Patents by Inventor Hamed Darabi

Hamed Darabi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11921170
    Abstract: A method for protecting a low-voltage distribution network. The low-voltage distribution network includes a low-voltage side of a three-phase distribution transformer that is configured to supply electrical power to at least one single-phase load through a respective distribution line of a plurality of three-phase distribution lines distribution lines. The method includes measuring variations of a periodic neutral-to-ground voltage between a neutral terminal of the three-phase distribution transformer and a local ground node by sampling the variations at a sampling frequency, detecting a fault in the low-voltage power distribution network based on the variations of the periodic neutral-to-ground voltage, and disconnecting the low-voltage side from the low-voltage power distribution network responsive to the fault being detected.
    Type: Grant
    Filed: April 15, 2022
    Date of Patent: March 5, 2024
    Assignees: ELECTRONIC SAZAN FAN ARIA COMPANY
    Inventors: Mahdi Davarpanah, Ahmadreza Darabi, Pooria Allah Karami, Hamed Morsali
  • Patent number: 11466554
    Abstract: Embodiments are directed to managing and improving a drilling and completions process at a hydrocarbon extraction site, and to optimizing resource allocation at a hydrocarbon extraction site/region. In one scenario, a computer system accesses data generated by hardware sensors implemented by drilling and completion equipment at a hydrocarbon extraction site. The computer system formats the sensor data into a form readable by a data mining algorithm, and mines the formatted sensor data to identify characteristics related to the drilling and completion process. The computer system also accesses and integrates historical data related to the drilling and completion equipment at the hydrocarbon extraction site. The computer system then computes drilling and completion performance indicators that identify inefficiencies based on the characteristics identified for the equipment and based on the accessed historical data. Then, a remediation step is performed to resolve the identified inefficiency.
    Type: Grant
    Filed: March 20, 2019
    Date of Patent: October 11, 2022
    Assignee: QRI GROUP, LLC
    Inventors: Ali Karimi Vajargah, David Castineira, Zheren Ma, Cedric Gael Fraces Gasmi, Hamed Darabi
  • Patent number: 10508532
    Abstract: Embodiments are directed to automatically detecting an event in a production curve, generating a production estimate using a quantile regression and to performing a probabilistic decline curve analysis. In one scenario, a computer system identifies a candidate break point in a production decline curve which represents a decline in material production at a well. The computer system identifies one trend for the production decline curve occurring before the candidate break point and identifies a second trend for the production decline curve occurring after the candidate break point. The computer system calculates the difference between the first material production decline estimate and the second material production decline estimate and identifies the candidate break points where the difference between the first material production decline estimate and the second material production decline estimate is beyond a threshold value.
    Type: Grant
    Filed: August 26, 2015
    Date of Patent: December 17, 2019
    Assignee: QRI GROUP, LLC
    Inventors: Anirban Mondal, David Castiñeira Areas, Hamed Darabi, Sébastien François Matringe
  • Publication number: 20190325331
    Abstract: Embodiments are directed to identifying and implementing hydrocarbon production opportunities including recompletion opportunities, new vertical drill target opportunities, and horizontal or deviated well target opportunities. Computer systems access multi-disciplinary data, perform data validation and pre-processing on the data, identify field development opportunities by identifying candidates, forecasting production at those candidates, generating an uncertainty quantification, and vetting and validating the data. The computer systems then list the viable well target opportunities including recompletion opportunities, vertical new drill target opportunities and deviated and horizontal target opportunities.
    Type: Application
    Filed: April 19, 2019
    Publication date: October 24, 2019
    Inventors: Wassim Benhallam, Amir Salehi, Hamed Darabi, David Castineira, Aaron D. Close, Richard J. Heil
  • Publication number: 20190292908
    Abstract: Embodiments are directed to managing and improving a drilling and completions process at a hydrocarbon extraction site, and to optimizing resource allocation at a hydrocarbon extraction site/region. In one scenario, a computer system accesses data generated by hardware sensors implemented by drilling and completion equipment at a hydrocarbon extraction site. The computer system formats the sensor data into a form readable by a data mining algorithm, and mines the formatted sensor data to identify characteristics related to the drilling and completion process. The computer system also accesses and integrates historical data related to the drilling and completion equipment at the hydrocarbon extraction site. The computer system then computes drilling and completion performance indicators that identify inefficiencies based on the characteristics identified for the equipment and based on the accessed historical data. Then, a remediation step is performed to resolve the identified inefficiency.
    Type: Application
    Filed: March 20, 2019
    Publication date: September 26, 2019
    Inventors: Ali Karimi Vajargah, David Castineira, Zheren Ma, Cedric Gael Fraces Gasmi, Hamed Darabi