Abstract: The invention relates to a parallelization method for black-start subsystems of a power grid with external support, which includes, after power blackout, partitioning the power grid into subsystems, and respectively performing black-start on the subsystems based on a power grid black-start research scheme, performing stability check on each subsystem, performing voltage calculation on parallel lines between the subsystems, checking the parallelizing simulation of the subsystems, and determining a feasible parallelizing path and a recommendable charging direction.
Type:
Grant
Filed:
May 10, 2016
Date of Patent:
November 6, 2018
Assignees:
STATE GRID CORPORATION OF CHINA, ECONOMIC & TECHNOLOGY RESEARCH INSTITUTE OF HUBEI ELECTRIC POWER COMPANY, CENTRAL CHINA GRID COMPANY LIMITED