Abstract: A method for installation capacities of a hybrid energy generation system is disclosed. The hybrid energy generation system may include a plurality of power systems. According to the environment factors and practical requirements of the installation site, the mechanism of the present invention may find the golden ratio of the installation capacities among the different power systems. Furthermore, the present invention may obtain the combination of installation capacities associated with the minimum recovery period, thereby further decreasing the installation cost and the efficiency of the hybrid energy generation system.
Type:
Grant
Filed:
August 26, 2010
Date of Patent:
June 4, 2013
Assignees:
Yuan Ze University, Taiwan Green Productivity Foundation, Advanced Control Systems, Inc., China Technical Consultants, Inc. Foundation
Abstract: A method for installation capacities of a hybrid energy generation system is disclosed. The hybrid energy generation system may include a plurality of power systems. According to the environment factors and practical requirements of the installation site, the mechanism of the present invention may find the golden ratio of the installation capacities among the different power systems. Furthermore, the present invention may obtain the combination of installation capacities associated with the minimum recovery period, thereby further decreasing the installation cost and the efficiency of the hybrid energy generation system.
Type:
Application
Filed:
August 26, 2010
Publication date:
December 1, 2011
Applicants:
YUAN ZE UNIVERSITY, CHINA TECHNICAL CONSULTANTS, INC. FOUNDATION, ADVANCED CONTROL & SYSTEMS, INC., TAIWAN GREEN PRODUCTIVITY FOUNDATION