Patents by Inventor Shahid Azizul Haq

Shahid Azizul Haq has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10401808
    Abstract: Fluid data collected while drilling a wellbore in a drilling operation that includes a first well trajectory is received. A first productivity metric for a next section of the wellbore on a continued trajectory of the first well section trajectory is determined, based at least in part on the fluid data. A second well section trajectory for the next section of the wellbore different from the continued trajectory of the first well section trajectory is determined. A second productivity metric for the second well trajectory is determined. The drilling operation is adjusted if the first productivity index differs from the second productivity index by more than a threshold amount.
    Type: Grant
    Filed: December 31, 2015
    Date of Patent: September 3, 2019
    Assignee: Schlumberger Technology Corporation
    Inventors: Rita Esuru Okoroafor, Wentao Zhou, Shahid Azizul Haq
  • Patent number: 9719341
    Abstract: To control well drilling, information relating to a trajectory of a well is received, and fluid flow in the well is simulated according to the received information. Simulating the fluid production comprises simulating production flow assurance that seeks to reduce occurrence of mixtures of different types of fluids that reduce production of a target fluid. In response to results of the simulating, a further trajectory for further drilling of the well is identified.
    Type: Grant
    Filed: April 30, 2010
    Date of Patent: August 1, 2017
    Assignee: Schlumberger Technology Corporation
    Inventors: Lucian K. Johnston, Shahid Azizul Haq
  • Publication number: 20160215606
    Abstract: Fluid data collected while drilling a wellbore in a drilling operation that includes a first well trajectory is received. A first productivity metric for a next section of the wellbore on a continued trajectory of the first well section trajectory is determined, based at least in part on the fluid data. A second well section trajectory for the next section of the wellbore different from the continued trajectory of the first well section trajectory is determined. A second productivity metric for the second well trajectory is determined.
    Type: Application
    Filed: December 31, 2015
    Publication date: July 28, 2016
    Inventors: Rita Esuru Okoroafor, Wentao Zhou, Shahid Azizul Haq
  • Publication number: 20100282508
    Abstract: To control well drilling, information relating to a trajectory of a well is received, and fluid flow in the well is simulated according to the received information. Simulating the fluid production comprises simulating production flow assurance that seeks to reduce occurrence of mixtures of different types of fluids that reduce production of a target fluid. In response to results of the simulating, a further trajectory for further drilling of the well is identified.
    Type: Application
    Filed: April 30, 2010
    Publication date: November 11, 2010
    Applicant: Schlumberger Technology Center
    Inventors: Lucian K. Johnston, Shahid Azizul Haq