Patents Assigned to Drilling Research Institute of China National Petroleum Company
  • Patent number: 10408042
    Abstract: The invention discloses a series of methods to design drilling trajectory and control drilling operations in a optimized way in carbonate formation. The trajectory design method comprises: utilizing earthquake data to obtain contours of the carbonate rock fractures; determining a safe distance from each carbonate rock fracture; determining a segmented drilling trajectory for each fracture or vuggy structures in carbonate formation; and sequentially connecting the segmented drilling trajectories of neighboring fracture and vuggy to obtain a smooth horizontal drilling trajectory. The invention optimizes the carbonate rock reservoir drilling trajectory, thus improving connection between a horizontal well and the fractures. This reduces development costs, increases exploration and development efficiency and, at the same time, eliminates leaks resulting from the drilling process, thereby allowing for smooth drilling to a target well depth.
    Type: Grant
    Filed: January 27, 2017
    Date of Patent: September 10, 2019
    Assignee: DRILLING RESEARCH INSTITUTE OF CHINA NATIONAL PETROLEUM COMPANY
    Inventors: Lin Shi, Yingcao Zhou, Wei Liu, Xiaoqiang Zhai, Ying Wang, Kai Wang, Boqi Zhou
  • Patent number: 9759026
    Abstract: This invention discloses a method for wellbore pressure correction. The method comprises: measuring a bottom hole pressure using a downhole pressure measurement-while-drilling tool; calculating a predicted bottom hole pressure; and correcting a wellbore pressure using the measured bottom hole pressure and the predicted bottom hole pressure, to achieve managed pressure drilling (MPD). The invention makes up for the defect in the existing art that the difference between a wellbore pressure calculation processing method and the actual downhole pressure is relatively great, and is capable of more quickly and accurately calculating the wellbore pressure in real time so that accurate calculation and real-time correction and control of dynamic wellbore pressure on a narrow density window formation are achieved, thereby meeting the requirement of good bottom hole pressure and the requirement of ensuring safe and quick drilling.
    Type: Grant
    Filed: January 27, 2017
    Date of Patent: September 12, 2017
    Assignee: Drilling Research Institute of China National Petroleum Company
    Inventors: Wei Liu, Lin Shi, Kai Wang, Yingcao Zhou, Xiaoqiang Zhai, Qingfeng Guo, Boqi Zhou
  • Publication number: 20170138137
    Abstract: This invention discloses a method for wellbore pressure correction. The method comprises: measuring a bottom hole pressure using a downhole pressure measurement-while-drilling tool; calculating a predicted bottom hole pressure; and correcting a wellbore pressure using the measured bottom hole pressure and the predicted bottom hole pressure, to achieve managed pressure drilling (MPD). The invention makes up for the defect in the existing art that the difference between a wellbore pressure calculation processing method and the actual downhole pressure is relatively great, and is capable of more quickly and accurately calculating the wellbore pressure in real time so that accurate calculation and real-time correction and control of dynamic wellbore pressure on a narrow density window formation are achieved, thereby meeting the requirement of good bottom hole pressure and the requirement of ensuring safe and quick drilling.
    Type: Application
    Filed: January 27, 2017
    Publication date: May 18, 2017
    Applicant: Drilling Research Institute of China National Petroleum Company
    Inventors: Wei LIU, Lin SHI, Kai WANG, Yingcao ZHOU, Xiaoqiang ZHAI, Qingfeng GUO, Boqi ZHOU