Patents by Inventor Mehdi Sebdani Mazrooee

Mehdi Sebdani Mazrooee has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11237076
    Abstract: Automatically pressure testing a frac iron configuration in a wellbore environment including performing a plurality of pressure testing cycles using increasing higher levels of fluid pressure to detect the presence of any leaks in the frac iron at one or more of the pressurization levels.
    Type: Grant
    Filed: August 26, 2019
    Date of Patent: February 1, 2022
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Mehdi Sebdani Mazrooee, Michael Linley Fripp, Ian Bradford Mitchell
  • Patent number: 11085282
    Abstract: A method for hydraulically fracturing a subterranean formation includes sending a first command from a controller to a pump to achieve a first target flow rate for a fracturing fluid being injected into a subterranean formation during a fracturing operation. Monitoring an injection property of the fracturing operation. Determining a rate of change of the pressure over a first time period. Determining, by the controller, a second target flow rate based, at least in part, on the rate of change of the pressure. Sending a second command from the controller to the pump to achieve the second target flow rate for the fracturing fluid.
    Type: Grant
    Filed: December 29, 2017
    Date of Patent: August 10, 2021
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Mehdi Sebdani Mazrooee, Michael Linley Fripp, Matthew Lewis Lahman, Mark Allen Adams
  • Publication number: 20210063271
    Abstract: Automatically pressure testing a frac iron configuration in a wellbore environment including performing a plurality of pressure testing cycles using increasing higher levels of fluid pressure to detect the presence of any leaks in the frac iron at one or more of the pressurization levels.
    Type: Application
    Filed: August 26, 2019
    Publication date: March 4, 2021
    Inventors: Mehdi Sebdani Mazrooee, Michael Linley Fripp, Ian Bradford Mitchell
  • Publication number: 20200056466
    Abstract: A method for hydraulically fracturing a subterranean formation includes sending a first command from a controller to a pump to achieve a first target flow rate for a fracturing fluid being injected into a subterranean formation during a fracturing operation. Monitoring an injection property of the fracturing operation. Determining a rate of change of the pressure over a first time period. Determining, by the controller, a second target flow rate based, at least in part, on the rate of change of the pressure. Sending a second command from the controller to the pump to achieve the second target flow rate for the fracturing fluid.
    Type: Application
    Filed: December 29, 2017
    Publication date: February 20, 2020
    Inventors: Mehdi Sebdani Mazrooee, Michael Linley Fripp, Matthew Lewis Lahman, Mark Allen Adams