Patents by Inventor Alexander Pozdneev

Alexander Pozdneev has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10678967
    Abstract: A plurality of development scenarios is determined. At least a first well is drilled at a first location and trajectory that are common to the plurality of development scenarios. A result of the at least one first well is assessed. A first subset of development scenarios is selected from the plurality of development scenarios based at least on the result of the first well. A first sequence of subsequent wells, including at least one well, are drilled at a first sequence of subsequent locations and trajectories that are common to the first subset of development scenarios.
    Type: Grant
    Filed: October 21, 2016
    Date of Patent: June 9, 2020
    Assignees: International Business Machines Corporation, GAZPROMNEFT SCIENCE & TECHNOLOGY CENTRE LLC
    Inventors: Vladimir M. Babin, David Echeverria Ciaurri, Bruno Da Costa Flach, Arseniy Gruzdev, Miguel Paredes Quinones, Alexander Pozdneev, Artyom Semenikhin, Oleg S. Ushmaev, Andrey M. Vashevnik
  • Patent number: 10546355
    Abstract: Configuring well settings may include determining schedules over a mid-term horizon for well settings for all or a subset of wells in an oil field. The schedule may be generated so that a performance metric for the considered horizon is maximized. An economic metric, for example, a net present value, and production metrics, for example, cumulative oil production, are considered. Minimum acceptable short-term and long-term metrics, for example, short-term and long-term cumulative field oil production, may be included as target/constraints.
    Type: Grant
    Filed: October 20, 2016
    Date of Patent: January 28, 2020
    Assignee: International Business Machines Corporation
    Inventors: Vladimir M. Babin, David Echeverria Ciaurri, Nikolay G. Glavnov, Maria Golitsyna, Ramil R. Yaubatyrov, Alexander Pozdneev, Artyom Semenikhin, Oleg S. Ushmaev
  • Publication number: 20180113962
    Abstract: A plurality of development scenarios is determined. At least a first well is drilled at a first location and trajectory that are common to the plurality of development scenarios. A result of the at least one first well is assessed. A first subset of development scenarios is selected from the plurality of development scenarios based at least on the result of the first well. A first sequence of subsequent wells, including at least one well, are drilled at a first sequence of subsequent locations and trajectories that are common to the first subset of development scenarios.
    Type: Application
    Filed: October 21, 2016
    Publication date: April 26, 2018
    Inventors: Vladimir M. Babin, David Echeverria Ciaurri, Bruno Da Costa Flach, Arseniy Gruzdev, Miguel Paredes Quinones, Alexander Pozdneev, Artyom Semenikhin, Oleg S. Ushmaev, Andrey M. Vashevnik
  • Publication number: 20180114281
    Abstract: Configuring well settings may include determining schedules over a mid-term horizon for well settings for all or a subset of wells in an oil field. The schedule may be generated so that a performance metric for the considered horizon is maximized. An economic metric, for example, a net present value, and production metrics, for example, cumulative oil production, are considered. Minimum acceptable short-term and long-term metrics, for example, short-term and long-term cumulative field oil production, may be included as target/constraints.
    Type: Application
    Filed: October 20, 2016
    Publication date: April 26, 2018
    Inventors: Vladimir M. Babin, David Echeverria Ciaurri, Nikolay G. Glavnov, Maria Golitsyna, Ramil R. Iaubatyrov, Alexander Pozdneev, Artyom Semenikhin, Oleg S. Ushmaev