Patents by Inventor Amjad H. Ashri

Amjad H. Ashri has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10584577
    Abstract: Provided are systems and methods of hydrocarbon well monitoring, assessment and development including: obtaining wellhead production data for a well; determining, based on the wellhead production data for the well, observed constant wellhead production rates for the well; for each of the observed constant wellhead production rates, determining a corresponding wellhead pressure and a cumulative production volume for each occurrence of the observed wellhead production rate, and a depletion rate for the observed constant wellhead production rate; determining, based on the depletion rates for the observed constant wellhead production rates, a depletion rate for the well that is indicative of a change in a flowing wellhead pressure of the well as a function of production volume of the well. Embodiments include undertaking well and reservoir development operations based on the depletion rate determined for the well.
    Type: Grant
    Filed: March 13, 2018
    Date of Patent: March 10, 2020
    Assignee: Saudi Arabian Oil Company
    Inventors: Meftah Y. Tiss, Amjad H. Ashri, Abdullah A. Al-Utaibi, AbdulRahman M. Al-Nutaifi, Bestman Somiari
  • Publication number: 20190284926
    Abstract: Provided are systems and methods of hydrocarbon well monitoring, assessment and development including: obtaining wellhead production data for a well; determining, based on the wellhead production data for the well, observed constant wellhead production rates for the well; for each of the observed constant wellhead production rates, determining a corresponding wellhead pressure and a cumulative production volume for each occurrence of the observed wellhead production rate, and a depletion rate for the observed constant wellhead production rate; determining, based on the depletion rates for the observed constant wellhead production rates, a depletion rate for the well that is indicative of a change in a flowing wellhead pressure of the well as a function of production volume of the well. Embodiments include undertaking well and reservoir development operations based on the depletion rate determined for the well.
    Type: Application
    Filed: March 13, 2018
    Publication date: September 19, 2019
    Inventors: Meftah Y. Tiss, Amjad H. Ashri, Abdullah A. Al-Utaibi, AbdulRahman M. Al-Nutaifi, Bestman Somiari