Patents Assigned to China Electric Power Research Institute
  • Publication number: 20240370604
    Abstract: A method and apparatus for optimally configuring a capacity of a high-proportion new energy system, a device, and a medium, which belong to the field of new energy system optimization and are used for solving the problems of insufficient flexibility of the high-proportion new energy system during the heating period and difficult consumption of renewable energy. The method includes: constructing a high-proportion new energy system structure; establishing a concentrating solar power (CSP) unit model and a combined heat and power (CHP) unit model based on the proposed structure; establishing a high-proportion new energy system collaborative optimization model based on the proposed unit models; acquiring relevant data of various units and renewable resource data; and obtaining a capacity configuration and operation optimization scheme of various units in the high-proportion new energy system according to the established model, thereby improving the renewable energy consumption of the system.
    Type: Application
    Filed: February 8, 2024
    Publication date: November 7, 2024
    Applicants: SHANDONG UNIVERSITY, NORTH CHINA ELECTRIC POWER UNIVERSITY, SHANGHAI JIAO TONG UNIVERSITY, CHINA ELECTRIC POWER RESEARCH INSTITUTE
    Inventors: Tianguang LV, Jing Li, Fei Wang, Zhaohao Ding, Xing He, Wanxing Sheng, Rui Li, Haoyuan Cheng, Qian Ai, Ming Yang, Xueshan Han, Guibin Zou, Chengfu Wang
  • Patent number: 12117473
    Abstract: A method and system for measuring broadband impedance of a renewable energy power generation device. A voltage disturbance is injected into the renewable energy power generation device by using a disturbance injection device, and three-phase voltage and three-phase current of each of preset measurement points are acquired. Relevant variables before the renewable energy power generation device is decoupled from a measurement device and impedance of a power grid, are calculated according to the three-phase voltage and the three-phase current of each of the preset measurement points. Impedance of the renewable energy power generation device after being decoupled from the measurement device and the impedance of the power grid, is calculated.
    Type: Grant
    Filed: June 12, 2024
    Date of Patent: October 15, 2024
    Assignee: CHINA ELECTRIC POWER RESEARCH INSTITUTE
    Inventors: Weisheng Wang, Guanghui Li, Guoqing He, Yuntao Xiao, Yu Lei, Zixuan Guo, Shuanglei Feng, Caiyun Gao, Junhua Ma, Keke Liu, Liping Gao, Ni Zhen, Yuye Li, Yuqi Duan, Fangfang Yu
  • Publication number: 20240235184
    Abstract: A method for identifying a dominant overvoltage of a high-proportion new energy power system includes the following operations. A voltage amplitude of a new energy terminal and a voltage amplitude of an alternating-current (AC) bus at any moment after faults of the new energy terminal and the AC bus are cleared, are determined. An overvoltage limit ratio is determined according to a ratio of the voltage amplitude of the new energy terminal to the voltage amplitude of the AC bus. A critical overvoltage limit ratio is determined. A maximum new energy terminal voltage value and a maximum AC bus voltage value bearable for the new energy terminal and the AC bus are determined respectively. Identification of a dominant voltage safety constraint is performed and an identification result is determined.
    Type: Application
    Filed: December 6, 2022
    Publication date: July 11, 2024
    Applicant: China Electric Power Research Institute
    Inventors: Shiyun XU, Huadong SUN, Yiming WANG, Bing ZHAO, Jingtian BI, Shuyan WANG
  • Patent number: 11973340
    Abstract: A line current iM(k0) of an M side of a first direct-current transmission line is collected at a moment k0. A line current iM(k0?ts) thereof is collected at k0?ts. At a moment k0, a differential value diM(k0) of a current of the side of the first direct-current transmission line is calculated according to the line current iM(k0) and the line current iM(k0?ts). It is determined whether the differential value diM(k0) of the current meets a protection enabling criteria. If so, direct-current protection for the M side of the first direct-current transmission line is enabled. A line current iM(j) of the M side of the first direct-current transmission line is collected at a moment j. A line current iM(j?ts) thereof is collected at a moment j?ts. A differential value diM(j) of the current of the M side of the first direct-current transmission line at the moment j is calculated according to the line current iM(j) and the line current iM(j?ts).
    Type: Grant
    Filed: June 18, 2020
    Date of Patent: April 30, 2024
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Zexin Zhou, Huanzhang Liu, Pengfei Lv, Hong Cao, Xingguo Wang, Siye Ruan, Dingxiang Du, Yong Li, Guosheng Yang, Mingliang Jin
  • Patent number: 11936186
    Abstract: Provided are a method and apparatus for evaluating a degree of frequency regulation urgency of a generator set, a power system and a storage medium.
    Type: Grant
    Filed: January 17, 2020
    Date of Patent: March 19, 2024
    Assignees: STATE GRID FUJIAN ELECTRIC POWER COMPANY LIMITED, STATE GRID FUJIAN ELECTRIC POWER RESEARCH INSTITUTE, CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED
    Inventors: Zhenhua Xu, Risheng Fang, Ting Huang, Dahai Yu, Kewen Li, Xiangyu Tao, Daoshan Huang, Yi Su, Zhi Chen, Danyue Wu, Huiyu Zhang
  • Patent number: 11841387
    Abstract: A system for load identification in collaboration with a cloud end includes: a smart Internet of Things electricity meter module, used for matching extracted feature quantity data with a first load feature library of the smart Internet of Things electricity meter module, and determining load feature data corresponding to unmatched feature quantity data in the feature quantity data as target load feature data; a use information front-end/acquisition module, used for calling the target load feature data and transmitting the target load feature data to a main station load identification module; and a main station load identification module, used for receiving the target load feature data, performing data direction processing on the target load feature data, determining an optimal matching strategy matching the feature data to be identified, and identifying an optimal matching solution corresponding to the feature quantity data to be identified in a second load feature library.
    Type: Grant
    Filed: January 29, 2022
    Date of Patent: December 12, 2023
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Xingqi Liu, Enguo Zhu, Heping Zou, Fantao Lin, Min Lei, Yinghui Xu, Hao Chen, Zhongxing Wu, Yupeng Zhang, Zixu Zhu, Yue Han
  • Publication number: 20230387687
    Abstract: A method for checking a medium-term and long-term maintenance plan of a power grid. A predicted load value and one or more historical load values of a power grid are acquired and clustered through a clustering algorithm, and a historical moment at which a historical load value is in a same cluster as the predicted load value and has a largest load value is selected as a target historical moment. A power grid operation mode model at the target historical moment is acquired, and the power grid operation mode model is updated according to the maintenance plan and open loop point information by using a full wiring approach to obtain a future-state power grid operation mode model. Ground state power flow data of the power grid are calculated based on the operation mode model, and safety check is carried out according to a preset ground state power flow limit.
    Type: Application
    Filed: August 25, 2021
    Publication date: November 30, 2023
    Applicants: China Electric Power Research Institute, State Grid Shanxi Electric Power Research Institute
    Inventors: Yuxuan LI, Chuancheng ZHANG, Sai DAI, Hui CUI, Qiang DING, Lixin LI, Qiang LI, Yi PAN, Zhi CAI, Yueshuang BAO, Xinyuan LIU, Huiping ZHENG, Wei HAN, Wei WANG, Lei WANG, Jinghua YAN, Bin HAN, Xiaojing HU, Bo LI, Guodong HUANG, Dan XU, Jiali ZHANG, Weigang LI
  • Patent number: 11749985
    Abstract: A method and device for timing in time-varying distance protection based on multiple lines of a tower. The method includes: collecting an instantaneous current value at a time-varying distance protection installation location in the multiple lines of the tower, and acquiring preset parameters; calculating, according to the preset parameters and a multi-line ranging model, a multi-line ranging result; calculating, according to the preset parameters, the multi-line ranging result, and an adaptive calculation model, time of a section-II distance protection action and final time of a section-III distance protection action; and determining, according to the instantaneous current value, the preset parameters, and a cross-line failure auxiliary criterion model, final time of the section-II distance protection action.
    Type: Grant
    Filed: October 31, 2019
    Date of Patent: September 5, 2023
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Zexin Zhou, Tianhua Li, Hong Cao, Yarong Guo, Xingguo Wang, Dingxiang Du, Delin Wang, Pengfei Lv, Zhi Zhang
  • Patent number: 11742652
    Abstract: A method and device for starting direct-current (DC) transmission line protection, and a storage medium. The method includes: determining whether a sudden change of a DC line current at a present moment is greater than a sum of a memory start threshold and a maximum value in sudden changes of the DC line current within a time period preceding the present moment that is multiplied by a preset proportional coefficient, the time period being a time period between a moment preceding the present moment by a first duration and a moment preceding the present moment by a second duration; and starting DC transmission line protection in response to determining that the sudden change of the DC line current at the present moment is greater than the sum.
    Type: Grant
    Filed: August 13, 2019
    Date of Patent: August 29, 2023
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Hong Cao, Zexin Zhou, Huanzhang Liu, Dingxiang Du, Xingguo Wang
  • Publication number: 20230253793
    Abstract: Provided an intermittent characteristic-based demand-side resource coordination control method and system. The method includes: receiving a control request, where the control request is used for requesting control of demand-side resources having an intermittent characteristic; determining a target total control quantity of demand-side resources; determining a coordination strategy of multiple demand-side resources and an action quantity of each of the multiple demand-side resources; and performing coordinated control on the multiple demand-side resources based on the target total control quantity of demand-side resources, the coordination strategy, and the action quantity of each of the multiple demand-side resources.
    Type: Application
    Filed: October 30, 2020
    Publication date: August 10, 2023
    Applicants: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED, STATE GRID CORPORATION OF CHINA
    Inventors: Yaping Li, Shengchun Yang, Jianguo Yao, Jian Geng, Feng Li, Wenbo Mao, Yong Wang, Jun Liu, Kedong Zhu, Jiahao Yan, Jiantao Liu, Xiaorui Guo, Jing Zhou, Liwen Wang, Peng Xu, Lingling Pan
  • Publication number: 20230070173
    Abstract: A system for load identification in collaboration with a cloud end includes: a smart Internet of Things electricity meter module, used for matching extracted feature quantity data with a first load feature library of the smart Internet of Things electricity meter module, and determining load feature data corresponding to unmatched feature quantity data in the feature quantity data as target load feature data; a use information front-end/acquisition module, used for calling the target load feature data and transmitting the target load feature data to a main station load identification module; and a main station load identification module, used for receiving the target load feature data, performing data direction processing on the target load feature data, determining an optimal matching strategy matching the feature data to be identified, and identifying an optimal matching solution corresponding to the feature quantity data to be identified in a second load feature library.
    Type: Application
    Filed: January 29, 2022
    Publication date: March 9, 2023
    Applicants: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Xingqi LIU, Enguo ZHU, Heping ZOU, Fantao LIN, Min LEI, Yinghui XU, Hao CHEN, Zhongxing WU, Yupeng ZHANG, Zixu ZHU, Yue HAN
  • Publication number: 20220285931
    Abstract: Disclosed are a direct-current transmission line protection method and system based on pure current characteristics.
    Type: Application
    Filed: June 18, 2020
    Publication date: September 8, 2022
    Applicants: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Zexin ZHOU, Huanzhang LIU, Pengfei LV, Hong CAO, Xingguo WANG, Siye RUAN, Dingxiang DU, Yong LI, Guosheng YANG, Mingliang JIN
  • Publication number: 20220245298
    Abstract: The disclosure discloses a dynamic stability analysis method and device for a linear time-periodic (LTP) system. The method includes the following steps. Calculate the Q matrix corresponding to the LTP system, and use the eigenvalue of Q matrix whose real part is positive as an instability eigenvalue. Each instability eigenvalue is subjected to the following steps. (S1) the state space model is transformed into the infinite-order harmonic state space (HSS) model, and the truncation order m of HSS model is initialized to 1. (S2) after m-th order truncation of the HSS model, its eigenvalue thereof is calculated. If the real part of the eigenvalue of HSS model is not the same as the real part of the instability eigenvalue, m is updated, and step (S2) is performed again; otherwise, modal participation factor analysis is performed to obtain the state variables that dominate the system instability.
    Type: Application
    Filed: October 25, 2021
    Publication date: August 4, 2022
    Applicants: HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY, China Electric Power Research Institute, State Grid Anhui Electric Power Research Institute
    Inventors: Jiabing Hu, Jianhang Zhu, Shicong Ma, Yingbiao Li, Tiezhu Wang, Jianbo Guo, Zhen Wang
  • Publication number: 20220239093
    Abstract: A method and device for timing in time-varying distance protection based on multiple lines of a tower. The method includes: collecting an instantaneous current value at a time-varying distance protection installation location in the multiple lines of the tower, and acquiring preset parameters; calculating, according to the preset parameters and a multi-line ranging model, a multi-line ranging result; calculating, according to the preset parameters, the multi-line ranging result, and an adaptive calculation model, time of a section-II distance protection action and final time of a section-III distance protection action; and determining, according to the instantaneous current value, the preset parameters, and a cross-line failure auxiliary criterion model, final time of the section-II distance protection action.
    Type: Application
    Filed: October 31, 2019
    Publication date: July 28, 2022
    Applicants: CHINA ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA
    Inventors: Zexin ZHOU, Tianhua LI, Hong CAO, Yarong GUO, Xingguo WANG, Dingxiang DU, Delin WANG, Pengfei LV, Zhi ZHANG
  • Patent number: 11326579
    Abstract: An adaptive dynamic planning control method and system for a large-scale energy storage station. The method comprises: setting a structure and control target parameters of an adaptive dynamic planning control system; initializing the parameters and importing an initial state of a controlled object; calculating an original wind electricity power fluctuation rate at a current moment t and smoothing the original wind electricity power according to a change rate control strategy; calculating a smoothed wind storage power fluctuation rate, a power of an energy storage system, and a state of charge (SOC) of the energy storage system; initializing and training an evaluation module and an execution module; calculating and saving a control strategy, a smoothed wind storage power fluctuation rate, an energy storage power and a (SOC) at each moment; and outputting the control strategy at each moment, the smoothed wind storage power fluctuation rate, the energy storage power and the (SOC).
    Type: Grant
    Filed: April 28, 2017
    Date of Patent: May 10, 2022
    Assignees: China Electric Power Research Institute Company Limited, State Grid Corporation of China
    Inventors: Xiangjun Li, Yuting He, Jingqiong Zhang, Dong Hui, Xuecui Jia
  • Patent number: 11289944
    Abstract: A distribution network risk identification system and method and a computer storage medium include: multi-source information data for risk identification is acquired; the multi-source information data is analyzed and processed to obtain a risk characteristic; a risk identification index is calculated on the basis of the risk characteristic, and a state of a power grid is determined according to the risk identification index; a temporal and spatial variation rule and variation trend of the risk characteristic are analyzed; a location and cause of occurrence of a risk are determined according to the temporal and spatial variation rule and variation trend of the risk characteristic; a severity of the risk is analyzed by adopting an analogue simulation manner; and the severity of the risk is assessed, and risk early warning information is issued on the basis of an assessment result.
    Type: Grant
    Filed: November 3, 2017
    Date of Patent: March 29, 2022
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED, STATE GRID CORPORATION OF CHINA
    Inventors: Wanxing Sheng, Xiaohui Song, Yu Zhang, Jianfang Li, Fei Gao, Yajie Li, Shanshan Zhao
  • Patent number: 11190010
    Abstract: Provided are a method and apparatus for calculating fault resistance and a current-limiting current of a superconducting fault current limiter.
    Type: Grant
    Filed: August 27, 2019
    Date of Patent: November 30, 2021
    Assignees: Guangdong Power Grid Co. Ltd., China Electric Power Research Institute of Guangdong Power Grid Co., Ltd.
    Inventors: Lianhong Zhong, Xinhui Duan, Meng Song, Chao Sheng, Bing Zhao, Li Li, Yunsong Luo, Yajun Xia, Wenfeng Cheng, Zhengjun Shi, Xiaoqing Xiao, Youxin Lin
  • Patent number: 11176028
    Abstract: A standard conformance testing system and method for a CIM/E model of a power system and a storage medium include: converting the standards “Power Grid Common Model Description Specification (GB/T 30149)” and “Power Grid Operating Model Data Exchange Specification (DL/T 1380)” into practically operable testing rules, and performing automatic generation and verification of a CIM/E standard model and defect model. The testing system and method can improve the comprehensiveness and standardization of a CIM/E model standard compliance test, improving testing efficiency, promoting the level of standardization according to the CIM/E model in a power system software development process, and real time data exchange and interoperation between respective application systems, effectively supporting the safe and stable operation of a power grid.
    Type: Grant
    Filed: July 4, 2016
    Date of Patent: November 16, 2021
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED, STATE GRID CORPORATION OF CHINA
    Inventors: Linpeng Zhang, Yujia Li, Qingbo Yang, Lixin Li, Fangchun Di, Yunhao Huang, Dapeng Li, Lei Tao, Yangchun Hao, Zhenyu Chen
  • Publication number: 20210257837
    Abstract: Provided are a method and apparatus for evaluating a degree of frequency regulation urgency of a generator set, a power system and a storage medium.
    Type: Application
    Filed: January 17, 2020
    Publication date: August 19, 2021
    Applicants: STATE GRID FUJIAN ELECTRIC POWER COMPANY LIMITED, STATE GRID FUJIAN ELECTRIC POWER RESEARCH INSTITUTE, CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED
    Inventors: Zhenhua XU, Risheng FANG, Ting HUANG, Dahai YU, Kewen LI, Xiangyu TAO, Daoshan HUANG, Yi SU, Zhi CHEN, Danyue WU, Huiyu ZHANG
  • Publication number: 20210205643
    Abstract: Provided are a fire extinguishing method and a fire extinguishing system for a lithium ion battery, an electronic device and a storage medium. The method includes: real-timely collecting environmental parameter values in a battery box where a lithium ion batteries are placed; determining a safety level of the lithium ion battery according to the environmental parameter values and a preset threshold of each environmental parameter, and sending a fire extinguishing command to a fire extinguishing device according to a preset fire extinguishing control program, where the fire extinguishing control program is a fire extinguishing strategy corresponding to the safety level of the lithium ion battery; and enabling the fire extinguishing device to execute a fire extinguishing operation according to the fire extinguishing command.
    Type: Application
    Filed: July 16, 2019
    Publication date: July 8, 2021
    Applicants: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED, STATE GRID CORPORATION OF CHINA
    Inventors: Kai Yang, Fei Gao, Kangkang Wang, Chaoqun Liu, Mingjie Zhang, Hao Liu, Guangqing Jia, Mengmeng Geng, Kaifeng Wang