Patents by Inventor Wenqu Zeng

Wenqu Zeng has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11875285
    Abstract: Provided is a method for scheduling resource-constrained project by IWO. The method establishes a resource-constrained project scheduling model first, converts the project scheduling issue in actual engineering into the combination and optimization in a mathematical model, then the optimization aims at minimizing the project total duration, while considering the immediate predecessor/successor constraints of the project activities and a variety of renewable resource constraints, to construct project scheduling model, lastly IWO is used to seek the solution for large-scale project scheduling. In the solution process, a right-shift decoding strategy was designed to rectify the ineligible solutions that occurred during the generation of weed seeds, ensure that all solutions are in compliance with the immediate predecessor/successor constraints of the project activities, and improve the efficiency of algorithm. Solution efficiency.
    Type: Grant
    Filed: June 23, 2020
    Date of Patent: January 16, 2024
    Assignee: Guangzhou Metro Design & Research Inst. Co. Ltd.
    Inventors: Quan Yuan, Wenqu Zeng, Haiou Shi, Xingzhong Nong, Jian Wang, Yunlin Zhang
  • Publication number: 20230153708
    Abstract: Provided is a method for scheduling resource-constrained project by IWO. The method establishes a resource-constrained project scheduling model first, converts the project scheduling issue in actual engineering into the combination and optimization in a mathematical model, then the optimization aims at minimizing the project total duration, while considering the immediate predecessor/successor constraints of the project activities and a variety of renewable resource constraints, to construct project scheduling model, lastly IWO is used to seek the solution for large-scale project scheduling. In the solution process, a right-shift decoding strategy was designed to rectify the ineligible solutions that occurred during the generation of weed seeds, ensure that all solutions are in compliance with the immediate predecessor/successor constraints of the project activities, and improve the efficiency of algorithm. Solution efficiency.
    Type: Application
    Filed: June 23, 2020
    Publication date: May 18, 2023
    Inventors: Quan Yuan, Wenqu Zeng, Haiou Shi, Xingzhong Nong, Jian Wang, Yunlin Zhang