Patents by Inventor Partha S. Sarathi

Partha S. Sarathi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 8607867
    Abstract: A method for recovering heavy oil in a stratum with an injection well, a production well and a steam generator. The method begins by injecting steam from the steam generator into a horizontal portion of the injection well followed by soaking the stratum with the steam from the injection well for a predetermined period of time; and producing heavy oil from the stratum with the production well.
    Type: Grant
    Filed: October 19, 2010
    Date of Patent: December 17, 2013
    Assignee: ConocoPhillips Company
    Inventors: Partha S. Sarathi, Riley B. Needham, Robert Scott Redman
  • Patent number: 8381810
    Abstract: An underground reservoir is provided comprising an injection well and a production well. The production well has a horizontal section oriented generally perpendicularly to a generally linear and laterally extending, upright combustion front propagated from the injection well.
    Type: Grant
    Filed: September 15, 2010
    Date of Patent: February 26, 2013
    Assignee: ConocoPhillips Company
    Inventors: Wayne R. Dreher, Jr., Partha S. Sarathi
  • Patent number: 8353340
    Abstract: Methods and apparatus relate to in situ combustion. Configurations of the injection and production wells facilitate the in situ combustion. Utilizing wet combustion for some embodiments promotes heat displacement for hydrocarbon recovery with procedures in which one or more of the production and injection wells are configured with lengths deviated from vertical. In some embodiments for either dry or wet combustion, at least the production wells define intake lengths deviated from vertical and that are disposed at staged levels within a formation. Each of the productions wells during the in situ combustion allow for recovery of hydrocarbons through gravity drainage. Vertical separation between the intake lengths of the production wells enables differentiated and efficient removal of combustion gasses and the hydrocarbons.
    Type: Grant
    Filed: July 16, 2010
    Date of Patent: January 15, 2013
    Assignee: ConocoPhillips Company
    Inventors: Partha S. Sarathi, Wayne Reid Dreher, Jr., Riley Bryan Needham, Abhishek Dutta
  • Patent number: 8118095
    Abstract: Methods and systems relate to in situ combustion utilizing configurations of injection and production wells to facilitate the in situ combustion. The wells define vertically deviated lengths that have different orientations from one another. Further, heating processes such as resistive heating and cyclic steam stimulation may take place in one or both of the injection and production wells to precondition a reservoir prior to the in situ combustion.
    Type: Grant
    Filed: February 17, 2010
    Date of Patent: February 21, 2012
    Assignee: ConocoPhillips Company
    Inventors: Partha S. Sarathi, Wayne Reid Dreher, Jr., Thomas J. Wheeler, Wendell P. Menard
  • Patent number: 8079417
    Abstract: A non-rigid carrier conveys a pump and/or the steam generator through a bore of the production tubing string to support enhanced oil recovery operations. An annular space separates the production tubing string and a wall of a wellbore intersecting a hydrocarbon-bearing subterranean formation. Using the non-rigid carrier, the steam generator is conveyed into the wellbore and operated to inject hot gases into the formation through the perforations in the casing. Afterwards, the steam generator is conveyed out of the cased wellbore and the pump is conveyed into the cased wellbore and operated to pump hydrocarbons to the surface. For cyclic injection operations, the pump may be retrieved to the surface and the steam generator may be returned into the well. The production tubing string, such as a production tubing, remains in the well while the pump and/or the steam generator are conveyed up and down the cased well. A base installed in the cased well receives either the pump or the steam generator.
    Type: Grant
    Filed: August 13, 2008
    Date of Patent: December 20, 2011
    Assignee: ConocoPhillips Company
    Inventors: Dennis C. Wegener, Riley B. Needham, David R. Zornes, Partha S. Sarathi
  • Publication number: 20110094739
    Abstract: A method for recovering heavy oil in a stratum with an injection well, a production well and a steam generator. The method begins by injecting steam from the steam generator into a horizontal portion of the injection well followed by soaking the stratum with the steam from the injection well for a predetermined period of time; and producing heavy oil from the stratum with the production well.
    Type: Application
    Filed: October 19, 2010
    Publication date: April 28, 2011
    Applicant: ConocoPhillips Company
    Inventors: Partha S. Sarathi, Riley B. Needham, Robert Scott Redman
  • Publication number: 20110067858
    Abstract: An underground reservoir is provided comprising an injection well and a production well. The production well has a horizontal section oriented generally perpendicularly to a generally linear and laterally extending, upright combustion front propagated from the injection well.
    Type: Application
    Filed: September 15, 2010
    Publication date: March 24, 2011
    Applicant: CONOCOPHILLIPS COMPANY
    Inventors: Wayne R. Dreher, Partha S. Sarathi
  • Publication number: 20110011582
    Abstract: Methods and apparatus relate to in situ combustion. Configurations of the injection and production wells facilitate the in situ combustion. Utilizing wet combustion for some embodiments promotes heat displacement for hydrocarbon recovery with procedures in which one or more of the production and injection wells are configured with lengths deviated from vertical. In some embodiments for either dry or wet combustion, at least the production wells define intake lengths deviated from vertical and that are disposed at staged levels within a formation. Each of the productions wells during the in situ combustion allow for recovery of hydrocarbons through gravity drainage. Vertical separation between the intake lengths of the production wells enables differentiated and efficient removal of combustion gasses and the hydrocarbons.
    Type: Application
    Filed: July 16, 2010
    Publication date: January 20, 2011
    Applicant: ConocoPhillips Company
    Inventors: Partha S. Sarathi, Wayne Reid Dreher, JR., Riley Bryan Needham, Abhishek Dutta
  • Publication number: 20100206563
    Abstract: Methods and systems relate to in situ combustion utilizing configurations of injection and production wells to facilitate the in situ combustion. The wells define vertically deviated lengths that have different orientations from one another. Further, heating processes such as resistive heating and cyclic steam stimulation may take place in one or both of the injection and production wells to precondition a reservoir prior to the in situ combustion.
    Type: Application
    Filed: February 17, 2010
    Publication date: August 19, 2010
    Applicant: CONOCOPHILLIPS COMPANY
    Inventors: Partha S. Sarathi, Wayne Reid Dreher, JR., Thomas J. Wheeler, Wendell P. Menard
  • Publication number: 20080302523
    Abstract: A non-rigid carrier conveys a pump and/or the steam generator through a bore of the production tubing string to support enhanced oil recovery operations. An annular space separates the production tubing string and a wall of a wellbore intersecting a hydrocarbon-bearing subterranean formation. Using the non-rigid carrier, the steam generator is conveyed into the wellbore and operated to inject hot gases into the formation through the perforations in the casing. Afterwards, the steam generator is conveyed out of the cased wellbore and the pump is conveyed into the cased wellbore and operated to pump hydrocarbons to the surface. For cyclic injection operations, the pump may be retrieved to the surface and the steam generator may be returned into the well. The production tubing string, such as a production tubing, remains in the well while the pump and/or the steam generator are conveyed up and down the cased well. A base installed in the cased well receives either the pump or the steam generator.
    Type: Application
    Filed: August 13, 2008
    Publication date: December 11, 2008
    Inventors: Dennis C. Wegener, Riley B. Needham, David R. Zornes, Partha S. Sarathi