Patents Assigned to CNOOC PETROLEUM NORTH AMERICA ULC
-
Patent number: 11008842Abstract: A method for capturing hydrocarbons from a formation is provided. After a first hydraulic fracturing of a formation to produce a first conditioned formation, and while hydrocarbons are being produced from the first conditioned formation, a predetermined wellbore characteristic is monitored for. The predetermined wellbore characteristic is based on at least a pressure within the first conditioned formation. After detecting the predetermined wellbore characteristic, a second hydraulic fracturing of the formation is effected to produce a second conditioned formation.Type: GrantFiled: October 14, 2016Date of Patent: May 18, 2021Assignee: CNOOC PETROLEUM NORTH AMERICA ULCInventors: Roberto Aguilera, Daniel Orozco, Karthikeyan Selvan, Faisal Qureshi
-
Patent number: 10788407Abstract: A system for sensing an estimated composition of a produced fluid being conducted from a reservoir includes: at least one device for measuring temperature data; at least one device for obtaining flow rate data, pressure data, pump speed data and valve travel data; a first produced fluid density generator; a second produced fluid density generator; and a composition generator. The first produced fluid density generator is configured to generate a first produced fluid density based on the obtained flow rate, pressure, pump speed and valve travel data. The second produced fluid density generator is configured to generate a second produced fluid density based at least in part on the measured temperature data. The composition generator is configured to: iteratively generate a phantom component content, a bitumen content and a water content for the produced fluid based on at least in part on: a material balance of the produced fluid.Type: GrantFiled: October 28, 2016Date of Patent: September 29, 2020Assignee: CNOOC PETROLEUM NORTH AMERICA ULCInventors: Alireza Nazari, Yiming Ji, Daniel Joseph Giesbrecht
-
Patent number: 10760391Abstract: There is provided a method of producing hydrocarbon material. A first hydrocarbon material is produced from the formation, the first hydrocarbon material including a gaseous hydrocarbon material originally in place in the formation. At least a portion of the produced gaseous hydrocarbon material is injected into the formation to increase the formation pressure. A second hydrocarbon material is produced from the formation.Type: GrantFiled: November 16, 2016Date of Patent: September 1, 2020Assignee: CNOOC PETROLEUM NORTH AMERICA ULCInventors: Roberto Aguilera, Alfonso Fragoso, Yi Wang, Guicheng Jing, Karthikeyan Selvan, Thomas Harding, Faisal Qureshi
-
Patent number: 10648313Abstract: A process for producing hydrocarbon material from a subterranean formation comprising: injecting a first conditioning material, via a wellbore, to effect fracturing of a subterranean formation such that a hydraulically fractured formation, including an induced fracture, is obtained; after the fracturing, injecting post-fracturing conditioning material, via the wellbore, into hydraulically fractured formation; and after the injecting of the post-fracturing conditioning material, producing, via the wellbore, hydrocarbon material from the hydraulically fractured formation; wherein: the pressure of the post-fracturing conditioning material is less than the pressure of the injected fracturing fluid; and the post-fracturing conditioning material includes proppant.Type: GrantFiled: May 14, 2018Date of Patent: May 12, 2020Assignee: CNOOC PETROLEUM NORTH AMERICA ULCInventors: Roberto Aguilera, Karthik Selvan
-
Publication number: 20200140764Abstract: A de-asphalting system for solvent de-asphalting including a desasphalter and a controller. The deasphalter defines a contacting zone and a separation zone. The contact zone contacts a feed, including asphaltenes, and a solvent to form a mixture, where the contacting of the feed and the solvent causes at least a portion of the asphaltenes to precipitate out of the mixture. The contacting is disposed at an operating temperature. The separation zone separates the mixture into a de-asphalted oil-comprising material fraction (“S+PDAO”) and a asphaltene-rich material fraction. The asphaltene-rich material fraction includes the precipitated asphaltenes. The controller controls at least one operating parameter of the deasphalter based on at least on a refractive index of the S+PDAO phase.Type: ApplicationFiled: September 21, 2017Publication date: May 7, 2020Applicant: CNOOC PETROLEUM NORTH AMERICA ULCInventors: Nestor Gregorio ZERPA, Yuhan XIA, Milan TODOROVIC
-
Patent number: 10344579Abstract: There is provided a process for producing hydrocarbons from a reservoir. The process includes within the hydrocarbon reservoir, electrically heating a liquid heating fluid such that the liquid heating fluid is evaporated to produce a gaseous heating fluid, heating hydrocarbon material with the gaseous heating fluid such that the heated hydrocarbon material is mobilized and such that the gaseous heating fluid is condensed to produce a condensed heating fluid, and electrically heating at least a fraction of the condensed heating fluid such that the at least a condensed heating fluid fraction is re-evaporated, and while the evaporation, the condensing, and the re-evaporation are being effected, producing a produced fluid including at least the mobilized hydrocarbon material.Type: GrantFiled: May 7, 2015Date of Patent: July 9, 2019Assignee: CNOOC PETROLEUM NORTH AMERICA ULCInventors: Thomas Harding, Richard Kelso Kerr, Ann Chen Howe