Abstract: A method performed by a FCU comprising receiving a MPCP request message from a CNU via an electrical network, wherein the MPCP request message comprises a first timestamp, adjusting the first timestamp in the MPCP request message by an electrical network delay, and forwarding the MPCP request message with the adjusted timestamp to an OLT via an optical network. Also disclosed is a method performed by an OLT comprising receiving a MPCP message from a CNU via a FCU and an optical network, obtaining an arrival time of the MPCP message, adjusting a timestamp in the MPCP message by subtracting an electrical network delay from the timestamp, and computing a RTT delay based on the timestamp and the arrival time.
Type:
Application
Filed:
October 10, 2013
Publication date:
April 16, 2015
Applicant:
Futurewel Technologies, Inc.
Inventors:
Fang Lin Sun, Quan Bo Zhao, Li Zhang, Guang Sheng Wu, Jim Chen
Abstract: In accordance with an embodiment, a method of operating a base station configured to operate with user devices includes scheduling transmission for the user devices. Scheduling transmission includes determining a first fading metric for at least one user device from the at least one user device to the base station, determining at a second fading metric for the at least one user device from the at least one user device to at least one other base station, and determining a priority metric for the at least one user device based on the first and second fading metrics. The priority metric is configured to assign a higher priority to a user device with a first fading metric indicating an up-fade and the second fading metric indicating a down-fade. The method further includes transmitting a transmission schedule to the at least one user device based the priority metric.