Abstract: The present invention provides methods and apparatus for simulating well bore conditions before and after cementing therein. The methods of the invention are basically comprised of the steps of circulating a drilling fluid through a closed test cell containing a permeable rock core while maintaining a selected pressure differential across the rock core to form a layer of filter cake thereon, circulating a filter cake removal fluid through the test cell to simulate the clean-up of the well bore and then determining the condition of the rock core with respect to the effectiveness of the filter cake removal fluid thereon.
Type:
Grant
Filed:
February 2, 1999
Date of Patent:
May 2, 2000
Assignee:
Halliburton Energy Services, Inc.
Inventors:
David D. Onan, Dennis W. Gray, Russell M. Fitzgerald, Johnny W. Johnson