Patents Assigned to China University of Petroleum
-
Patent number: 12098629Abstract: Provided are a method and device for fault estimation of a measurement and control device for a rotary steerable drilling system. The method for fault estimation includes: S1, establishing a state model of the measurement and control device for the rotary steerable drilling system; S2, establishing a fault-free model filter and a fault model filter, and initializing the fault-free model filter and the fault model filter; S3, detecting whether the measurement and control device for the rotary steerable drilling system has a fault; and S4, reinitializing the fault model filter under the condition that a detection result is fault-free; reinitializing the fault-free model filter under the condition that the detection result is faulty; and estimating, by the fault model filter, the fault in real time, and obtaining, by the fault model filter, the estimation value {circumflex over (x)}wf.Type: GrantFiled: January 3, 2024Date of Patent: September 24, 2024Assignee: CHINA UNIVERSITY OF PETROLEUMInventors: Weiliang Wang, Yanfeng Geng, Mingzhu Shao, Huijie Xu, Mengyu Tu
-
Patent number: 12085483Abstract: A method of leak detection for oil and gas pipeline based on excitation response and system thereof includes: applying an active excitation signal (a pressure pulse directly input by human) or a passive excitation signal (a pressure fluctuation caused by opening and closing valves, etc.) to an oil and gas pipeline with existing leakage points, the excitation signal is reflected at the pipeline boundary and the leakage, and the reflected pressure wave continues to propagate to upstream and downstream, and finally is collected by the dynamic pressure transducer, then the existing leakage of the pipeline is detected and positioned by analyzing the transient response signal and the reflected pressure wave of leakage signal.Type: GrantFiled: September 24, 2020Date of Patent: September 10, 2024Assignees: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA), PIPECHINA SOUTH CHINA COMPANY, GUANGDONG SOUTH CHINA INTELLIGENT PIPELINE RESEARCH INSTITUTEInventors: Cuiwei Liu, Zhongshan Tian, Yuxing Li, Shaochuan Lai, Wen Yang, Gang Liu, Wubin Lin, Chen Zhang
-
Patent number: 12078054Abstract: An experimental device and method for co-existence of overflow and lost circulation in a fractured formation during drilling of a deviated well are provided. An inner cavity of an outer pipe is provided with an inner pipe to form a deviated casing. An upper side of the outer pipe is provided with a mixture outlet. A middle-lower side of the outer pipe is provided with a leakage port and two overflow ports. The gap width can be changed by adjusting a bolt and a support block to be compatible with different types of fracture models. A gas injection system includes an air compressor and a gas flowmeter. An upper port of a liquid injection system is connected to a joint arranged at upper ends of the inner pipe and outer pipe through a water pump, a liquid flowmeter and a liquid regulating valve.Type: GrantFiled: March 8, 2024Date of Patent: September 3, 2024Assignee: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA)Inventors: Bangtang Yin, Chi Zhang, Baojiang Sun, Zhiyuan Wang, Xuliang Zhang, Yonghai Gao, Xiaohui Sun, Wei Zhang
-
Publication number: 20240289899Abstract: Provided is a method for shale gas production prediction, including: acquiring real shale gas production data, and determining a target production decline curve model according to the real shale gas production data; setting a time step for production prediction, and obtaining a linear production decline curve by performing production prediction by using the target production decline curve model based on the time step; determining target shale gas production residuals according to the linear production decline curve and the real shale gas production data, inputting the target shale gas production residuals to a long short-term memory, and obtaining a residual prediction result by performing production prediction according to the long short-term memory and the time step; and determining a target production prediction result of shale gas well to be subjected to production prediction based on the linear production decline curve and the residual prediction result.Type: ApplicationFiled: January 30, 2024Publication date: August 29, 2024Applicant: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA)Inventors: Hai SUN, Fei LUO, Dongyan FAN, Lei ZHANG, Jun YAO, Shuaishi FU, Kai ZHANG, Yongfei YANG
-
Patent number: 12071849Abstract: A device for simulating gas intrusion and bullheading in a wellbore under different inclinations is provided, which includes a wellbore outer pipe with an inner pipe and an LED light source therein. An outer wall of the wellbore outer pipe is provided with one or more inlets. A bubble generator is arranged outside a lower plug, and extends through the lower plug via an air inlet needle into the inner cavity of the wellbore outer pipe. An input end of the bubble generator is connected to an air compressor. A lower outlet of the wellbore outer pipe is connected to an inlet of a formation unit through a pipeline and a back pressure valve. A simulating method using such device is also provided.Type: GrantFiled: March 28, 2024Date of Patent: August 27, 2024Assignee: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA)Inventors: Bangtang Yin, Tianbao Ding, Baojiang Sun, Zhiyuan Wang, Yonghai Gao, Hao Li, Xiaohui Sun, Xuerui Wang
-
Patent number: 12071585Abstract: The invention relates to the field of oilfield chemistry, and discloses a self-repairing plugging gel polymer for drilling fluid, a preparation method and application thereof, and the drilling fluid containing the gel polymer, wherein the polymer contains a structural unit A, a structural unit B, a structural unit C and a structural unit D, and the structural unit A is a structural unit with a structure shown in the formula (1); the structural unit B is a structural unit with a structure shown in the formula (2); the structural unit C is a structural unit with a structure shown in the formula (3); the structural unit D is a structural unit having a structure represented by the formula (4).Type: GrantFiled: November 2, 2021Date of Patent: August 27, 2024Assignee: China University of Petroleum (Beijing)Inventors: Lili Yang, Chunlin Xie, Guancheng Jiang, Tian Ao, Dechang Kong, Kaixiao Cui
-
Patent number: 12071587Abstract: Anti-corrosion and low-heat-conduction annulus protection fluid for deep-sea oil and gas exploitation and a preparation method thereof are provided. The annulus protection fluid includes: a polymer solution: 100 parts, clear water III: 100 parts to 500 parts, a thermally-insulating material: 20 parts, a corrosion inhibitor: 1 part to 7 parts, and xanthan gum: 0.3 parts to 0.5 parts, wherein the polymer solution is a mixture of a polymer and clear water II in a mass ratio of 1:(22-28); and the polymer includes the following raw materials: clear water I: 100 parts, an acrylamide: 15 parts to 20 parts, 2-2-methylpropanesulfonic acid: 5 parts to 10 parts, a crosslinking agent: 0.1 parts to 0.3 parts, and an initiator: 0.5 parts to 1 part. The annulus protection fluid exhibits excellent thermal insulation performance and corrosion resistance, and avoids the generation of hydrates and the decomposition of hydrate layers at a wellhead.Type: GrantFiled: February 5, 2024Date of Patent: August 27, 2024Assignees: Qingdao University of Technology, China University of Petroleum (East China)Inventors: Chang Lu, Yuhuan Bu, Shaorui Jing, Shenglai Guo, Huajie Liu, Heng Yang
-
Publication number: 20240264065Abstract: The present disclosure discloses a combined apparatus for experimentation on different storage modes of carbon dioxide, which comprises a displacement device, a storage reaction device and a measuring device, wherein the displacement device comprises a displacement pump, and an intermediate oil-water container and an intermediate carbon dioxide container that are arranged in parallel, the displacement pump is connected to a first end of the parallel connection of the intermediate oil-water container and the intermediate carbon dioxide container, and an inlet end of the storage reaction device is connected to a second end of the parallel connection of the intermediate oil-water container and the intermediate carbon dioxide container; the measuring device comprises a weigher, a first pressure detector, a gas-liquid separator, a gas meter and a mineral analyzer, wherein the first pressure detector is arranged in the intermediate oil-water container, and the gas-liquid separator is connected to the outlet end ofType: ApplicationFiled: December 12, 2023Publication date: August 8, 2024Applicant: China University of Petroleum (Beijing)Inventors: Hao CHEN, Xiliang LIU, Weiming CHENG, Mingsheng ZUO, Borui LI, Baoxi YANG, Yi WU, Haipeng LIU, Xinyu QI, Feng LUO, Linxi YANG, Wen LIU, Pengbo LI
-
Patent number: 12055022Abstract: A method for realizing balanced displacement of crude oil by injection and production optimization coordinated chemical flooding which comprises the following steps: determining the median size and elastic modulus of viscoelastic particles according to the average permeability of the reservoir; optimizing the concentration ratio of the total concentration of the chemical agent; the physical parameters of each layer are counted, and the hierarchical system is combined according to the entropy weight algorithm and the cluster analysis method based on the gravity center method; the optimal section slug volume ratio of the single well injected with two slugs under the heterogeneity of the permeability of the strata is calculated; and the objective function is established by combining the coefficient of variation of remaining oil saturation, the effect of chemical flooding and the cost, and the numerical simulator is used to optimize the objective function.Type: GrantFiled: March 31, 2021Date of Patent: August 6, 2024Assignees: China University of Petroleum (East China), Shandong University of Science and TechnologyInventors: Jian Hou, Kang Zhou, Qingjun Du, Yongge Liu, Yueliang Liu, Bei Wei, Dong Zhao, Zhibin An, Dejun Wu
-
Patent number: 12043742Abstract: An oil-soluble thermosensitive resin lost circulation material for protecting a reservoir includes the following raw materials in parts by weight: 40-60 parts of resin matrix, 15-40 parts of modified asphalt, 5-12 parts of viscosity modifier, 2-5 parts of cross-linking agent, 6-15 parts of softening point modifier, and 1-3 parts of dispersant; it further provides a method for preparing the resin lost circulation material; the resin lost circulation material can melt and adhere in different temperature ranges, rapid plugging is realized, and the plugging time is long; the oil-soluble thermosensitive resin lost circulation material can be dissolved by oil flow during oil well production, so that the reservoir permeability is recovered, so as to achieve the purpose of protecting the hydrocarbon reservoir.Type: GrantFiled: August 26, 2022Date of Patent: July 23, 2024Assignee: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA)Inventors: Yingrui Bai, Jinsheng Sun, Kaihe Lv, Guancheng Jiang, Rongchao Cheng, Weian Huang, Jintang Wang, Jingping Liu, Xianbin Huang, Jiafeng Jin, Jian Li, Shenglong Shi
-
Patent number: 12044106Abstract: A deep-water drilling gas kick pilot-scale apparatus, including: a simulation wellbore having an upper wellbore transitioned to a lower wellbore through a variable cross section; a drilling tool with an annular space formed between the drilling tool and the simulation wellbore; a gas-injection system, comprising an air compressor and a gas-injection pipeline; a mud circulation system, comprising a mud supply source, a first pump, a second pump, and a mud-return pipeline; a Coriolis mass flowmeter provided on the mud-return pipeline; a Doppler sensor installed on the upper wellbore; and a built-in pressure gauge carrier connected between a drill pipe and a drill bit.Type: GrantFiled: March 17, 2022Date of Patent: July 23, 2024Assignee: China University of Petroleum-BeijingInventors: Qishuai Yin, Laibin Zhang, Jin Yang
-
Publication number: 20240230935Abstract: This disclosure relates to the technical field of exploration geophysics, in particular to a method, a device, and a computer device for decoupling anisotropic elastic wave. The method includes: determining a set of Thomsen parameters included in an anisotropic model based on a received to-be-decomposed wave field decomposition request; transforming the set of Thomsen parameters to obtain a set of initial elastic parameters; performing S-wave and P-wave velocities separation processing for the set of initial elastic parameters to obtain a set of target P-wave elastic parameters and a set of target S-wave elastic parameters; and substituting those into the anisotropic model to process the to-be-decomposed wave field and obtain a target P-wave matrix and a target S-wave matrix. The process of decomposing S-wave and P-wave fields is simplified and the calculation cost is reduced according to the embodiments of this disclosure.Type: ApplicationFiled: October 24, 2023Publication date: July 11, 2024Applicant: China University of Petroleum (East China)Inventors: Qizhen DU, Shihao ZHOU, Zhaoshun LIU, Wenhao LYU, Li-Yun FU
-
Patent number: 12031412Abstract: A system for real-time optimization and adjustment of smart oilfield injection production includes a closed rectangular reservoir simulation box, a reservoir 3D-printed physical model, a simulation production horizontal wellbore system, a simulation injection horizontal wellbore system, a fluid supply system, a fluid collection system, a power fluid system and a computer data collection and control system. The reservoir 3D-printed physical model is in the closed rectangular reservoir simulation box. The simulation production horizontal wellbore system and the simulation injection horizontal wellbore system are in the reservoir 3D-printed physical model. The fluid supply system injects a displacement fluid into the simulation injection horizontal wellbore system in the reservoir 3D-printed physical model to flow to the simulation production horizontal wellbore system.Type: GrantFiled: July 7, 2021Date of Patent: July 9, 2024Assignee: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA)Inventors: Jun Yao, Junrong Liu, Kai Zhang, Wei Wang, Qingqing Jiao, Shujing Liu
-
Patent number: 12030994Abstract: A preparation method for and an application of a modified siloxane-based supercritical carbon dioxide thickener are disclosed. The method includes the following steps: using 1,3-diallyl-1,3,5-triazine-2,4,6-trione as a polymerization monomer, and dropwise adding 1,3,5,7-tetramethylcyclotetrasiloxane for hydrosilylation in the presence of a catalyst to obtain a modified siloxane polymer. The obtained modified siloxane polymer is directly used as a supercritical carbon dioxide thickener without purification post-treatment; when in use, the modified siloxane polymer is prepared into a solution with a concentration of 1-2%, has an excellent thickening effect with no cosolvent required, and has high solubility in carbon dioxide and high temperature resistance.Type: GrantFiled: July 28, 2022Date of Patent: July 9, 2024Assignee: CHINA UNIVERSITY OF PETROLEUM, EAST CHINAInventors: Yanling Wang, Bin Liu, Baojiang Sun, Lei Liang, Di Li
-
Patent number: 12024975Abstract: The invention relates to the field of oilfield development engineering, and discloses a self-growing gel dispersion active fluidity control system and a fluid channeling control method for a low-permeability-tight reservoir. The system contains 100 parts by weight of a self-growing gel dispersion and 0.15-0.6 part by weight of a surfactant, the self-growing gel dispersion is prepared by shearing and grinding nano-reinforced chromium-aldehyde double-group cross-linked integral gel, and the preparation method of the nano-reinforced chromium-aldehyde double-group cross-linked integral gel comprises the following steps: adding a functional polymer, a phenolic resin cross-linking agent, are organic chromium cross-linking agent and a nano-reinforcer into water, mixing, and curing.Type: GrantFiled: April 7, 2023Date of Patent: July 2, 2024Assignees: China University of Petroleum (East China), China University of Geosciences (Beijing)Inventors: Yifei Liu, Caili Dai, Guang Zhao, Chenwei Zou, Ning Yang, Qing You, Mingwei Zhao, Yining Wu, Lin Li, Yongpeng Sun
-
Patent number: 12019206Abstract: The present discloses a simulation device and simulation method for liquid sulfur-gas-water multiphase flow and use thereof in a high-temperature and high-pressure gas reservoir with high sulfur content.Type: GrantFiled: December 21, 2023Date of Patent: June 25, 2024Assignees: Peking University, China University of Petroleum (East China)Inventors: Tong Li, Yongsheng Ma, Caili Dai, Guang Zhao, Qian Li, Daqian Zeng, Ning Sun
-
Publication number: 20240200431Abstract: A method and system for predicting water flooding recovery of fault block reservoirs considering a whole process optimization includes: determining influencing factors in water flooding recovery of fault block reservoirs; screening master parameters of the water flooding recovery of the fault block reservoirs; determining a single-factor correlation between the water flooding recovery of the fault block reservoirs and the master parameters; designing multi-factor orthogonal experimental schemes; performing a whole-process water flooding optimization for each of the experimental schemes including separate-layer injection and production, well-type conversion, and injection and production adjustment, to obtain the maximum water flooding recovery; and determining a prediction model of the water flooding recovery of the fault block reservoirs using least square method based on results of the whole process optimization of orthogonal experiments, further obtaining a prediction model of the water flooding recovery ofType: ApplicationFiled: January 21, 2024Publication date: June 20, 2024Applicants: China University of Petroleum (East China), Shandong University of Science And TechnologyInventors: Jian Hou, Kang Zhou, Shuai Liu, Zhibin An, Qingjun Du, Bei Wei, Yongge Liu
-
Patent number: 12012832Abstract: The present disclosure relates to a method and system for predicting a time-varying principle of waterflooding oil reservoir formation parameters. Firstly, a T2 spectrum-pore size relation model is built according to a measured pore size distribution curve and a measured T2 spectrum. A T2 spectrum of a rock sample at different water injection amounts during a waterflooding physical simulation experiment is acquired. The acquired T2 spectrum at different water injection amounts is then converted into a pore size distribution at different water injection amounts, and a pore network model at different water injection amounts is built with the pore size distribution. Oil-water two-phase flow simulation is performed, and a corresponding oil-water two-phase relative permeability curve of the rock sample at different pore volume (PV) multiples is obtained eventually. The oil-water two-phase relative permeability curve is the formation parameters in the waterflooding oil reservoir.Type: GrantFiled: July 26, 2023Date of Patent: June 18, 2024Assignee: CHINA UNIVERSITY OF PETROLEUM (EAST CHINA)Inventors: Sen Wang, Kun Wang, Qihong Feng, Shunming Li, Yijing Du, Zheng Wu, Xiang Wang, Jiyuan Zhang, Xianmin Zhang
-
Publication number: 20240184005Abstract: The embodiment of the disclosure relates to an elastic wave stress tensor double-dot product seismic imaging method and device. The method comprises: obtaining a decoupled particle vibration velocity vector wave field by utilizing the existing decoupled wave equation method for the detected wave field; then obtaining a decoupled pseudo-stress wave field by constructing the decoupled pseudo-stress equation by using the obtained decoupled particle vibration velocity vector wave field; and finally computing a source second-order stress tensor wave field and the decoupled detected second-order stress tensor wave field by using the double-dot product cross-correlation imaging condition algorithm, to obtain the final scalar imaging results. With the embodiment of the present disclosure, the combined P-wave and S-wave stress exploration can be realized, therefore, the obtained imaging results can be used to accurately predict the risk of gas exploration.Type: ApplicationFiled: October 23, 2023Publication date: June 6, 2024Applicant: China University of Petroleum (East China)Inventors: Qizhen DU, Fuyuan ZHANG, Li-Yun FU
-
Publication number: 20240184844Abstract: A method and system for predicting heat exchanger performance, an electronic device and a storage medium are provided. The method comprises: acquiring a flow unit of the heat exchanger and constructing a physical model of the flow unit according to structural parameters of the heat exchanger; constructing a coupled model of an interphase transfer mechanism for oil-gas-water three-phase flow using computational fluid dynamics according to the physical model; constructing a fully coupled population balance model for flow and heat transfer of oil-gas-water three-phase flow; solving the fully coupled population balance model to obtain a model calculation result and determining a Nusselt number and a Fanning friction factor; and determining a comprehensive heat transfer factor, wherein the comprehensive heat transfer factor is used to evaluate heat transfer performance of the heat exchanger.Type: ApplicationFiled: October 19, 2023Publication date: June 6, 2024Applicant: China University of Petroleum (East China)Inventors: Xinyue Duan, Manrui Xu, Liang Gong, Chuanyong Zhu, Jiadong Li, Tianpeng Zhang