Patents by Inventor Misfer Almarri

Misfer Almarri has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11846166
    Abstract: A method of increasing hydrocarbon recovery from a wellbore in a tight formation with greater breakdown pressures, the method including using hydro-jetting to effect a plurality of oriented cavities or discoidal grooves in the horizontal portion of the wellbore to overcome near-wellbore stresses, injecting a thermally controlled fluid into the wellbore to alter the temperature of the formation and lower stresses, and then fracturing the formation to generate a series of fractures that can be formed in a planar formation.
    Type: Grant
    Filed: August 15, 2022
    Date of Patent: December 19, 2023
    Inventors: Misfer Almarri, Waheed Syed Arshad, Adel Ali Al-Qahtani
  • Patent number: 11643914
    Abstract: A method of increasing hydrocarbon recovery from a wellbore in a tight formation with greater breakdown pressures, the method including using hydro-jetting to effect a plurality of oriented cavities or discoidal grooves in the horizontal portion of the wellbore to overcome near-wellbore stresses, injecting a thermally controlled fluid into the wellbore to alter the temperature of the formation and lower stresses, and then fracturing the formation to generate a series of fractures that can be formed in a planar formation.
    Type: Grant
    Filed: August 15, 2022
    Date of Patent: May 9, 2023
    Inventors: Misfer Almarri, Waheed Syed Arshad, Adel Ali Al-Qahtani
  • Publication number: 20220397026
    Abstract: A method of increasing hydrocarbon recovery from a wellbore in a tight formation with greater breakdown pressures, the method including using hydro-jetting to effect a plurality of oriented cavities or discoidal grooves in the horizontal portion of the wellbore to overcome near-wellbore stresses, injecting a thermally controlled fluid into the wellbore to alter the temperature of the formation and lower stresses, and then fracturing the formation to generate a series of fractures that can be formed in a planar formation.
    Type: Application
    Filed: August 15, 2022
    Publication date: December 15, 2022
    Applicant: SAUDI ARABIAN OIL COMPANY
    Inventors: Misfer ALMARRI, Waheed Syed ARSHAD, Adel Ali AL-QAHTANI
  • Publication number: 20220397025
    Abstract: A method of increasing hydrocarbon recovery from a wellbore in a tight formation with greater breakdown pressures, the method including using hydro-jetting to effect a plurality of oriented cavities or discoidal grooves in the horizontal portion of the wellbore to overcome near-wellbore stresses, injecting a thermally controlled fluid into the wellbore to alter the temperature of the formation and lower stresses, and then fracturing the formation to generate a series of fractures that can be formed in a planar formation.
    Type: Application
    Filed: August 15, 2022
    Publication date: December 15, 2022
    Applicant: SAUDI ARABIAN OIL COMPANY
    Inventors: Misfer ALMARRI, Waheed Syed ARSHAD, Adel Ali AL-QAHTANI
  • Patent number: 11448054
    Abstract: A method of increasing hydrocarbon recovery from a wellbore in a tight formation with greater breakdown pressures, the method including using hydro-jetting to effect a plurality of oriented cavities or discoidal grooves in the horizontal portion of the wellbore to overcome near-wellbore stresses, injecting a thermally controlled fluid into the wellbore to alter the temperature of the formation and lower stresses, and then fracturing the formation to generate a series of fractures that can be formed in a planar formation.
    Type: Grant
    Filed: May 19, 2020
    Date of Patent: September 20, 2022
    Inventors: Misfer Almarri, Waheed Syed Arshad, Adel Ali Al-Qahtani
  • Publication number: 20210363868
    Abstract: A method of increasing hydrocarbon recovery from a wellbore in a tight formation with greater breakdown pressures, the method including using hydro-jetting to effect a plurality of oriented cavities or discoidal grooves in the horizontal portion of the wellbore to overcome near-wellbore stresses, injecting a thermally controlled fluid into the wellbore to alter the temperature of the formation and lower stresses, and then fracturing the formation to generate a series of fractures that can be formed in a planar formation.
    Type: Application
    Filed: May 19, 2020
    Publication date: November 25, 2021
    Applicant: Saudi Arabian Oil Company
    Inventors: Misfer Almarri, Waheed Syed Arshad, Adel Ali Al-Qahtani