Patents Assigned to CHINA NUCLEAR POWER ENGINEERING COMPANY LTD.
  • Patent number: 10679760
    Abstract: A nuclear instrumentation system includes a source range channel, an intermediate range channel, and a power range channel. Each channel includes one detector installed around the pressure vessel. The detectors of the power range channel and the intermediate range channel both include several fission chambers. The detectors of the intermediate range channel and power range channel share several fission chambers. Since some detectors employ fission chambers, the Gamma radiation resistance property, anti-noise property, and anti-electromagnetic interference property are improved. Sharing fission chambers reduces the number of detectors to be installed, thus relieving the installation workload and the positioning of a follow-up detector. Further, the system increases the number of some channels, which increases redundancy and improves system reliability.
    Type: Grant
    Filed: November 12, 2015
    Date of Patent: June 9, 2020
    Assignees: CHINA NUCLEAR POWER ENGINEERING COMPANY LTD., CHINA GENERAL NUCLEAR POWER CORPORATION
    Inventors: Tianyou Li, Li Zeng, Rui Zhang, Hao Yang, Xing Wang, Yajie Tian, Ji Shi, Wei Wang, Huaqing Peng, Weihua Chen, Weijun Huang, Hui Jiang
  • Publication number: 20120069948
    Abstract: A method for joint configuration of nuclear power plant fuel includes the following steps: (S1) for at least one operating unit, based on an equilibrium cycle or transition cycle reactor core design, at least one new fuel element is added to at least one operating unit; (S2) after running a combustion cycle, and on basis of the new fuel elements in step (S1), more first spent fuel elements are obtained from the at least one operating unit than are obtained from the equilibrium cycle or transition cycle reactor core design, and said first spent fuel elements are kept in reserve; (S3) for at least one new starting unit, a scheduled number of new fuel elements, as well as the first spent fuel elements obtained for reserve in step (S2), are set in the first reactor cores of at least one new starting unit.
    Type: Application
    Filed: May 21, 2010
    Publication date: March 22, 2012
    Applicants: CHINA NUCLEAR POWER ENGINEERING COMPANY LTD., CHINA GUANGDONG NUCLEAR POWER HOLDING CORPORATION, CHINA NUCLEAR POWER TECHNOLOGY RESEARCH INSTITUTE
    Inventor: Zirong Ma