Patents by Inventor Eugenia Stamm

Eugenia Stamm has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 6808335
    Abstract: A method of reconstructing existing roadway (21) on order to restore structural integrity of bridge roadway (23) with minimal disruption of traffic. First elevated roadway (41), which comprises a plurality of interconnected ramp units and bridging units, is erected in multiple steps by initially erecting an initial portion of roadway (41) from entrance/exit ramp units (45) and (46) with their uppermost ends facing each other. Then repeatedly, during periods of off-peak traffic, until roadway (41) is erected, performing a step of creating a gap in a previously erected portion of roadway (41) by moving ramp unit (45) along roadway (21), erecting a bridging unit in the gap, and opening an extended portion of roadway (41) to traffic prior to the next period of peak traffic. Structural integrity of roadway (23) is then restored by repeatedly closing a number of existing travel lanes to traffic, while rerouting traffic onto the newly erected roadway (41), and restoring the closed travel lanes without interruption.
    Type: Grant
    Filed: February 3, 2003
    Date of Patent: October 26, 2004
    Inventors: Anna Stamm, Eugenia Stamm, Rolan Stamm
  • Patent number: 6676330
    Abstract: A method of erecting a new elevated roadway (41) above an existing roadway (21) in order to increase traffic capacity of bridge roadway (23) with minimal disruption of existing traffic. Roadway (41), which comprises a plurality of interconnected ramp units and bridging units, is erected in multiple steps by initially erecting entrance/exit ramp unit (46) and moveable ramp unit (45) with their uppermost ends facing each other, then intermittently, during periods of off-peak traffic, creating a gap in a previously erected portion of roadway (41) by moving ramp unit (45) along roadway (21), erecting a bridging unit in the gap, and opening an extended portion of roadway (41) to traffic in time for the next period of peak traffic. This method can be used for reconstructing different types of bridges and highways.
    Type: Grant
    Filed: November 28, 2001
    Date of Patent: January 13, 2004
    Inventors: Anna Stamm, Eugenia Stamm, Rolan Stamm
  • Publication number: 20030123932
    Abstract: A method of reconstructing existing roadway (21) on order to restore structural integrity of bridge roadway (23) with minimal disruption of traffic. First elevated roadway (41), which comprises a plurality of interconnected ramp units and bridging units, is erected in multiple steps by initially erecting an initial portion of roadway (41) from entrance/exit ramp units (45) and (46) with their uppermost ends facing each other. Then repeatedly, during periods of off-peak traffic, until roadway (41) is erected, performing a step of creating a gap in a previously erected portion of roadway (41) by moving ramp unit (45) along roadway (21), erecting a bridging unit in the gap, and opening an extended portion of roadway (41) to traffic prior to the next period of peak traffic. Structural integrity of roadway (23) is then restored by repeatedly closing a number of existing travel lanes to traffic, while rerouting traffic onto the newly erected roadway (41), and restoring the closed travel lanes without interruption.
    Type: Application
    Filed: February 3, 2003
    Publication date: July 3, 2003
    Inventors: Anna Stamm, Eugenia Stamm, Rolan Stamm
  • Publication number: 20020064424
    Abstract: A method of erecting a new elevated roadway (41) above an existing roadway (21) in order to increase traffic capacity and restore structural integrity of bridge roadway (23) with minimal disruption of traffic. Roadway (41), which comprises a plurality of interconnected ramp units and bridging units, is erected in multiple steps by initially erecting entrance/exit ramp units (43) and (45) with their uppermost ends facing each other. Then intermittently, during periods of off-peak traffic, creating a gap in a previously erected portion of roadway (41) by moving ramp unit (45) along roadway (21), erecting a bridging unit in the gap, and opening an extended portion of roadway (41) to traffic during periods of peak traffic. Structural integrity of roadway (23) is then restored by repeatedly closing a number of existing travel lanes to traffic, while rerouting traffic onto the newly erected roadway (41), and restoring structural integrity of the closed travel lanes without interruption.
    Type: Application
    Filed: November 28, 2001
    Publication date: May 30, 2002
    Inventors: Anna Stamm, Eugenia Stamm, Rolan Stamm