Patents by Inventor Tim D. Ferguson

Tim D. Ferguson has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9556581
    Abstract: Pile cap connectors are attached to pipe piles and are secured to an existing building so that the existing building is supported by an array of the deeply driven pipe piles which serve as the foundation for the building. Alternative pile cap connectors are length adjustable to span the distance between the top of the drill driven pipe piles and the underside of the lifted existing building. The pile cap connectors are an integral part of a method using low-overhead equipment to construct a deep piling foundation for an existing building where the method involves lifting the existing building to a predetermined elevation above grade and positioning cribbing stacks to support the existing building at the predetermined elevation above grade. The cribbing stacks are spaced from each other enabling low-overhead equipment to maneuver underneath the elevated building to drill drive the pipe piles at designated locations to provide optimal support for the building.
    Type: Grant
    Filed: May 28, 2014
    Date of Patent: January 31, 2017
    Inventors: Glen G. Hale, Tim D. Ferguson
  • Publication number: 20140356076
    Abstract: Pile cap connectors are attached to pipe piles and are secured to an existing building so that the existing building is supported by an array of the deeply driven pipe piles which serve as the foundation for the building. Alternative pile cap connectors are length adjustable to span the distance between the top of the drill driven pipe piles and the underside of the lifted existing building. The pile cap connectors are an integral part of a method using low-overhead equipment to construct a deep piling foundation for an existing building where the method involves lifting the existing building to a predetermined elevation above grade and positioning cribbing stacks to support the existing building at the predetermined elevation above grade. The cribbing stacks are spaced from each other enabling low-overhead equipment to maneuver underneath the elevated building to drill drive the pipe piles at designated locations to provide optimal support for the building.
    Type: Application
    Filed: May 28, 2014
    Publication date: December 4, 2014
    Inventors: Glen G. Hale, Tim D. Ferguson