Patents by Inventor Javier Ciáurriz Martín

Javier Ciáurriz Martín has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9637944
    Abstract: The present invention relates to a method for assembling concrete towers with a decreasing sector for wind turbines which comprises a phase of pre-assembly of concrete tower sections which allows to reduce the space required during the stage of pre-assembly of the different tower section prior to lifting and the civil work associated to set said space up wherein, during the pre-assembly phase, a first annular section is confined at least partially within the inner space defined by a second annular section, the invention also relating to the wind turbine associated to said method of assembly.
    Type: Grant
    Filed: July 30, 2015
    Date of Patent: May 2, 2017
    Assignee: Acciona Windpower, S.A.
    Inventors: Teresa Arlaban Gabeiras, Ivan Garcia Maestre, Inigo Rubio Guillen, Jose Luis Aristegui Lantero, Javier Ciaurriz Martin, Jose Miguel Garcia Sayes, Miguel Nunez Polo
  • Publication number: 20160032610
    Abstract: The present invention relates to a method for assembling concrete towers with a decreasing sector for wind turbines which comprises a phase of pre-assembly of concrete tower sections which allows to reduce the space required during the stage of pre-assembly of the different tower section prior to lifting and the civil work associated to set said space up wherein, during the pre-assembly phase, a first annular section is confined at least partially within the inner space defined by a second annular section, the invention also relating to the wind turbine associated to said method of assembly.
    Type: Application
    Filed: July 30, 2015
    Publication date: February 4, 2016
    Inventors: Teresa Arlaban Gabeiras, Ivan Garcia Maestre, Inigo Rubio Guillen, Jose Luis Aristegui Lantero, Javier Ciaurriz Martin, Jose Miguel Garcia Sayes, Miguel Nunez Polo
  • Publication number: 20150211251
    Abstract: The invention describes a process and a unit, both enabling to attach a wind turbine tower to a foundation, as well as describes also a wind turbine incorporating the unit. The process features a stage of installation of a support element for the transmission of stresses from the tower to the foundation, followed by a stage of leveling the support element and pouring foundation concrete up to the support element's lower side so that the lower side is adhered to the poured concrete once it has set. The unit comprises at least one support element.
    Type: Application
    Filed: April 9, 2015
    Publication date: July 30, 2015
    Inventors: Iván GARCíA MAESTRE, Eduardo AZANZA LADRÓN, Koldo LARUMBE FERNANDINO, Carlos CERDÁN MARTÍNEZ, Teresa ARLABÁN GABEIRAS, Javier CIÁURRIZ MARTÍN, Javier FERNÁNDEZ DE MANZANOS, José Miguel GARCÍA SAYÉS, Miguel NUÑEZ POLO
  • Patent number: 9016005
    Abstract: The invention describes a process and a unit, both enabling to attach a wind turbine tower to a foundation, as well as describes also a wind turbine incorporating the unit. The process features a stage of installation of a support element for the transmission of stresses from the tower to the foundation, followed by a stage of levelling the support element and pouring foundation concrete up to the support element's lower side so that the lower side is adhered to the poured concrete once it has set. The unit comprises at least one support element.
    Type: Grant
    Filed: June 6, 2012
    Date of Patent: April 28, 2015
    Assignee: Acciona Windpower, S.A.
    Inventors: Iván García Maestre, Eduardo Azanza Ladrón, Koldo Larumbe Fernandino, Carlos Cerdán Martínez, Teresa Arlabán Gabeiras, Javier Ciáurriz Martín, Javier Fernández De Manzanos, José Miguel García Sayés, Miguel Nuñez Polo
  • Publication number: 20130125480
    Abstract: The invention describes a process and a unit, both enabling to attach a wind turbine tower to a foundation, as well as describes also a wind turbine incorporating the unit. The process features a stage of installation of a support element for the transmission of stresses from the tower to the foundation, followed by a stage of levelling the support element and pouring foundation concrete up to the support element's lower side so that the lower side is adhered to the poured concrete once it has set. The unit comprises at least one support element.
    Type: Application
    Filed: June 6, 2012
    Publication date: May 23, 2013
    Applicant: ACCIONA WINDPOWER, S.A.
    Inventors: Iván García Maestre, Eduardo Azanza Ladrón, Koldo Larumbe Fernandino, Carlos Cerdán Martínez, Teresa Arlabán Gabeiras, Javier Ciáurriz Martín, Javier Fernández De Manzanos, José Miguel García Sayés, Miguel Nuñez Polo