Patents Assigned to Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
  • Patent number: 11683878
    Abstract: A fracturing well site system includes an electric-driven apparatus, a fuel-driven apparatus, an electric-power supply apparatus and a grounding system. The grounding system includes a first grounding terminal which is spaced from each of the electric-driven apparatus, the fuel-driven apparatus and the electric-power supply apparatus by a preset distance. The fuel-driven apparatus and at least one of the electric-driven apparatus and the electric-power supply apparatus are connected to the first grounding terminal, and the first grounding terminal is configured to ground the fuel-driven apparatus and the at least one of the electric-driven apparatus and the electric-power supply apparatus.
    Type: Grant
    Filed: July 20, 2022
    Date of Patent: June 20, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen Liu, Shouzhe Li, Zhuqing Mao
  • Patent number: 11677238
    Abstract: Embodiments of the present application provide electric power supply methods and electric power supply systems related to the field of electrical energy technology. An electric power supply method includes: acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system, and determining, based on the electrical energy parameter, whether a preset power supply condition for supplying power to a downstream target power-consuming system is met; determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when the preset power supply condition is met; controlling a supply of electric power to the target power-consuming system through the target distribution port.
    Type: Grant
    Filed: April 25, 2022
    Date of Patent: June 13, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Weiwei Liu, Kaishen Liu, Shouzhe Li, Zhuqing Mao, Haoliang Sun
  • Patent number: 11668289
    Abstract: A fracturing apparatus is provided. The fracturing apparatus includes: a plunger pump including a hydraulic end and a power end, the power end having a power end oil outlet and at least one power end oil inlet that are coupled to each other; and a power end lubricating system, including: a lubricating oil tank configured for defining an accommodation space, at least one lubrication pump having a lubrication pump oil inlet and a lubrication pump oil outlet that are coupled to each other, and at least one lubrication motor configured for providing power for the at least one lubrication pump, wherein at least a portion of at least one of the lubrication motor and the lubrication pump is located in the accommodation space.
    Type: Grant
    Filed: May 12, 2022
    Date of Patent: June 6, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Sheng Chang, Shuzhen Cui, Liang Lv, Jifeng Zhong, Shanwu Fu, Chunqiang Lan, Ruijie Du, Jian Zhang
  • Patent number: 11668173
    Abstract: A fracturing device includes a power unit, and the power unit includes a muffling compartment, a turbine engine, and an air intake unit. The air intake unit is communicated with the turbine engine through an intake pipe and configured to provide a combustion-supporting gas to the turbine engine; the air intake unit is at a top of the muffling compartment and the muffling compartment has an accommodation space, the turbine engine is within the accommodation space.
    Type: Grant
    Filed: August 10, 2021
    Date of Patent: June 6, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Peng Zhang, Rikui Zhang, Liang Lv, Xiaolei Ji, Chunqiang Lan, Yipeng Wu, Xincheng Li, Yuxuan Sun
  • Publication number: 20230167776
    Abstract: The application discloses a speed reducer and a fracturing apparatus, the speed reducer may be used to connect to a turbine engine and comprises a housing, a planet carrier, a connecting flange, a planet shaft, a planet gear, a sun gear, a ring gear, an input shaft and an output shaft; the housing may be connected to the planet carrier, the connecting flange may be connected to the planet carrier and may be used to connect to the turbine engine; the planet shaft may be connected to the planet carrier, the planet gear may be sleeved on the planet shaft, one end of the input shaft may be used to connect to an output end of the turbine engine and the other end of the input shaft may be sleeved with the sun gear which is engaged with the planet gear, the ring gear may be engaged with the planet gear and connected to the output shaft.
    Type: Application
    Filed: December 28, 2022
    Publication date: June 1, 2023
    Applicant: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Haiping CUI, Xiaosong WEI, Wenping CUI
  • Patent number: 11662384
    Abstract: The present disclosure relates to a motor malfunction monitoring device, and a drive motor for oilfield operations including: a signal acquisition module configured to acquire operation data of the drive motor, wherein the signal acquisition module comprises a vibration signal acquisition unit and/or an electrical signal acquisition unit, the vibration signal acquisition unit comprises one or more vibration sensors mounted at a component to be detected of the drive motor during use and provided for detecting transverse vibration and/or longitudinal vibration, and/or the electrical signal acquisition unit comprises a voltage sensor and a current sensor for detecting a voltage and a current of the drive motor, respectively; a data storage module storing therein a database of normal operation spectrums created when the drive motor runs normally; and a signal analysis module configured to extract an acquired operation data spectrum of the operation data acquired, compare the acquired operation data spectrum with
    Type: Grant
    Filed: January 22, 2021
    Date of Patent: May 30, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen Liu, Shouzhe Li, Haiping Xing, Zhuqing Mao, Weiwei Liu, Liang Li, Dawei Zhao, Jun Zhang
  • Publication number: 20230160289
    Abstract: The present disclosure relates to a high and low pressure manifold fluid supply system for fracturing units, including: a trailer, a high and low pressure manifold arranged on the trailer, a support frame arranged on a platform of the trailer, and a power distribution switch cabinet arranged on the support frame, which is configured to be electrically connected to the electrically-driven fracturing units and configured to distribute electricity to the electrically-driven fracturing units. Through the high and low pressure manifold fluid supply system integrated with electricity supply facilities therein according to the present disclosure, the electrically-driven fracturing units are powered, in this way, the electricity supply and distribution system in the well site can be effectively simplified, the connection distance of the cables can be shorten, and further the time spent on connection can be saved, thereby improving the well site layout efficiency.
    Type: Application
    Filed: January 11, 2023
    Publication date: May 25, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Shuzhen CUI, Yibo JIANG, Chunqiang LAN, Kun ZHANG
  • Publication number: 20230160510
    Abstract: A flexible pipe end portion connection structure is provided. The flexible pipe end portion connection structure includes a flexible pipe body and a joint. The joint includes a first end and a second end opposite to each other and has a channel extending through the joint in a direction from the first end to the second end. An inner sidewall of the first end of the joint has a plurality of first stepped structures, and an inner diameter of a portion of the channel corresponding to the first stepped structure gradually decreases in the direction from the first end to the second end. At least a part of an end of the flexible pipe body is inserted into the first end of the joint to fit with the first stepped structure.
    Type: Application
    Filed: January 9, 2023
    Publication date: May 25, 2023
    Applicant: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Dejian BAO, Guoling JU, Shulin ZHANG, Yilong ZHU
  • Publication number: 20230151722
    Abstract: A fracturing apparatus, a starting method thereof and a fracturing apparatus set. The fracturing apparatus includes a fracturing pump, an electric motor and a start device; the fracturing pump is configured to pressurize low-pressure fluid into high-pressure fluid; the electric motor includes a first winding and a second winding; the start device includes a first switch and a second switch. Impedance of the first winding is greater than impedance of the second winding. One terminal of the first switch is connected with the first winding, the other terminal of the first switch is connected with the power supply device, one terminal of the second switch is connected with the second winding, and the other terminal of the second switch is connected with the power supply device.
    Type: Application
    Filed: March 18, 2022
    Publication date: May 18, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Shuzhen CUI, Sheng CHANG, Shouzhe LI, Dawei ZHAO, Liang LV, Xincheng LI
  • Publication number: 20230151723
    Abstract: An example turbine fracturing apparatus and an example turbine fracturing well site are disclosed. The turbine fracturing apparatus may include a turbine engine, configured to provide power; a deceleration device, having an input end and a plurality of output ends, the input end being connected with the turbine engine; a plurality of plunger pumps, connected with the plurality of output ends, respectively, each of the plurality of plunger pumps being configured to intake low-pressure fluid and discharge high-pressure fluid; and an auxiliary power unit, configured to provide auxiliary power to at least one of the turbine engine, the deceleration device, or each of the plurality of plunger pumps. The auxiliary power unit, the turbine engine, and the deceleration device may be sequentially arranged.
    Type: Application
    Filed: June 9, 2022
    Publication date: May 18, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Xiaolei JI, Rikui ZHANG, Peng ZHANG, Jifeng ZHONG, Chunqiang LAN, Yipeng WU, Xincheng LI
  • Publication number: 20230145963
    Abstract: A combustion-gas supply system and a combustion-gas supply method thereof, a device equipped with a turbine engine, and a fracturing system are provided. The combustion-gas supply system includes a main pipeline and a multi-functional pipeline; the main pipeline includes a first sub-pipeline and a second sub-pipeline; the first sub-pipeline includes a first gas intake pipe, a first gas supply valve and a first gas outlet pipe arranged in sequence; the second sub-pipeline includes a combustion-gas supply valve and a gas supply pipe, the first gas outlet pipe is connected with the combustion-gas supply valve, the gas supply pipe is configured to be connected with a turbine engine, the multi-functional pipeline includes a second gas intake pipe, a second gas supply valve and a second gas outlet pipe arranged in sequence, and the second gas outlet pipe is communicated with the first gas outlet pipe.
    Type: Application
    Filed: April 7, 2022
    Publication date: May 11, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Peng Zhang, Rikui Zhang, Jianwei Wang, Xiaolei Ji, Zhuqing Mao
  • Publication number: 20230144116
    Abstract: The present application relates to a plunger pump, and the technical field of high-pressure media transport equipment. The plunger pump comprises a fixed component, a motion component and a fault diagnosis module, the motion component is provided on the fixed component, and the motion component is movable relative to the fixed component. The fault diagnosis module comprises a temperature sensing component and a processing unit, the fixed component is provided with one or more temperature detection holes, the temperature sensing component is at least partially located in the one or more temperature detection holes, and the temperature sensing component is contactable to lubricating oil flowing through the motion component; the processing unit is connected to the temperature sensing component, and the processing unit performs monitoring and fault diagnosis on the plunger pump based on a temperature value sensed by the temperature sensing component.
    Type: Application
    Filed: October 26, 2022
    Publication date: May 11, 2023
    Applicant: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Bingzhuang LI, Ruijie DU, Zhongquan SUN, Wenping CUI, Peng LI, Baoguo JIAN
  • Publication number: 20230138582
    Abstract: A cover, a fluid end and a plunger pump are provided. The cover includes: a body, the body being cylindrical, and the body including a first end, a second end, and a side surface connecting the first end and the second end; a main flow channel extending along an axis of the body; a plurality of subsidiary flow channels, each of the plurality of subsidiary flow channels being communicated with the main flow channel; a first opening, located at the first end and communicated with the main flow channel; and a plurality of second openings, located at the side surface of the body; each of the plurality of subsidiary flow channels being communicated with at least one of the plurality of second openings.
    Type: Application
    Filed: June 22, 2022
    Publication date: May 4, 2023
    Applicant: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Xiaobin LI, Baojie WANG, Jixin WANG, Peng LI, Chen JIANG, Haiping CUI, Shulin ZHANG, Anpeng GE
  • Publication number: 20230119876
    Abstract: An operation method of a turbine fracturing device and a turbine fracturing device are provided. The turbine fracturing device includes a turbine engine, a speed reducer, a brake mechanism, and a fracturing pump, the method includes: driving, by the turbine engine, the fracturing pump to perform a fracturing operation through the speed reducer so as to keep the fracturing pump in an operating state, the fracturing pump being configured to suck fluid of a first pressure and discharge fluid of a second pressure, the second pressure being greater than the first pressure; and in response to an idling instruction, the turbine engine entering an idling state and triggering a brake operation so as to keep the fracturing pump in a non-operating state.
    Type: Application
    Filed: December 15, 2022
    Publication date: April 20, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Zhuqing MAO, Rikui ZHANG, Peng ZHANG, Jianwei WANG, Jihua WANG, Xiaolei JI, Xincheng LI, Yuxuan SUN, Yipeng WU, Chunqiang LAN, Liang LV
  • Publication number: 20230119896
    Abstract: The present disclosure is directed to a system for fracturing operation in oil/gas fields. The disclosed fracturing system is integrated onto a semitrailer that can be conveniently transported to any oil field. The disclosed fracturing system further includes major components needed for delivering high-pressure fracturing fluid into a wellhead, including but not limited to at least one power generation source and at least one plunger pump driven by the at least one power generation source via simple transmission mechanisms utilizing reduction gearbox and/or transmission shafts. The power generation source, in particular, includes a turbine engine capable of being powered by 100% natural gasified liquid fuel.
    Type: Application
    Filed: October 19, 2022
    Publication date: April 20, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Rikui ZHANG, Xiance LI, Xincheng LI, Chunqiang LAN, Yipeng WU, Zhuqing MAO, Sheng CHANG, Xiaolei JI, Jixin WANG, Peng ZHANG
  • Publication number: 20230117362
    Abstract: Disclosed is a gas fuel supply system including a main fuel inlet, a pressure regulating valve, a pneumatically controlled shutoff bleeder valve and a main fuel outlet that are connected through pipes. The pneumatically controlled shutoff bleeder valve includes a pneumatic control valve and a shutoff bleeder valve. The shutoff bleeder valve is configured to open or close a gas fuel delivery passage from the main fuel inlet to the main fuel outlet, or configured to discharge the gas fuel in the pipe. The pneumatic control valve is configured to control the shutoff bleeder valve to be in a desired state. The gas fuel supply system does not need connection to an additional gas source, and the gas supply stability is improved.
    Type: Application
    Filed: January 7, 2022
    Publication date: April 20, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Haibo ZHANG, Lining XU, Wangwang ZHUO, Ting ZHANG, Qiong WU, Wanchun ZHA, Jianglei ZOU, Fulun BI, Cong ZHANG
  • Publication number: 20230120810
    Abstract: A fracturing apparatus is provided. The fracturing apparatus includes a plunger pump, a transmission shaft, a main motor, an oil pipe, a first radiator and a noise reduction cabin. The main motor is spaced apart from the plunger pump, the plunger pump is connected with the main motor through the transmission shaft; the oil pipe is configured to be connected with the plunger pump; the first radiator is spaced apart from the plunger pump, the first radiator is configured to dissipate heat from oil in the oil pipe, the main motor, the first radiator and at least part of the oil pipe are all located inside the noise reduction cabin, and the plunger pump is located outside the noise reduction cabin.
    Type: Application
    Filed: March 18, 2022
    Publication date: April 20, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Shanwu FU, Ruijie DU, Jian ZHANG, Jifeng ZHONG, Sheng CHANG, Xiaolei JI
  • Patent number: 11629589
    Abstract: Embodiments of the present disclosure provide a ferromagnetic object detection device and a method for detecting a tubing coupling. The ferromagnetic object detection device includes a support tube, a magnetic field generating device and a magnetic detection device. The support tube includes a space penetrating in a first direction; the magnetic field generating device is located on an outer sidewall of the support tube and configured to generate a magnetic field; the magnetic field detection device includes a first magnetic field detection element, a second magnetic field detection element and a third magnetic field detection element.
    Type: Grant
    Filed: July 8, 2021
    Date of Patent: April 18, 2023
    Assignee: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Haojie Lin, Xin Wang, Haiping Xing, Feng Gao, Shouzhe Li, Kai Wang, Mingxing Li
  • Publication number: 20230116458
    Abstract: A power supply system for an electrically driven wellsite facility is provided. The power supply system includes a combined power supply module configured to be connected with the electrically driven wellsite facility, the combined power supply module comprising at least one generator and at least one power distribution station, wherein the at least one generator and the at least one power distribution station are disposed in parallel or combined to a power grid for supplying power to the electrically driven wellsite facility.
    Type: Application
    Filed: March 11, 2022
    Publication date: April 13, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen LIU, Shouzhe LI, Jifeng ZHONG, Zhuqing MAO
  • Publication number: 20230107300
    Abstract: A fracturing manifold skid and a fracturing manifold skid set are provided. The fracturing manifold skid includes a skid base assembly and a first manifold assembly. The first manifold assembly is installed on the skid base assembly and includes a first transport pipe and a second transport pipe, and a first connecting pipe and a second connecting pipe. The first connecting pipe is connected with the first transport pipe at a first position and connected with the second transport pipe at a second position; the second connecting pipe is connected with the first transport pipe at a third position and connected with the second transport pipe at a fourth position. The first transport pipe is provided with a first valve located between the first and third positions; the second transport pipe is provided with a second valve located between the second and fourth positions.
    Type: Application
    Filed: December 12, 2022
    Publication date: April 6, 2023
    Applicant: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Jinling HUANG, Siwu REN, Wenlong ZUO, Weixin LIN