Abstract: Wall of timber logs is built by fastening log ends to vertical steel studs. Log ends are notched at inner side of wall to present flat notch faces to flanges of studs. Stud flanges are pre-drilled with vertically spaced holes and fasteners are extended through selected holes into log ends. Weather seals are formed between the logs and extruded plastic strip for this purpose is also disclosed.