Patents by Inventor Enrico Sonno

Enrico Sonno has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20110180381
    Abstract: A method and an apparatus based on a reactor vessel (201) that is brought to a predetermined vacuum degree, in particular said vacuum degree set between 2 and 6 absolute millibar, an to a high temperature. A waste material is continuously introduced in the vessel (202), in particular a solid waste material (5) is introduced in such a way that a vacuum loss from the vessel (201) is prevented. Owing to the high temperature, waste material (5) forms a plasma that undergoes a molecular rearrangement, which gives origin to a substantially liquid residue that is collected in a bottom portion (204) of reactor (201), and to a gas (11). The gas (11), which mainly comprises carbon monoxide, hydrogen, carbon dioxide and steam, i.e. a typical syngas composition, is continuously taken away from the vessel (201) through a duct (12), and is sent to subsequent treatments to obtain a gas fuel that can be burnt by devices such as a gas turbine, a motor or a boiler.
    Type: Application
    Filed: August 10, 2009
    Publication date: July 28, 2011
    Applicant: RE.CO 2 S.R.L.
    Inventors: Mario Fabbri, Enrico Sonno
  • Publication number: 20110162523
    Abstract: A plasma method and apparatus for purifying an offgas containing inorganic and organic pollutants. A plasma torch (26) is formed by interaction of the offgas (6) with an electric field (E) created by a voltage (V) applied between one or more couples of electrodes (16) arranged upstream/along a purification chamber (1); the electric field is such that an electric discharge takes place which ionizes the offgas (6) and causes a redistribution of atoms/molecules, thus creating longer molecules, which form a liquid residue (23), and shorter molecules, which form a purified gas (7). The gas undergoes an expansion that is caused by a diverging portion (21) of the purification chamber and assists preliminary cooling of the of fgas/purified gas (6/7). A tube-bundle exchanger (2) is provided and has a cross section larger than the outlet port (14) of the chamber to allow further expansion/cooling. A scrubber (3) is arranged downstream exchanger (2).
    Type: Application
    Filed: August 6, 2009
    Publication date: July 7, 2011
    Applicant: RE.CO 2 S.R.L.
    Inventors: Mario Fabbri, Enrico Sonno