Patents Assigned to Aker Engineering A/S
-
Patent number: 5256844Abstract: The present invention relates to a transportation pipe or conduit (10, 20, 30) which preferably is adapted to be installed on the seabed between a permanent or floating off-shore platform (3) and an on-shore terminal (4). The transportation conduit comprises an inner tube or pipe (21, 31) which primarily is constructed for the transmission of gas and/or oil or similar, a plurality of elements (23, 33) provided preferably as a layer outside the pipe (21, 31) and being adapted for transmission of preferably electric power. The elements (23, 33) which preferably might be made of copper or another material of appropriate electric conductivity, is insulated against the outer environment, for example by means of an appropriate thermal insulation material (24, 34). The inner tube (21, 31) might be manufactured from steel or a flexible material of considerable strength, and be surrounded by a corrosion preventing layer (22, 32).Type: GrantFiled: January 2, 1991Date of Patent: October 26, 1993Assignees: Aker Engineering A/S, Standard Telefon og Kabelfabrik A/SInventors: Magne Grosvik, Kjell Ronningen
-
Patent number: 5009680Abstract: A method and a system are disclosed for the transportation and separation of gas from liquid and solid media in one or several stages in a manner so that the pressure in the gaseous phase from an early separator stage (1) or from another gas deposit is utilized for the transportation of the fluids produced in subsequent separator stages (2, 3, 4). Gas which is separated at high pressure in an early separator stage (1) or gas from another gas deposit is fed into a separator (3) which has effected separation at a lower pressure and the high pressure gas forces out the separated fluid which is present in the separator receiving the high pressure gas. The separator stage at which high pressure gas is received from a preceding stage or another gas source, is made up of several identical separators (2, 3, 4) which alternate in carrying out the separation phase (2), output (3) and decompression (4) so that there is at all times one separator carrying out functions within one phase.Type: GrantFiled: June 11, 1990Date of Patent: April 23, 1991Assignee: Aker Engineering a.s.Inventor: Kristian Brekke
-
Patent number: 4934872Abstract: The invention relates to an arrangement in an offshore platform (1a), comprising a deck structure (1) which is supported above the water surface (5) by means of a column structure (14, 2) which in turn rests on and is connected to a foundation (3) on the sea bottom (4). In order to provide a compliant platform structure which is not dependent upon guylines preventing free traffic around and at the platform (1a), the column structure (14, 2) comprises at least one hollow column (2), in the cavity (2a) of which there is provided at least one tension means (7) which at its first end is connected to the foundation (3), and which at the second end is connected to the column (2). The foundation (3) can be preinstalled at the sea bottom (4), or might constitute a part of the offshore platform (1a) such that the latter mounted on the sea bed (4) as a gathered unit.Type: GrantFiled: September 28, 1987Date of Patent: June 19, 1990Assignee: Aker Engineering A/SInventor: Erik Klausen
-
Patent number: 4848966Abstract: A production platform for offshore exploitation of hydrocarbons comprises a truss tower (1) which rests on the sea floor (2) and supports a deck structure (3) provided with a drilling module (5). In order to obtain optimum mutual distance between production pipes (10) at the deck level, the skid beams (6) of the drilling module are arranged parallel to a diagonal (9) in the cross-section of the truss tower. Weight savings in the truss tower (1) may be obtained by arranging the deck structure (3) with its sides parallel to the diagonals (9) of the truss tower (1).Type: GrantFiled: April 12, 1988Date of Patent: July 18, 1989Assignee: Aker Engineering A/SInventor: Marc Lefranc
-
Patent number: 4793739Abstract: A compliant concrete structure which is supported by using a compliant pile system consisting of piles and pile sleeves so that the platform may yield to large oscillations when the structure is installed in a body of water. The invention comprises attaching the pile sleeve guides (6) and the pile sleeves (3) to a rotation symmetrical concrete shell which forms the basic structure. The pile sleeves are rigidly connected to the lower end portion (2) of the structure.Type: GrantFiled: June 19, 1987Date of Patent: December 27, 1988Assignee: Aker Engineering A/SInventors: Alf E. Hasle, Per C. Sandnaes
-
Patent number: 4738566Abstract: A semi-submersible oil platform comprising two pontoons (1), columns (2) extending up from the pontoons and supporting a deck structure (3), and stays (4) extending transversally of the pontoons between the columns (2), is provided with a plough-like protecting device (8) for diverting drifting objects, e.g. ice bodies which are not sufficiently large to be detected by radar, but which, nevertheless, could cause considerable damage to the horizontal stays (4) of the platform and the drill string.Type: GrantFiled: March 18, 1986Date of Patent: April 19, 1988Assignee: Aker Engineering A/SInventor: Arve Marthinsen