Abstract: A cable bolt includes a multi-strand cable segment constructed from steel wire strands, and a drive head. A compressible porous backer rod is placed along cable segment adjacent the drive head. A tubing portion provides a conduit for liquid grout injected under pressure into the bore hole. Tubing portion includes discharge holes that may be predrilled through the wall of the tubing portion. The holes provide a predetermined distribution path for the liquefied grout that is injected into the bore hole. Discharge holes may be evenly dispersed longitudinally along the wall, or distributed to provide a desired, unequal distribution of grout. Distribution holes may be larger at the top of the tubing, or may be distributed adjacent to the top of tubing portion to allow greater cross-sectional flow of grout from the tubing to compensate for factors that restrict grout flow nearer the top.
Abstract: A cable bolt includes a multi-strand cable segment constructed from steel wire strands, and a drive head. A compressible porous backer rod is placed along cable segment adjacent the drive head. A tubing portion provides a conduit for liquid grout injected under pressure into the bore hole. Tubing portion includes discharge holes that may be predrilled through the wall of the tubing portion. The holes provide a predetermined distribution path for the liquefied grout that is injected into the bore hole. Discharge holes may be evenly dispersed longitudinally along the wall, or distributed to provide a desired, unequal distribution of grout. Distribution holes may be larger at the top of the tubing, or may be distributed adjacent to the top of tubing portion to allow greater cross-sectional flow of grout from the tubing to compensate for factors that restrict grout flow nearer the top.
Abstract: A water-resistant mine bulkhead or seal is provided in which two walls are constructed across the mine entry. One of the walls is constructed in layers. After a lower portion of the layered wall is erected, a first layer of gravel is provided between the walls. The gravel is then saturated with a binding material such as a polyurethane composition so that the binding material fills the voids between the gravel particles. Additional layers of gravel subsequently saturated with the binding material are provided until the gravel layer is equal in height to the lower portion of the layered wall. The layered wall is then further erected and the process continues until the layered wall is completely constructed and the binding material-saturated filler material emplaces the mine roof. Finally, the exposed surface of the exposed wall is coated with a sealant. Alternatively, the binding material and filler material can be pre-mixed and injected into the space between the two walls.