Patents by Inventor Ibrahim Said Abou-Sayed

Ibrahim Said Abou-Sayed has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11913330
    Abstract: A method for determining change in stress in a reservoir formation includes inducing a pressure pulse in a first well hydraulically connected by a fracture to the reservoir formation. A stress-related attribute of the fracture is determined from reflection events detected in pressure measurement made in the first well as a result of the inducing the pressure pulse. The inducing and determining are repeated to estimate changes in the stress-related attribute with respect to time. A method for determining and localizing type of interaction between a treated well and an observation well by monitoring pressure and fracture changes in the observation well.
    Type: Grant
    Filed: April 29, 2022
    Date of Patent: February 27, 2024
    Assignee: Seismos, Inc.
    Inventors: Daniel Moos, Jakub Felkl, Hossein Davari Ardakani, Ibrahim Said Abou-Sayed
  • Publication number: 20230399940
    Abstract: A method for determining properties of hydraulic fractures from measurements of pressure in a well made after stopping pumping fracturing fluid into the well (shut in) includes determining a first time after shut in whereinafter a decrease in measured pressure is caused by fluid leak off in a fracture. A second time after shut in is determined whereinafter the decrease in pressure is caused by fluid leak off, fracture growth and fluid pressure equilibration in the fracture. A third time after shut in is determined whereinafter the decrease in pressure is caused by fluid leak off, fracture growth, fluid pressure equilibration in the fracture and pressure drop in a near wellbore zone. Values of fluid efficiency, minimum stress and net pressure which are determined result in a calculated pressure with respect to time matching the pressure measurements within a predetermined threshold.
    Type: Application
    Filed: August 29, 2023
    Publication date: December 14, 2023
    Inventors: Saeed Rahimi-Aghdam, Ibrahim Said Abou-Sayed, Daniel Moos, David Murray
  • Publication number: 20220325621
    Abstract: A method for determining change in stress in a reservoir formation includes inducing a pressure pulse in a first well hydraulically connected by a fracture to the reservoir formation. A stress-related attribute of the fracture is determined from reflection events detected in pressure measurement made in the first well as a result of the inducing the pressure pulse. The inducing and determining are repeated to estimate changes in the stress-related attribute with respect to time. A method for determining and localizing type of interaction between a treated well and an observation well by monitoring pressure and fracture changes in the observation well.
    Type: Application
    Filed: April 29, 2022
    Publication date: October 13, 2022
    Inventors: Daniel Moos, Jakub Felkl, Hossein Davari Ardakani, Ibrahim Said Abou-Sayed