Patents Assigned to FOROIL
  • Patent number: 9031821
    Abstract: A production simulator (2), for simulating a mature hydrocarbon field, providing quantity produced (Q?ktb) per phase, per well, per layer (or group of layers) and per time as a function of production parameters (PP), wherein the production simulator (2) matches history data (HD) of the mature hydrocarbon field and verifies a Vapnik condition.
    Type: Grant
    Filed: November 13, 2012
    Date of Patent: May 12, 2015
    Assignee: Foroil
    Inventors: Jean-Marc Oury, Bruno Heintz, Hugues de Saint Germain
  • Patent number: 8532968
    Abstract: A method of improving the production of a mature gas or oil field, the field comprising a plurality of existing wells, the method comprising the steps of providing a field simulator capable of predicting a production of the field in function of a given scenario, a scenario being a set of data comprising production parameters of the existing wells and, the case may be, location and production parameters of one or more new wells, determining drainage areas of the existing wells using the field simulator, determining locations of candidate new wells such that drainage areas of the candidate new wells, determined using the field simulator, do not overlap with the drainage areas of the existing wells, optimizing the value of a gain function which depends on the field production by determining a set of wells out of a plurality of sets of wells, which optimize the value of said gain function, each set of wells of said plurality of sets of wells comprising the existing wells and new wells selected among the candidate
    Type: Grant
    Filed: June 16, 2010
    Date of Patent: September 10, 2013
    Assignee: Foroil
    Inventors: Jean-Marc Oury, Bruno Heintz, Hugues de Saint Germain, Rémi Daudin, Benoit Desjardins
  • Patent number: 8412501
    Abstract: A production simulator (2), for simulating a mature hydrocarbon field, providing quantity produced (Q?ktb ) per phase, per well, per layer (or group of layers) and per time as a function of production parameters (PP), wherein the production simulator (2) matches history data (HD) of the mature hydrocarbon field and verifies a Vapnik condition.
    Type: Grant
    Filed: June 16, 2010
    Date of Patent: April 2, 2013
    Assignee: FOROIL
    Inventors: Jean-Marc Oury, Bruno Heintz, Hugues de Saint Germain
  • Publication number: 20130073269
    Abstract: A production simulator (2), for simulating a mature hydrocarbon field, providing quantity produced (Q?ktb) per phase, per well, per layer (or group of layers) and per time as a function of production parameters (PP), wherein the production simulator (2) matches history data (HD) of the mature hydrocarbon field and verifies a Vapnik condition.
    Type: Application
    Filed: November 13, 2012
    Publication date: March 21, 2013
    Applicant: FOROIL
    Inventor: FOROIL
  • Publication number: 20110313743
    Abstract: A method of improving the production of a mature gas or oil field, the field comprising a plurality of existing wells, the method comprising the steps of providing a field simulator capable of predicting a production of the field in function of a given scenario, a scenario being a set of data comprising production parameters of the existing wells and, the case may be, location and production parameters of one or more new wells, determining drainage areas of the existing wells using the field simulator, determining locations of candidate new wells such that drainage areas of the candidate new wells, determined using the field simulator, do not overlap with the drainage areas of the existing wells, optimizing the value of a gain function which depends on the field production by determining a set of wells out of a plurality of sets of wells, which optimize the value of said gain function, each set of wells of said plurality of sets of wells comprising the existing wells and new wells selected among the candidate
    Type: Application
    Filed: June 16, 2010
    Publication date: December 22, 2011
    Applicant: FOROIL
    Inventors: Jean-Marc Oury, Bruno Heintz, Hugues de Saint Germain, Rémi Daudin, Benoît Desjardins
  • Publication number: 20110313744
    Abstract: A production simulator (2), for simulating a mature hydrocarbon field, providing quantity produced (Q?ktb) per phase, per well, per layer (or group of layers) and per time as a function of production parameters (PP), wherein said production simulator (2) matches history data (HD) of said mature hydrocarbon field and verifies a Vapnik condition.
    Type: Application
    Filed: June 16, 2010
    Publication date: December 22, 2011
    Applicant: FOROIL
    Inventors: Jean-Marc Oury, Bruno Heintz, Hugues de Saint Germain