Patents Assigned to Guangzhou Construction Engineering Co., Ltd.
-
Patent number: 12018499Abstract: Provided is an accumulative sliding construction method of segmental track-changing for unequal-span structure, which divides the unequal-span structure into at least two sliding sections according to span variation, and a plurality of track segments corresponding to the spans of each sliding section. By providing sliders on the main truss/beam of each sliding section at positions corresponding to the track segments that each main truss/beam need to pass through, the sliding section smoothly passes through the sliding track segments to be in position; in addition, the main truss/beam of each sliding section is provided with temporary lengthening auxiliary structure or divided into an initial-mounted unit and rear-mounted units to allow the main truss/beam of each sliding section to pass through the track segments smoothly and to be in place.Type: GrantFiled: March 5, 2020Date of Patent: June 25, 2024Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., GUANGZHOU WU YANG CONSTRUCTION MACHINERY CO., LTD.Inventors: Long Wang, Huqing Liang, Wei Wei, Wuji Lan, Zhenying Chen, Jianming Wen, Dehui Lu, Jiali Cao, Wenjian Ye
-
Patent number: 11604182Abstract: Provided is an apparatus and method for detecting grout compactness in grouted splice sleeve, the apparatus comprises a probe assembly, which comprises at least one of capacitive probe and piezoelectric sensor and is arranged inside the grouted splice sleeve to detect parameters of the sleeve during grouting and curing and a detector, which comprises at least an analysis module that is connected with the probe assembly to obtain the detected parameters and carry out calculation and analysis for the parameters. The probe assembly is arranged inside the grouted splice sleeve and forms a loop with the detector during grouting, such that during the process of grouting, the detected parameters will be changed as the surrounding dielectric changes, therefore, the detector may determine in real time whether the grouted splice sleeve is fully grouted by calculating and analyzing the detected parameters, which achieves a faster and easier grout compactness detection.Type: GrantFiled: December 15, 2020Date of Patent: March 14, 2023Assignees: GUANGZHOU MUNICIPAL ENGINEERING TESTING CO., LTD., GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO., LTD.Inventors: Mengxiong Tang, Zhiguo Zhou, Xiaoli Sun, Hongye Wang, Jun Yang, Hesong Hu, Wuyang Zhou, Decun Bian, Yayu Zhao, Jixi Shao, Ducheng Guo, Hongbin Zhao
-
Patent number: 11505908Abstract: Provided is a drilling apparatus, comprising a PHC pipe cased pile having a drilling section for containing fluid and a hammer element arranged inside the cavity of the PHC pipe cased pile which moves along the drilling direction till the bottom of the drilling section. As the hammer element moves along the drilling direction till the bottom of the drilling section, a localized hydraulic force will be induced in the fluid contained in the drilling section of the PHC pipe cased pile by a sharp rise in the fluid pressure in addition to the impact force directly acted on the rock and soil by the hammer element. Under action of the hydraulic force and the impact force, the surrounding soft rock stratum could be crushed and the rock stratum with higher strength is left intact, that is, the drilling apparatus proceeds until harder rock. At this point, concrete casting will bond with the harder rock, resulting in a better bearing capacity of the PHC pipe cased pile foundation.Type: GrantFiled: January 26, 2021Date of Patent: November 22, 2022Assignees: GUANGZHOU MUNICIPAL ENGINEERING TESTING CO., LTD., GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO., LTD., GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO., LTD.Inventors: Mengxiong Tang, Zhiguo Zhou, Xiaoli Sun, Jun Yang, Hesong Hu
-
Patent number: 11214938Abstract: The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile.Type: GrantFiled: May 21, 2020Date of Patent: January 4, 2022Assignees: GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO., LTD., GUANGZHOU CONSTRUCTION ENGINEERING CO., LTDInventors: Mengxiong Tang, Hang Chen, Hesong Hu
-
Publication number: 20210292987Abstract: The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile.Type: ApplicationFiled: May 21, 2020Publication date: September 23, 2021Applicants: GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO.,LTD., Guangzhou Construction Engineering Co., LtdInventors: Mengxiong TANG, Hang CHEN, Hesong HU
-
Patent number: 10683672Abstract: A construction apparatus and method for lifting structure integrally over obstacles in vertical direction to a position with different horizontal projection. The apparatus has two platform beams placed each other in parallel, two lifting beams laterally relative to the platform beams and a lifter equipped with the lifting beams. Push instrument kits are installed on the platform beams and the lifting beams respectively, and a plurality of sets of baffles installed on both sides of the platform beams to provide the push instrument kits with a counter-force when the push instrument kits work. When the structure encounters obstacles during the process of lifting the structure by two lifters, the posture of the structure can be altered by operating the push instrument kits and the lifters, such that the horizontal projection of the structure will be reduced and the structure can therefore be lifted over the obstacle in vertical direction.Type: GrantFiled: March 16, 2016Date of Patent: June 16, 2020Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., SHANGHAI YESHENG MECHANICAL & ELECTRICAL CONTROL TECHNOLOGY CO., LTDInventors: Long Wang, Wei Wei, Junyue Gao, Jianming Wen, Sui Yin, Yuantao Zhao, Yanfeng Jia
-
Patent number: 10435896Abstract: An apparatus for lifting and sliding a structure to be attached to a wall of a building, including a lifting platform extending outwardly from the building, and a synchronous lifting and sliding system which is arranged on the lifting platform. The lifting platform has two platform beams extending outwardly from the building, and a lifting beam placed on the platform beams. The synchronous lifting and sliding system has a hydraulic lifter arranged on the lifting beam, a hydraulic jack connected to the lifting beam, and a controller. A connecting rod is connected to one end of the hydraulic jack, and several installing holes are arranged at regular intervals on the connecting rod. The distance between the adjacent installing holes of the connecting rod matches a stroke of the hydraulic jack. An installing ear-plate is provided on the platform beam to connect with the connecting rod.Type: GrantFiled: December 9, 2016Date of Patent: October 8, 2019Assignees: Guangzhou Construction Engineering Co., Ltd., Shanghai YeSheng Mechanical & Electrical Control Technology Co., LTDInventors: Long Wang, Jianming Wen, Junyue Gao, Wei Wei, Yuantao Zhao, Quan Shao, Yanfeng Jia
-
Patent number: 9670684Abstract: The invention disclosed an apparatus for lifting and sliding a structure attached to the wall, comprising a lifting platform extending out over the building on the roof, and a synchronous lifting and sliding system which is arranged on the lifting platform; wherein the lifting platform comprises two platform beams extending out over the building, and a lifting beam placed on the platform beam; the synchronous lifting and sliding system comprises a hydraulic lifter arranged on the lifting beam, a hydraulic push instrument kit connected to the lifting beam, and a controller; A connecting rod is connected to one end of the hydraulic push instrument kit, and several installing holes are arranged at regular intervals on the connecting rod; The distance between the adjacent installing holes of the connecting rod matches with a stroke of the hydraulic push instrument kit; An installing ear-plate is provided on the platform beam to connect with the connecting rod.Type: GrantFiled: January 23, 2014Date of Patent: June 6, 2017Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., SHANGHAI YESHENG MECHANICAL & ELECTRICAL CONTROL TECHNOLOGY CO., LTDInventors: Long Wang, Jianming Wen, Junyue Gao, Wei Wei, Yuantao Zhao, Quan Shao, Yanfeng Jia
-
Patent number: 9518388Abstract: Construction method for producing beam and slab made of compound concrete containing demolished concrete blocks, comprises that a conventional profiled rebars are made to upper and lower L-shaped stirrups, wherein lower profiled rebar mesh are fixed up firstly, in which coarsely-crushed concrete blocks or segments are placed, then upper profiled rebar mesh are assembled on it together to form a rebar cage, and fresh concrete is poured into the mould fully. A connection portion between the upper and lower L-shaped stirrups is located around ? heights of the lower L-shaped stirrup. A cold rolled rebar mesh is applied to a top rebar mesh of slab; when the bottom rebars of the slab are assembled, coarsely-crushed concrete blocks will be dosed, then the cold rolled rebar mesh will be lifted above the coarsely-crushed concrete blocks for mounting. Finally, fresh concrete is poured into the rebar cage for producing abeam and a space between top rebar mesh and bottom rebars for producing a slab.Type: GrantFiled: February 1, 2016Date of Patent: December 13, 2016Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., SOUTH CHINA UNIVERSITY OF TECHNOLOGYInventors: Long Wang, Bo Wu
-
Patent number: 9441383Abstract: The present invention disclosed a construction apparatus and method for lifting structure integrally over the obstacles in vertical direction to a position with different horizontal projection. The apparatus comprises two platform beams placed each other in parallel, two lifting beams laterally relative to the platform beams and a lifter equipped with the lifting beams. Push instrument kits are installed on the platform beams and the lifting beams respectively, and a plurality of sets of baffles installed on both sides of the platform beams to provide the push instrument kits with a counter-force when the push instrument kits work. When the structure encounters obstacles during the process of lifting the structure by two lifters, the posture of the structure can be altered by operating the push instrument kits and the lifters, such that the horizontal projection of the structure will be reduced and the structure can therefore be lifted over the obstacle in vertical direction.Type: GrantFiled: September 20, 2013Date of Patent: September 13, 2016Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD, SHANGHAI YESHENG MECHANICAL & ELECTRICAL CONTROL TECHNOLOGY CO., LTDInventors: Long Wang, Wei Wei, Junyue Gao, Jianming Wen, Sui Yin, Yuantao Zhao, Yanfeng Jia
-
Patent number: 9278831Abstract: The present invention disclosed an apparatus and for lifting and sliding object over barrier in horizontal direction, comprising two lifting beams that placed on supporting structures and located above object to be lifted and a barrier, and a lifter installed on the lifting beam. A hydraulic push instrument kit is installed on a lifting beam to move the shoulder beam and the lifter. The lifter connects with the object through the steel strand and a triangle transfer connector having three fixed-holds. When the steel strand encounters a barrier in horizontal direction, setting another lifting apparatus on the part of lifting beams located on the other side of the barrier, connecting another lifting apparatus with the third fixed-hold of transfer connectors 4 by steel strands, and lifting the object until whole load of the object has been transferred onto the second lifter and the object can move to the desired position.Type: GrantFiled: September 20, 2013Date of Patent: March 8, 2016Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., SHANGHAI YESHENG MECHANICAL & ELECTRICAL CONTROL TECHNOLOGY CO., LTDInventors: Junyue Gao, Long Wang, Wei Wei, Jianming Wen, Sui Yin, Yanfeng Jia, Yuantao Zhao
-
Publication number: 20150110581Abstract: The invention disclosed an apparatus for lifting and sliding a structure attached to the wall, comprising a lifting platform extending out over the building on the roof, and a synchronous lifting and sliding system which is arranged on the lifting platform; wherein the lifting platform comprises two platform beams extending out over the building, and a lifting beam placed on the platform beam; the synchronous lifting and sliding system comprises a hydraulic lifter arranged on the lifting beam, a hydraulic push instrument kit connected to the lifting beam, and a controller; A connecting rod is connected to one end of the hydraulic push instrument kit, and several installing holes are arranged at regular intervals on the connecting rod; The distance between the adjacent installing holes of the connecting rod matches with a stroke of the hydraulic push instrument kit; An installing ear-plate is provided on the platform beam to connect with the connecting rod.Type: ApplicationFiled: January 23, 2014Publication date: April 23, 2015Applicants: Shanghai YeSheng Mechanical & Electrical Control Technology Co., LTD, Guangzhou Construction Engineering Co., Ltd.Inventors: Long WANG, Jianming WEN, Junyue GAO, Wei WEI, Yuantao ZHAO, Quan SHAO, Yanfeng JIA
-
Patent number: 8935890Abstract: The present invention disclosed an apparatus for reverse rectification, relating to the field of civil engineering technology. The apparatus for reverse rectification comprises two sets of steel plate hooks, which are reversely arranged and respectively fixed on the building and the skewed large-scale structure that needs to be rectified, and a jack which is horizontally placed on the steel plate hooks. The steel plate hooks, which are driven by the jack, push the skewed structure towards the existed building, whereby the skewed structure and the existed building can be spliced correctly. This present invention has more advantages, e.g. simple structure and convenient operability, which can improve the construction efficiency and reduce the construction costs. Therefore it can be widely used in the field of civil engineering technology. Further, the present invention also discloses a method for reverse rectification by using the apparatus.Type: GrantFiled: September 9, 2013Date of Patent: January 20, 2015Assignees: Guangzhou DI•ER Construction Engineering Co., Ltd., Guangzhou Construction Engineering Co., Ltd.Inventors: Zhenying Chen, Long Wang, Junyue Gao, Mingqiu Yao, Shaobin Tang, Han Huang, Jingwen Hu, Qianyi He, Weijian Yu, Guoxiong Wang
-
Publication number: 20140348623Abstract: The present invention disclosed an apparatus and for lifting and sliding object over barrier in horizontal direction, comprising two lifting beams that placed on supporting structures and located above object to be lifted and a barrier, and a lifter installed on the lifting beam. A hydraulic push instrument kit is installed on a lifting beam to move the shoulder beam and the lifter. The lifter connects with the object through the steel strand and a triangle transfer connector having three fixed-holds. When the steel strand encounters a barrier in horizontal direction, setting another lifting apparatus on the part of lifting beams located on the other side of the barrier, connecting another lifting apparatus with the third fixed-hold of transfer connectors 4 by steel strands, and lifting the object until whole load of the object has been transferred onto the second lifter and the object can move to the desired position.Type: ApplicationFiled: September 20, 2013Publication date: November 27, 2014Applicants: Shanghai YeSheng Mechanical & Electrical Control Technology Co., LTD, Guangzhou Construction Engineering Co., Ltd.Inventors: Junyue GAO, Long WANG, Wei WEI, Jianming WEN, Sui YIN, Yanfeng JIA, Yuantao ZHAO
-
Publication number: 20140346131Abstract: The present invention disclosed a construction apparatus and method for lifting structure integrally over the obstacles in vertical direction to a position with different horizontal projection. The apparatus comprises two platform beams placed each other in parallel, two lifting beams laterally relative to the platform beams and a lifter equipped with the lifting beams. Push instrument kits are installed on the platform beams and the lifting beams respectively, and a plurality of sets of baffles installed on both sides of the platform beams to provide the push instrument kits with a counter-force when the push instrument kits work. When the structure encounters obstacles during the process of lifting the structure by two lifters, the posture of the structure can be altered by operating the push instrument kits and the lifters, such that the horizontal projection of the structure will be reduced and the structure can therefore be lifted over the obstacle in vertical direction.Type: ApplicationFiled: September 20, 2013Publication date: November 27, 2014Applicants: Shanghai YeSheng Mechanical & Electrical Control Technology Co., LTD, Guangzhou Construction Engineering Co., Ltd.Inventors: Long WANG, Wei WEI, Junyue GAO, Jianming WEN, Sui YIN, Yuantao ZHAO, Yanfeng JIA
-
Publication number: 20140305069Abstract: The present invention disclosed an apparatus for reverse rectification, relating to the field of civil engineering technology. The apparatus for reverse rectification comprises two sets of steel plate hooks, which are reversely arranged and respectively fixed on the building and the skewed large-scale structure that needs to be rectified, and a jack which is horizontally placed on the steel plate hooks. The steel plate hooks, which are driven by the jack, push the skewed structure towards the existed building, whereby the skewed structure and the existed building can be spliced correctly. This present invention has more advantages, e.g. simple structure and convenient operability, which can improve the construction efficiency and reduce the construction costs. Therefore it can be widely used in the field of civil engineering technology. Further, the present invention also discloses a method for reverse rectification by using the apparatus.Type: ApplicationFiled: September 9, 2013Publication date: October 16, 2014Applicants: Guangzhou Construction Engineering Co., Ltd., Guangzhou DI-ER Construction & Engineering Co., Ltd.Inventors: Zhenying CHEN, Long WANG, Junyue GAO, Mingqiu YAO, Shaobin TANG, Han HUANG, Jingwen HU, Qianyi HE, Weijian YU, Guoxiong WANG
-
Patent number: 8745956Abstract: A method for lifting an asymmetric integral construction is provided, including the steps of determining proper lifting points on a construction to be lifted according to the position relationship between the construction and a base supporter, setting a dragging point on the bottom of the construction, the dragging point being located on the extension line of the connection between the gravity center of construction and the centroid of the lifting points, determining a projection point of the dragging point on the ground, arranging a dragging device between the dragging point and the projection point, installing a lifting system at a proper position, conducting lifting operation by means of the lifting system cooperated with the dragging device, and rectifying and fixing the construction after it is in place.Type: GrantFiled: July 11, 2013Date of Patent: June 10, 2014Assignees: Guangzhou Construction Engineering Co., Ltd., Shanghai YeSheng Mechanical & Electrical Control Technology Co., Ltd.Inventors: Long Wang, Junyue Gao, Zhenying Chen, Wei Wei