when the current through the loop is steady and when the current is changing rapidly.
Abstract: A method for monitoring a primary field dipole moment in a TDEM geological surveying system, including measuring a sign and amplitude of a primary field generated by a transmitter loop and sensed by a receiver in each of a plurality of sensitive axes, and in dependence thereon calculating a vector which represents orientation of the primary field at the receiver location in a receiver frame of reference; and determining, in dependence on the vector an orientation of the primary field dipole moment in a receiver frame of reference.
Abstract: A tow assembly for airborne geophysical surveying that comprises a frame incorporating geophysical surveying equipment; and a suspension assembly for suspending the frame from an aircraft. The suspension assembly has a plurality of suspension ropes connected to the frame at spaced apart connection points for suspending the frame from an aircraft. Lengths of the suspension ropes are adjustable with respect to at least four of the connection points to adjust an attitude of the frame during flight.