Abstract: A method of building a structure at a job site, the method comprising dividing the structure into multiple substructures, the multiple substructures defining the structure; selecting at least one construction automation module adapted to assist in assembly of the structure at the job site, the at least one construction automation module provided at the job site; defining a material kit for at least one substructure, the material kit having components; identifying automation assisted components of the material kit as one or more of the components identified to be handled by the at least one construction automation module; fabricating the material kit for the at least one substructure is provided, the components of the material kit being pre-cut to length and size; delivering the material kit to the job site; supplying the automation assisted components of the material kit to the automation component; and assembling the substructure using the automation component.
Abstract: A method of framing a structure at a job site. The method of framing has a step of providing a framing material kit having framing components, the framing components being pre cut to length and size to form at least a portion of the structure, the framing components having mating pins and mating sockets that mate during assembly of the structure. A step of assembling mating framing components from the framing components to form the portion of the structure by mating the mating pins and the mating sockets and fastening the mating framing components together is provided.
Abstract: A construction fastening system adapted to fasten sheathing to framing with one or more fasteners. The fastening system has a frame and a fastening actuator coupled to the frame. The fastening actuator has a fastener reservoir portion and a fastener insertion portion. A position detector is coupled to the frame, the position detector connected to a controller, the position detector adapted to detect a position of the system. A trigger is coupled to the fastening actuator, the trigger coupled to the controller. The fastening actuator is adapted to insert a fastener from the reservoir into the sheathing upon actuation of the trigger. The controller is adapted to actuate the trigger upon detection of a predetermined change in the position of the system.
Abstract: A building material and workflow control system adapted to manage workflow associated with a building of a construction project at a job site. The building material and workflow control system has a server having a processor and a database. The processor is programmed to identify a construction sequence of the construction project. The processor is further programmed to identify kits of assets and materials needed to execute steps of the construction sequence. The processor is further programmed to identify and implement assembly features on the materials associated with use of the assets needed to execute steps of the construction sequence. The processor is further programmed to provide and stage the kits of assets and materials from a source to the jobsite utilizing real time dynamic knowledge of an erection state of the building at the job site.