Patents Assigned to State Energy Investment Group Co. LTD
  • Patent number: 11674393
    Abstract: A method for constructing a dam inside a dump of an inner-dump strip mine includes: taking an upper surface connection line of a primary water-resisting layer as upper filling reference datum boundary of an artificial water-resisting layer; arranging a dam foundation pit and a trapezoidal abutment on a midline of the dam foundation pit; building and reinforcing a step-shaped retaining dam core wall on the artificial water-resisting layer; laying a foundation impervious layer, waterproof geotextile, and an earth blanket on one side, close to the primary aquifer, of the retaining dam core wall; strengthening advance of a dumping working face on one side, away from the primary aquifer, of the retaining dam core wall, and dumping overburden of a strip mine to form a support; filling a space between the earth blanket and the primary aquifer to form a blocker; and proceeding with construction and forming a continuous retaining dam.
    Type: Grant
    Filed: March 25, 2022
    Date of Patent: June 13, 2023
    Assignees: China University of Mining and Technology, State Energy Investment Group Co. LTD, Jiangsu Vocational Institute of Architectural Technology
    Inventors: Shuzhao Chen, Quansheng Li, Liu Han, Cangyan Xiao
  • Publication number: 20220333486
    Abstract: A method for constructing a dam inside a dump of an inner-dump strip mine includes: taking an upper surface connection line of a primary water-resisting layer as upper filling reference datum boundary of an artificial water-resisting layer; arranging a dam foundation pit and a trapezoidal abutment on a midline of the dam foundation pit; building and reinforcing a step-shaped retaining dam core wall on the artificial water-resisting layer; laying a foundation impervious layer, waterproof geotextile, and an earth blanket on one side, close to the primary aquifer, of the retaining dam core wall; strengthening advance of a dumping working face on one side, away from the primary aquifer, of the retaining dam core wall, and dumping overburden of a strip mine to form a support; filling a space between the earth blanket and the primary aquifer to form a blocker; and proceeding with construction and forming a continuous retaining dam.
    Type: Application
    Filed: March 25, 2022
    Publication date: October 20, 2022
    Applicants: China University of Mining and Technology, State Energy Investment Group Co. LTD, Jiangsu Vocational Institute of Architectural Technology
    Inventors: Shuzhao CHEN, Quansheng LI, Liu HAN, Cangyan XIAO