Patents Assigned to BETAZI, LLC
  • Publication number: 20140310071
    Abstract: Methods and apparatus for modeling well production. Such methods comprise modeling a production of a well (perhaps an open universe, generative model). Methods also comprise determining probability distributions for physical parameters associated with the well by training the model with historic well production data (perhaps using sparse sampling). Such methods also comprise determining a posterior distribution for the model by sampling probability distributions for the parameters. Some methods further comprise determining a posterior distribution for the well's production using the model's posterior distribution. Non-Gaussian (Laplacian) noise can be added to the model. Methods can comprise financially modeling the well. Some methods comprise using MCMC sampling to converge the parameter posterior distribution for the well's production. An EUR for the well can be determined along with an uncertainty associated with the posterior distribution for the production.
    Type: Application
    Filed: March 13, 2014
    Publication date: October 16, 2014
    Applicant: BETAZI, LLC
    Inventors: Janette Conradson, Nimar S. Arora, Heidi A. Kuzma, Christian Pierce, Wesly Ketcham
  • Publication number: 20140297235
    Abstract: Methods and apparatus for modeling well production. Such methods comprise modeling a production of a well (perhaps an open universe, generative model). Methods also comprise determining probability distributions for physical parameters associated with the well by training the model with historic well production data (perhaps using sparse sampling). Such methods also comprise determining a posterior distribution for the model by sampling probability distributions for the parameters. Some methods further comprise determining a posterior distribution for the well's production using the model's posterior distribution. Non-Gaussian (Laplacian) noise can be added to the model. Methods can comprise financially modeling the well. Some methods comprise using MCMC sampling to converge the parameter posterior distribution for the well's production. An EUR for the well can be determined as well as an uncertainty associated with the posterior distribution for the production.
    Type: Application
    Filed: January 31, 2014
    Publication date: October 2, 2014
    Applicant: BETAZI, LLC
    Inventors: Nimar S. Arora, Heidi A. Kuzma, Janette Conradson