Patents by Inventor Tetsuji Namoto

Tetsuji Namoto has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9618197
    Abstract: The invention improves system efficiency with no waste of heat held by a stopped boiler. A boiler system includes a boiler group having a plurality of boilers and a controller for controlling a combustion state of the boiler group. The controller includes a heat release determiner for determining whether or not the plurality of boilers includes a boiler releasing heat, a boiler increase determiner for determining, when the heat releasing boiler starts combustion and the heat releasing boiler and the other combusting boilers are combusted at equal load factors, whether or not the load factor is higher than a predetermined load factor, and an output controller for combusting the heat releasing boiler when the load factor is determined to be higher than the predetermined load factor.
    Type: Grant
    Filed: February 28, 2013
    Date of Patent: April 11, 2017
    Assignee: Miura Co., Ltd.
    Inventors: Kazuya Yamada, Tetsuji Namoto, Hidetomo Saimi
  • Patent number: 9127835
    Abstract: A boiler steam amount measuring method for continuously measuring a temporal change in an amount of steam from a steam boiler, includes: first measuring a differential pressure between a pressure at a first detection position that is a predetermined position in a can body of the steam boiler or a steam outflow path, and a pressure at a second detection position in the steam outflow path separated from the first detection position toward a downstream side; first calculating a pressure loss coefficient based on the differential pressure measured by flowing a predetermined flow rate of steam or fluid instead of steam into the steam outflow path, and the predetermined flow rate; and second calculating continuously the amount of steam based on the differential pressure measured in the first measuring and the pressure loss coefficient calculated in the first calculating, and outputting the calculated amount of steam as a measurement value.
    Type: Grant
    Filed: August 23, 2012
    Date of Patent: September 8, 2015
    Assignee: MIURA CO., LTD.
    Inventors: Osamu Tanaka, Tetsuji Namoto, Noriaki Nagai
  • Publication number: 20150204537
    Abstract: The invention improves system efficiency with no waste of heat held by a stopped boiler. A boiler system includes a boiler group having a plurality of boilers and a controller for controlling a combustion state of the boiler group. The controller includes a heat release determiner for determining whether or not the plurality of boilers includes a boiler releasing heat, a boiler increase determiner for determining, when the heat releasing boiler starts combustion and the heat releasing boiler and the other combusting boilers are combusted at equal load factors, whether or not the load factor is higher than a predetermined load factor, and an output controller for combusting the heat releasing boiler when the load factor is determined to be higher than the predetermined load factor.
    Type: Application
    Filed: February 28, 2013
    Publication date: July 23, 2015
    Applicant: Miura Co., Ltd.
    Inventors: Kazuya Yamada, Tetsuji Namoto, Hidetomo Saimi
  • Patent number: 8573162
    Abstract: A combustion apparatus for boiler includes an air supply device that varies a supply amount of combustion air, a fuel supply device that varies a supply amount of fuel, and a control device that controls the air supply device and the fuel supply device, obtains the supply amounts in accordance with respective combustion stages, and realizes the multiple combustion stages. The the control device controls the air supply device and the fuel supply device so as to return to a predetermined combustion stage when a request for transition cancel is received during transition from the predetermined combustion stage to another combustion stage, and controls so as not to perform the transition to the other combustion stage until a predetermined time period has elapsed.
    Type: Grant
    Filed: August 6, 2009
    Date of Patent: November 5, 2013
    Assignee: Miura Co., Ltd.
    Inventors: Tsutomu Sasaki, Ryo Miyagawa, Tetsuji Namoto, Koji Miura
  • Publication number: 20130074608
    Abstract: A boiler steam amount measuring method for continuously measuring a temporal change in an amount of steam from a steam boiler, includes: first measuring a differential pressure between a pressure at a first detection position that is a predetermined position in a can body of the steam boiler or a steam outflow path, and a pressure at a second detection position in the steam outflow path separated from the first detection position toward a downstream side; first calculating a pressure loss coefficient based on the differential pressure measured by flowing a predetermined flow rate of steam or fluid instead of steam into the steam outflow path, and the predetermined flow rate; and second calculating continuously the amount of steam based on the differential pressure measured in the first measuring and the pressure loss coefficient calculated in the first calculating, and outputting the calculated amount of steam as a measurement value.
    Type: Application
    Filed: August 23, 2012
    Publication date: March 28, 2013
    Applicant: MIURA CO., LTD.
    Inventors: Osamu TANAKA, Tetsuji NAMOTO, Noriaki NAGAI
  • Publication number: 20120042839
    Abstract: There is provided a boiler capable of preventing occurrence of a trouble accompanying transition cancel while enabling the transition cancel between combustion stages, in the boiler that controls a combustion amount in multiple combustion stages.
    Type: Application
    Filed: August 6, 2009
    Publication date: February 23, 2012
    Applicant: MIURA CO., LTD.
    Inventors: Tsutomu Sasaki, Ryo Miyagawa, Tetsuji Namoto, Koji Miura