Patents Assigned to MAERSK DRILLING A/S
  • Patent number: 9856705
    Abstract: Embodiments of an offshore drilling rig including—a drill floor deck having a hole defining a first well center;—a first mast upwardly extending relative to the drill floor deck;—a first hoisting system supported by the first mast and configured for hoisting and lowering tubular equipment through the first well center; wherein the load bearing structure of the first hoisting system is displaced from and located on a first side of the first well center;—first pipe handling equipment for moving tubular equipment to the first hoisting system so as to allow the first hoisting system to hoist or lower the tubular equipment through the first well center; wherein the first pipe handling equipment is operable to move tubular equipment at least partly underneath the load bearing structure and/or through a gap formed in said load bearing structure.
    Type: Grant
    Filed: January 13, 2014
    Date of Patent: January 2, 2018
    Assignee: MAERSK DRILLING A/S
    Inventors: Michael Kannegaard, Allan McColl
  • Patent number: 9834998
    Abstract: An offshore drilling rig configured for lowering and/or raising a string of tubular equipment into a subsea borehole. The drilling rig includes a drill deck; a first hoisting system being adapted for raising or lowering a first load carrier along a vertical first hoisting axis, wherein the first hoisting system is supported by a first support structure extending upwardly relative to the drill deck; a second hoisting system being adapted for raising or lowering a second load carrier along a vertical second hoisting axis located apart from the first hoisting axis, wherein the second hoisting system is supported by a second support structure extending upwardly relative to the drill deck; and a joint operations well center on the drill deck. During joint operations, the first and second hoisting axes are preferably located apart from the joint operations well center.
    Type: Grant
    Filed: May 20, 2014
    Date of Patent: December 5, 2017
    Assignee: MAERSK DRILLING A/S
    Inventor: Jesper Holck
  • Publication number: 20170297876
    Abstract: An offshore floating vessel includes a hoisting system including a drive for moving connecting device and emergency brakes to inhibit motion of the connecting device; wherein the hoisting system is to be operated at least in a hoisting mode and in an active heave compensation mode; wherein hoisting system is to perform an active heave compensation when operated in the active heave compensation mode and to operate without active heave compensation when operated in the hoisting mode; wherein the emergency brakes are operable in a normally-energized mode including a de-energized state where the emergency brakes engage so as to inhibit motion of the connecting device relative to the floating vessel; wherein each emergency brake of the plurality of hydraulic emergency brakes has associated with it a separate accumulator reservoir.
    Type: Application
    Filed: March 28, 2017
    Publication date: October 19, 2017
    Applicant: MAERSK DRILLING A/S
    Inventor: Jesper HOLCK
  • Patent number: 9759021
    Abstract: An offshore drilling rig including a drill floor deck having one or more holes, each defining a well center; one or more masts upwardly extending relative to the drill floor deck, and one or more hoisting systems, each supported by at least one of the one or more masts and configured for hoisting and lowering tubular equipment through at least one of the one or more well centers; a storage area for accommodating marine riser joints in upright orientation side by side in respective upright storage positions; a riser handling apparatus, different from the hoisting systems, adapted to move at least one of said marine riser joints along a movement path between its upright storage position and a prostrate maintenance/transfer position on a maintenance/transfer area, which movement path does not intersect any of the well centers.
    Type: Grant
    Filed: May 20, 2014
    Date of Patent: September 12, 2017
    Assignee: MAERSK DRILLING A/S
    Inventors: Jesper Holck, Frederik Smidth, Michael Kannegaard
  • Publication number: 20170254148
    Abstract: An offshore well-processing system includes a mobile offshore drilling unit and a remote well-processing device configured to be positioned on an offshore platform different from the mobile offshore drilling unit, the mobile offshore drilling unit defining at least one well centre and comprising at least one primary drill rig including at least one drill floor and at least one hoisting system for raising and lowering tubular equipment through the at least one well centre from/into a well in the seafloor. The mobile offshore drilling unit and the remote well-processing device are configured to be operationally coupled to each other; and the mobile offshore drilling unit is configured to assist in performing concurrent well-processing tasks on respective wells, including the first well processing task performed by the remote well-processing device on a first well and a second well-processing task concurrently performed by the offshore well-processing system on a second well.
    Type: Application
    Filed: November 20, 2015
    Publication date: September 7, 2017
    Applicant: MAERSK DRILLING A/S
    Inventor: Michael KANNEGAARD
  • Patent number: 9714546
    Abstract: An offshore drilling rig comprising a drill deck, at least one work center arranged in the drill deck; a diverter system operatively connectable at least to a riser extending towards the seafloor; a hoisting system adapted for raising or lowering tubular equipment through the work center; wherein the offshore drilling rig comprises a first positioning system configured for positioning at least the work center and/or the diverter system and/or a riser tensioning system selectively at a first horizontal position and a second horizontal position, different from the first horizontal position; and wherein the hoisting system is operable to raise or lower tubular equipment through the work center when said work center is positioned at said first horizontal position.
    Type: Grant
    Filed: March 17, 2014
    Date of Patent: July 25, 2017
    Assignee: MAERSK DRILLING A/S
    Inventors: Michael Kannegaard, Allan McColl, Jesper Holck
  • Patent number: 9630813
    Abstract: An offshore floating vessel includes a hoisting system including a drive for moving connecting device and emergency brakes to inhibit motion of the connecting device; wherein the hoisting system is to be operated at least in a hoisting mode and in an active heave compensation mode; wherein hoisting system is to perform an active heave compensation when operated in the active heave compensation mode and to operate without active heave compensation when operated in the hoisting mode; wherein the emergency brakes are operable in a normally-energized mode including a de-energized state where the emergency brakes engage so as to inhibit motion of the connecting device relative to the floating vessel; wherein the hoisting system is operable in a fixed-to-bottom mode; wherein the hoisting system is to perform an active heave compensation when operated in fixed-to-bottom mode; and wherein the hoisting system is adapted to prevent the emergency brakes from engaging.
    Type: Grant
    Filed: April 22, 2014
    Date of Patent: April 25, 2017
    Assignee: MAERSK DRILLING A/S
    Inventor: Jesper Holck
  • Patent number: 9624739
    Abstract: An offshore drilling rig comprising a drill floor deck having a hole defining a first well center. The drilling rig may further include a first hoisting system configured for hoisting and lowering tubular equipment through the first well center. The drilling rig may further include first pipe handling equipment for presenting tubular equipment to the first hoisting system so as to allow the first hoisting system to hoist or lower the tubular equipment through the first well center.
    Type: Grant
    Filed: January 13, 2014
    Date of Patent: April 18, 2017
    Assignee: MAERSK DRILLING A/S
    Inventors: Michael Kannegaard, Allan McColl
  • Patent number: 9458680
    Abstract: Disclosed herein are embodiments of an offshore drilling rig comprising a drill floor deck having a hole defining a first well center. Embodiments of the drilling rig further comprise a first mast upwardly extending relative to the drill floor deck, and a first hoisting system supported by the first mast and configured for hoisting and lowering tubular equipment through the first well center. The first mast is located on a first side of the first well center. Embodiments of the drilling rig further comprise first pipe handling equipment for presenting tubular equipment to the first hoisting system so as to allow the first hoisting system to hoist or lower the tubular equipment through the first well center.
    Type: Grant
    Filed: February 21, 2013
    Date of Patent: October 4, 2016
    Assignee: MAERSK DRILLING A/S
    Inventors: Michael Kannegaard, Allan McColl
  • Patent number: 9416600
    Abstract: A conductor pipe support system for a bottom-supported offshore drilling rig, the conductor pipe support system including a guide member configured for supporting a conductor pipe against horizontal movement when the conductor pipe extends from a blow-out preventer downward towards the seabed; a support member configured for vertically supporting at least a part of the load of the conductor pipe; and an access platform for allowing personnel to access at least a bottom portion of the blow-out preventer system; wherein the support member is connectable to the conductor pipe below the access platform.
    Type: Grant
    Filed: March 4, 2015
    Date of Patent: August 16, 2016
    Assignee: MAERSK DRILLING A/S
    Inventor: Nikolaj Golovinskij
  • Publication number: 20160090794
    Abstract: An offshore drilling rig configured for lowering and/or raising a string of tubular equipment into a subsea borehole. The drilling rig includes a drill deck; a first hoisting system being adapted for raising or lowering a first load carrier along a vertical first hoisting axis, wherein the first hoisting system is supported by a first support structure extending upwardly relative to the drill deck; a second hoisting system being adapted for raising or lowering a second load carrier along a vertical second hoisting axis located apart from the first hoisting axis, wherein the second hoisting system is supported by a second support structure extending upwardly relative to the drill deck; and a joint operations well centre on the drill deck. During joint operations, the first and second hoisting axes are preferably located apart from the joint operations well centre.
    Type: Application
    Filed: May 20, 2014
    Publication date: March 31, 2016
    Applicant: MAERSK DRILLING A/S
    Inventor: Jesper HOLCK
  • Publication number: 20160090797
    Abstract: An offshore drilling rig including a drill floor deck having one or more holes, each defining a well centre; one or more masts upwardly extending relative to the drill floor deck, and one or more hoisting systems, each supported by at least one of the one or more masts and configured for hoisting and lowering tubular equipment through at least one of the one or more well centres; a storage area for accommodating marine riser joints in upright orientation side by side in respective upright storage positions; a riser handling apparatus, different from the hoisting systems, adapted to move at least one of said marine riser joints along a movement path between its upright storage position and a prostrate maintenance/transfer position on a maintenance/transfer area, which movement path does not intersect any of the well centres.
    Type: Application
    Filed: May 20, 2014
    Publication date: March 31, 2016
    Applicant: Mærsk Drilling A/S
    Inventors: Jesper HOLCK, Frederik SMIDTH, Michael KANNEGAARD
  • Publication number: 20160083228
    Abstract: An offshore floating vessel includes a hoisting system including a drive for moving connecting device and emergency brakes to inhibit motion of the connecting device; wherein the hoisting system is to be operated at least in a hoisting mode and in an active heave compensation mode; wherein hoisting system is to perform an active heave compensation when operated in active heave compensation mode and to operate without active heave compensation when operated in the hoisting mode; wherein the emergency brakes are operable in a normally-energized mode including a de-energized state where the emergency brakes engage so as to inhibit motion of the connecting device relative to the floating vessel; wherein the hoisting system is operable in a fixed-to-bottom mode; wherein the hoisting system is to perform an active heave compensation when operated in fixed-to-bottom mode; and wherein the hoisting system is adapted to prevent the emergency brakes from engaging.
    Type: Application
    Filed: April 22, 2014
    Publication date: March 24, 2016
    Applicant: MAERSK DRILLING A/S
    Inventor: Jesper HOLCK
  • Publication number: 20160032659
    Abstract: An offshore drilling rig comprising a drill deck, at least one work center arranged in the drill deck; a diverter system operatively connectable at least to a riser extending towards the seafloor; a hoisting system adapted for raising or lowering tubular equipment through the work center; wherein the offshore drilling rig comprises a first positioning system configured for positioning at least the work center and/or the diverter system and/or a riser tensioning system selectively at a first horizontal position and a second horizontal position, different from the first horizontal position; and wherein the hoisting system is operable to raise or lower tubular equipment through the work center when said work center is positioned at said first horizontal position.
    Type: Application
    Filed: March 17, 2014
    Publication date: February 4, 2016
    Applicant: Mærsk Drilling A/S
    Inventors: Michael KANNEGAARD, Allan McCOLL, Jesper HOLCK
  • Publication number: 20150354294
    Abstract: An offshore drilling rig comprising a drill floor deck having a hole defining a first well centre. The drilling rig may further include a first hoisting system configured for hoisting and lowering tubular equipment through the first well centre. The drilling rig may further include first pipe handling equipment for presenting tubular equipment to the first hoisting system so as to allow the first hoisting system to hoist or lower the tubular equipment through the first well centre.
    Type: Application
    Filed: January 13, 2014
    Publication date: December 10, 2015
    Applicant: MÆRSK DRILLING A/S
    Inventors: Michael Kannegaard, Allan McColl
  • Publication number: 20150354293
    Abstract: Embodiments of an offshore drilling rig including a drill floor deck having a hole defining a first well centre; a first mast upwardly extending relative to the drill floor deck; a first hoisting system supported by the first mast and configured for hoisting and lowering tubular equipment through the first well centre; wherein the load bearing structure of the first hoisting system is displaced from and located on a first side of the first well centre; first pipe handling equipment for moving tubular equipment to the first hoisting system so as to allow the first hoisting system to hoist or lower the tubular equipment through the first well centre; wherein the first pipe handling equipment is operable to move tubular equipment at least partly underneath the load bearing structure and/or through a gap formed in said load bearing structure.
    Type: Application
    Filed: January 13, 2014
    Publication date: December 10, 2015
    Applicant: MÆRSK DRILLING A/S
    Inventors: Michael Kannegaard, Allan McColl
  • Publication number: 20150252634
    Abstract: A conductor pipe support system for a bottom-supported offshore drilling rig, the conductor pipe support system including a guide member configured for supporting a conductor pipe against horizontal movement when the conductor pipe extends from a blow-out preventer downward towards the seabed; a support member configured for vertically supporting at least a part of the load of the conductor pipe; and an access platform for allowing personnel to access at least a bottom portion of the blow-out preventer system; wherein the support member is connectable to the conductor pipe below the access platform.
    Type: Application
    Filed: March 4, 2015
    Publication date: September 10, 2015
    Applicant: MAERSK DRILLING A/S
    Inventor: Nikolaj GOLOVINSKIJ