Patents Assigned to Doosan Heavy Industries & Construction Co., Ltd.
  • Patent number: 10612417
    Abstract: A gas turbine rotor includes: a first rotor in a shaft shape extending by a predetermined length in an axial direction, and provided with an insertion hole at an end of the first rotor; a second rotor in a shaft shape extending by a predetermined length in the axial direction, and provided with an insertion part extending by a predetermined length at an end of the second rotor and corresponding to the insertion hole such that the insertion part is inserted into the insertion hole; and a connecting member mounted between the insertion hole and the insertion part to connect the first rotor and the second rotor together, and made of a material having a thermal expansion coefficient different from a thermal expansion coefficient of both the first rotor and the second rotor.
    Type: Grant
    Filed: September 25, 2017
    Date of Patent: April 7, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Kibaek Kim
  • Patent number: 10605124
    Abstract: The present disclosure relates to a hybrid power generating system comprising a power generating system using supercritical CO2 configured to use the supercritical CO2 as a working fluid and a liquefied natural gas (LNG) treatment system configured to vaporize LNG, where the working fluid is cooled in at least one of the power generating system using supercritical CO2 and the LNG treatment system and is re-circulated to the power generating system using supercritical CO2.
    Type: Grant
    Filed: June 19, 2018
    Date of Patent: March 31, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Song Hun Cha
  • Patent number: 10605215
    Abstract: A fuel supply nozzle unit includes a fuel supply nozzle, a rear end and an end plate. The fuel supply nozzle includes a front end that has a plurality of fuel supply holes. The rear end extends from the front end and is formed with a threaded portion on its outer surface. The end plate is connected to the rear end and is formed with a plurality of threaded holes.
    Type: Grant
    Filed: June 10, 2016
    Date of Patent: March 31, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Heon Seop Jin
  • Patent number: 10605085
    Abstract: The present disclosure relates to a plurality of disks, on which outer circumferential surfaces a plurality of blades are arranged, and has an objective to provide a gas turbine disk including a plurality of cooling channels penetrating the side surfaces of the disks and spaced from each other in a circumferential direction, and reinforcement parts coupled to partial arcs of exits of the cooling channels so as to reduce stress concentrated on the cooling channels.
    Type: Grant
    Filed: July 15, 2016
    Date of Patent: March 31, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Sunghul Jung
  • Patent number: 10605533
    Abstract: A deaerator includes a tank, a spray unit, a steam supply unit, a bleed unit and a discharge pipe. The spray unit is disposed at an upper portion of the tank and configured to supply water to the tank. The steam supply unit is disposed inside the tank to supply steam to the tank. The bleed unit is disposed at the upper portion of the tank and adjacent to the spray unit. The bleed unit is configured to bleed air from an inside of the tank. The discharge pipe is configured to discharge water without air to an outside of the tank.
    Type: Grant
    Filed: August 29, 2016
    Date of Patent: March 31, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Young Jun Choi, Eung Chan Lee
  • Patent number: 10598021
    Abstract: The present invention relates to a gas turbine which includes a cooling system provided with cooling air supply paths bypassed through an outside casing and, more specifically, to a gas turbine including a cooling system and a cooling method, wherein, in order to supply cooling air to a plurality of turbine blades and other devices provided to the inside of the gas turbine, cooling air supply paths are not provided to the rotor center shaft of the gas turbine but provided around the outer casing of the gas turbine so as to achieve the increased effect in the aerodynamic efficiency of the compressor and the turbine. According to the above structure and method, it may be possible to provide the cooling air supply paths not to the rotor center shaft of the gas turbine but around the outer casing of the gas turbine, thereby finally achieving the increased effect in the aerodynamic efficiency of the compressor and the turbine.
    Type: Grant
    Filed: July 14, 2016
    Date of Patent: March 24, 2020
    Assignee: Doosan Heavy Industries & Construction Co., Ltd.
    Inventors: Kyung Kook Kim, Dong Hwa Kim, Jong Seon Kim, Victor Shemyatovskiy
  • Patent number: 10600036
    Abstract: Provided is a wind power generation management apparatus including: a collection unit configured to collect first data generated in a wind power plant; a fault occurrence prediction unit configured to compare the collected first data with a predefined normal state model, to create a second data indicating a state of the wind power plant based on a result of the comparison, and to predict occurrence of a fault in the wind power plant according to the second data; and a maintenance plan establishment unit configured to estimate an operating time corresponding to a time from a start of the wind power plant until the fault occurs, and to generate a maintenance plan which can be performed for the fault during the estimated operating time.
    Type: Grant
    Filed: July 30, 2015
    Date of Patent: March 24, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Jong Duk Son
  • Patent number: 10598042
    Abstract: A gas turbine ring segment for a gas turbine. The gas turbine includes a rotor rotating about an axis, a housing containing the rotor to be rotatable, and a stationary wing ring disposed on an inner circumferential portion of the housing to be annular about the axis. A plurality of the gas turbine ring segments is disposed on the gas turbine to be dividable in a circumferential direction. Each of the cooling holes includes a first cooling hole and a second cooling hole having different diameters, the first cooling hole and the second cooling hole being connected serially to each other. This structure controls the flow rate of refrigerant flowing through the cooling holes while maximizing heat transfer efficiency.
    Type: Grant
    Filed: February 6, 2018
    Date of Patent: March 24, 2020
    Assignee: Doosan Heavy Industries & Construction Co., LTD.
    Inventor: Changyong Lee
  • Patent number: 10596495
    Abstract: The present invention relates to a multistage fiber filtering apparatus capable of selectively filtering depending on turbidity of raw water, in which a first filtration mode where the raw water passes through a fiber ball medium, a second filtration mode where the raw water passes through a fiber yarn medium, or a third filtration mode where the raw water passes through both of the fiber yarn medium and the fiber ball medium may be selectively operated.
    Type: Grant
    Filed: June 21, 2017
    Date of Patent: March 24, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Jung June Lee, Sung Won Park
  • Patent number: 10590797
    Abstract: A combustion system can include: a liner defining a combustion chamber; a casing covering the combustion chamber; a first tube disposed in the liner; a machined union disposed inside the casing and connected to the first tube; a second tube passing through the casing and connected to the machined union; a sensor housing disposed outside the casing and connected to the second tube; and an infinite tube connected to the sensor housing.
    Type: Grant
    Filed: March 21, 2018
    Date of Patent: March 17, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Esam Abu-Irshaid, Kevin James Spence
  • Patent number: 10590784
    Abstract: A nozzle box assembly includes steam inlets, through which working steam is supplied, a torus part connected to the steam inlets so as to form an annular steam path and having an opening portion, in which a part of the front surface of the annular steam path is opened, a bridge ring connected to the front surface of the torus part and having a bridge inside, and a steam path ring connected to the bridge ring so as to provide a path, which is connected to a stage, and provided with a plurality of vanes, wherein the bridge ring and the steam path ring are formed of the coupling of a plurality of divisions, which are divided in the circumferential direction thereof, and the divisions are coupled to the front surface of the torus part.
    Type: Grant
    Filed: February 3, 2017
    Date of Patent: March 17, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Dongwoo Kang
  • Patent number: 10590847
    Abstract: A flue gas recirculation combustor includes a combustor chamber configured such that fuel and combustion gas are injected therein to cause combustion and having a nozzle-side end and a combustor outlet, a nozzle can connected to the nozzle-side end of the combustor chamber, a plurality of nozzles disposed in the nozzle can and configured such that an injection direction thereof is directed to a side of the combustor chamber, and a sleeve disposed in a premixing space defined between the nozzle can and the nozzle-side end of the combustor chamber, the sleeve including a recirculation pathway to recirculate combustion air from the combustor chamber to the premixing space.
    Type: Grant
    Filed: November 14, 2017
    Date of Patent: March 17, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Hokeun Kim, Sunghyun Kim, Cheahong Choi
  • Patent number: 10584877
    Abstract: A combustor can include: a combustion chamber; a cap covering the combustion chamber; a first swirler inlet cup passing through the cap and having a first length and a first bell mouth; a second swirler inlet cup passing through the cap and having a second length and a second bell mouth; and a third swirler inlet cup passing through the cap and having a third length and a third bell mouth, wherein the first length is different from the third length, and wherein the first bell mouth is different from the third bell mouth. The first, second, and third swirler inlet cups can have different diameters, respectively.
    Type: Grant
    Filed: April 28, 2017
    Date of Patent: March 10, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Kevin Spence, Vladimir Belyaev
  • Patent number: 10587167
    Abstract: A rotor assembly includes: coil turns each of which has a plurality of conductors stacked in a multilayer structure and includes a linear part interposed between teeth of a rotor body and formed in a longitudinal direction with ducts through which cooling fluid moves, and a curved part extending from the linear part and disposed in an arc shape on an outer circumferential surface of a spindle; and a turn insulator interposed between the conductors, and insulating the conductors from each other. The curved part may include a wave-shaped cooling path, which is formed in a longitudinal direction in a planar surface thereof, communicates with the ducts, and guides the cooling fluid to the ducts. Furthermore, through holes each of which is shorter than the duct are formed in the turn insulator at a position corresponding to the duct.
    Type: Grant
    Filed: March 30, 2016
    Date of Patent: March 10, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd.
    Inventors: Sung Ha Kim, Kye Ha Hwang
  • Patent number: 10580541
    Abstract: A system for simulating maintenance of a reactor core protection system that has at least two or more channels, includes: a simulation signal generation unit for generating a simulation state signal including a normal state or an abnormal state, a communication unit connected to each of the channels of the reactor core protection system to transmit the state signal to the channel, and a control unit for receiving a result signal output from the channel in response to the input simulation state signal and confirming whether the reactor core protection system normally determines a reactor core state by analyzing the result signal.
    Type: Grant
    Filed: June 8, 2017
    Date of Patent: March 3, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Changhun Kang, Baegyo Jo, Sanghoon Lee
  • Patent number: 10570887
    Abstract: Disclosed herein is a vibration monitoring and diagnosing system for monitoring conditions of a wind power generator and diagnosing a defective portion thereof using vibration characteristics obtained from acceleration sensors mounted to the wind power generator. A vibration-based defect detecting method may include: collecting vibration data of the wind power generator using the plurality of sensors; extracting a first characteristic value of a time domain based on the vibration data; extracting characteristic values in one or more frequency bands for a location of each sensor in a frequency domain or an envelope frequency domain if the first characteristic value is greater than a preset alarm setting value; and determining that a defect is present when at least one characteristic value of the characteristic values is greater than a preset normal value.
    Type: Grant
    Filed: June 9, 2017
    Date of Patent: February 25, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Jong Duk Son, Jeong Hoon Lee, Ki Hak Lee, Seung Man Eom
  • Patent number: 10570747
    Abstract: A turbine blade in an industrial gas turbine includes a blade surface to be cooled by a film of cooling fluid, a plurality of cooling holes on the blade surface through which cooling fluid flows, each cooling hole including an inlet portion and an outlet portion, and a trench on the blade surface surrounding at least one outlet portion of the cooling hole, the trench extending in an axial direction and a radial direction from the outlet portion of the cooling hole, wherein the outlet portion of the cooling hole has a shape configured to generate a first stage diffusion of the cooling fluid and a wall of the trench is positioned in the axial direction from the outlet portion of the cooling hole to generate a second stage diffusion of the cooling fluid, thereby forming the film of cooling fluid.
    Type: Grant
    Filed: October 2, 2017
    Date of Patent: February 25, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventor: Ronald Rudolph
  • Patent number: 10563277
    Abstract: A hot-work mold steel includes 0.37 to 0.46 wt % of carbon (C), 0.25 to 0.5 wt % of silicon (Si), 0.36 to 0.56 wt % of manganese (Mn), 2.0 to 5.0 wt % of chromium (Cr), 1.4 to 2.6 wt % of molybdenum (Mo), 0.4 to 0.8 wt % of vanadium (V), 0.0007 to 0.004 wt % of boron (B), 0.002 to 0.022 wt % of aluminum (Al), 0.001 to 0.09 wt % of titanium (Ti) and the remainder of iron (Fe) and inevitable impurities. The hot-work mold steel exhibits superior thermal conductivity, hardenability, durability, and nitriding characteristics, and increased resistance to heat check and melt-out. A die-casting mold made of the steel has improved thermal conductivity regardless of mold size and a prolonged life cycle and can improve the surface quality in manufactured parts.
    Type: Grant
    Filed: May 28, 2018
    Date of Patent: February 18, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Kuk Cheol Kim, Byoung Koo Kim, Jeong Wook Kim, Jae Suk Jeong
  • Patent number: 10561981
    Abstract: A wet desulfurization apparatus includes a chamber enclosing a space for passing flue gas and including a first barrier partitioning the space into first and second chamber regions, a flue gas inlet to introduce raw flue gas into the first chamber region, and a flue gas outlet to discharge desulfurized flue gas from the second chamber region; a second barrier partitioning a slurry reservoir into a first reservoir part to store a first pH alkaline slurry and a second reservoir part to store a second pH alkaline slurry; a first sprayer to spray the alkaline slurry from the first reservoir part into the first chamber region to remove sulfur from the flue gas in the first chamber region; and a second sprayer to spray the alkaline slurry from the second reservoir part into the second chamber region to remove sulfur from the flue gas in the second chamber region.
    Type: Grant
    Filed: December 17, 2018
    Date of Patent: February 18, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: In Gab Chang, Min Su Paek, Jeong Seok Yoo, Joon Ho Kim
  • Patent number: 10557672
    Abstract: The present disclosure relates to a heat transfer tube having rare-earth oxide deposited on a surface thereof and a method for manufacturing the same, in which the rare-earth oxide can be deposited on the surface of the heat transfer tube to implement a superhydrophobic surface even under the high temperature environment and a plurality of assembled heat transfer tubes can be coated by coating a complex shape by depositing rare-earth oxide using a method for dipping a surface of the heat transfer tube and coating the same, thereby reducing or preventing the heat transfer tubes from being damaged during the assembling of the heat transfer tubes after the coating.
    Type: Grant
    Filed: September 20, 2017
    Date of Patent: February 11, 2020
    Assignee: Doosan Heavy Industries Construction Co., Ltd
    Inventors: Hyun Sik Kim, Hyun Gee Kim, Jin Bum Kim, Young Suk Nam, Jae Hwan Shim