Patents by Inventor Sepehr Arbabi

Sepehr Arbabi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20150107834
    Abstract: A method is provided for production of heavy oil from a reservoir containing heavy oil, the method including the steps of: providing a plurality of wells into the formation; injecting into the plurality of wells a mixture comprising steam and a solvent; ceasing injection of the mixture; producing a mixture of heavy oil, solvent and condensed steam from the plurality of wells after injection of steam has ceased: and after production of the mixture of heavy oil, solvent and condensate from at least one of the plurality of wells has declined to a predetermined rate, injecting into the at least one well a stream consisting essentially of steam while at least one other well continues to operate as a producing well.
    Type: Application
    Filed: October 20, 2014
    Publication date: April 23, 2015
    Inventors: Chonghui SHEN, Jorge Luis LOPEZ, Liping JIA, Sepehr ARBABI-TEHRAN
  • Patent number: 7289942
    Abstract: The invention relates to a method for predicting the performance of large-scale hydrocarbon-bearing reservoir floods. One embodiment of the invention includes a method for predicting performance of a patterned flooding process in a subterranean hydrocarbon-bearing formation, said formation being penetrated by a plurality of injector wells and producer wells, comprising the steps of: determining flow-based pairs of injector to producer wells [FIG.
    Type: Grant
    Filed: March 16, 2004
    Date of Patent: October 30, 2007
    Assignee: ExxonMobil Upstream Research Company
    Inventors: Shan H. Yang, John W. Miertschin, Ryan A. Kudva, Sepehr Arbabi
  • Publication number: 20060224369
    Abstract: The invention relates to a method for predicting the performance of large-scale hydrocarbon-bearing reservoir floods. One embodiment of the invention includes a method for predicting performance of a patterned flooding process in a subterranean hydrocarbon-bearing formation, said formation being penetrated by a plurality of injector wells and producer wells, comprising the steps of: determining flow-based pairs of injector to producer wells [FIG.
    Type: Application
    Filed: March 16, 2004
    Publication date: October 5, 2006
    Inventors: Shan Yang, John Miertschin, Ryan Kudva, Sepehr Arbabi