Patents by Inventor Yuta IWATA

Yuta IWATA has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11391184
    Abstract: In one embodiment, a plant control apparatus includes a first stop controller configured to, when stopping a plant, stop a steam turbine to start to drop rotating speed of a second shaft of the steam turbine from rated speed, and start to drop rotating speed of a first shaft of a gas turbine from the rated speed while continuing combustion of a combustor after the stop of the steam turbine. The apparatus further includes a second stop controller configured to shut off fuel of the combustor to stop the gas turbine when the rotating speed of the first shaft drops to first speed. The second stop controller stops the gas turbine such that the rotating speed of the first shaft catches up with the rotating speed of the second shaft at second speed that is equal to or lower than the first speed and a clutch is engaged.
    Type: Grant
    Filed: August 25, 2020
    Date of Patent: July 19, 2022
    Assignees: TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION, TOSHIBA PLANT SYSTEMS & SERVICES CORPORATION
    Inventors: Mohammed Ameen Abbas Alzuraiqi, Masayuki Tobo, Yuta Iwata, Mizu Kajihara, Shinobu Chiba
  • Patent number: 11274573
    Abstract: In one embodiment, a plant control apparatus controls a power plant. The plant includes a gas turbine, a generator driven by the gas turbine, an exhaust heat recovering boiler to generate first steam by using heat of exhaust gas from the gas turbine, a first steam turbine driven by the first steam, a reheater provided in the boiler and configured to heat exhaust steam from the first steam turbine by the exhaust gas to generate reheat steam, and a second steam turbine driven by the reheat steam. The apparatus includes a first warming-up module to supply second steam from equipment different from the boiler to the first steam turbine to warm up this turbine, before this turbine is started. The apparatus further includes a second warming-up module to supply the second steam to the reheater to warm up the reheater, before the first steam turbine is started.
    Type: Grant
    Filed: March 14, 2019
    Date of Patent: March 15, 2022
    Assignees: KABUSHIKI KAISHA TOSHIBA, TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
    Inventors: Trung Dam Ngo, Masayuki Tobo, Yuta Iwata, Shoji Kaneko, Takahiro Mori
  • Publication number: 20210095579
    Abstract: In one embodiment, a plant control apparatus includes a first stop controller configured to, when stopping a plant, stop a steam turbine to start to drop rotating speed of a second shaft of the steam turbine from rated speed, and start to drop rotating speed of a first shaft of a gas turbine from the rated speed while continuing combustion of a combustor after the stop of the steam turbine. The apparatus further includes a second stop controller configured to shut off fuel of the combustor to stop the gas turbine when the rotating speed of the first shaft drops to first speed. The second stop controller stops the gas turbine such that the rotating speed of the first shaft catches up with the rotating speed of the second shaft at second speed that is equal to or lower than the first speed and a clutch is engaged.
    Type: Application
    Filed: August 25, 2020
    Publication date: April 1, 2021
    Applicants: TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION, TOSHIBA PLANT SYSTEMS & SERVICES CORPORATION
    Inventors: Mohammed Ameen Abbas ALZURAIQI, Masayuki TOBO, Yuta IWATA, Mizu KAJIHARA, Shinobu CHIBA
  • Patent number: 10920623
    Abstract: In one embodiment, a plant control apparatus controls a power plant, which includes a gas turbine, a generator driven by the gas turbine, an exhaust heat recovering boiler to generate first steam using heat of exhaust gas from the gas turbine, a steam turbine driven by the first steam, and a clutch to connect a first shaft connected to the gas turbine and generator with a second shaft connected to the steam turbine. The apparatus includes a starting module to start the gas turbine and generator while holding the steam turbine in a stop state, when the clutch is in a released state. The apparatus further includes a warming module to warm the steam turbine by supplying second steam from equipment different from the boiler to the steam turbine in parallel with the starting of the gas turbine and generator, when the clutch is in a released state.
    Type: Grant
    Filed: April 25, 2019
    Date of Patent: February 16, 2021
    Assignees: KABUSHIKI KAISHA TOSHIBA, TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
    Inventors: Kanako Nagayama, Masayuki Tobo, Yuta Iwata, Shoji Kaneko, Takahiro Mori
  • Publication number: 20200040770
    Abstract: In one embodiment, a plant control apparatus controls a power plant, which includes a gas turbine, a generator driven by the gas turbine, an exhaust heat recovering boiler to generate first steam using heat of exhaust gas from the gas turbine, a steam turbine driven by the first steam, and a clutch to connect a first shaft connected to the gas turbine and generator with a second shaft connected to the steam turbine. The apparatus includes a starting module to start the gas turbine and generator while holding the steam turbine in a stop state, when the clutch is in a released state. The apparatus further includes a warming module to warm the steam turbine by supplying second steam from equipment different from the boiler to the steam turbine in parallel with the starting of the gas turbine and generator, when the clutch is in a released state.
    Type: Application
    Filed: April 25, 2019
    Publication date: February 6, 2020
    Applicants: KABUSHIKI KAISHA TOSHIBA, TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
    Inventors: Kanako Nagayama, Masayuki Tobo, Yuta Iwata, Shoji Kaneko, Takahiro Mori
  • Publication number: 20190284963
    Abstract: In one embodiment, a plant control apparatus controls a power plant. The plant includes a gas turbine, a generator driven by the gas turbine, an exhaust heat recovering boiler to generate first steam by using heat of exhaust gas from the gas turbine, a first steam turbine driven by the first steam, a reheater provided in the boiler and configured to heat exhaust steam from the first steam turbine by the exhaust gas to generate reheat steam, and a second steam turbine driven by the reheat steam. The apparatus includes a first warming-up module to supply second steam from equipment different from the boiler to the first steam turbine to warm up this turbine, before this turbine is started. The apparatus further includes a second warming-up module to supply the second steam to the reheater to warm up the reheater, before the first steam turbine is started.
    Type: Application
    Filed: March 14, 2019
    Publication date: September 19, 2019
    Applicants: KABUSHIKI KAISHA TOSHIBA, TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
    Inventors: Trung Dam NGO, Masayuki TOBO, Yuta IWATA, Shoji KANEKO, Takahiro MORI