Patents Assigned to Guangzhou Institute of Building Science Co., Ltd.
  • Patent number: 11505908
    Abstract: Provided is a drilling apparatus, comprising a PHC pipe cased pile having a drilling section for containing fluid and a hammer element arranged inside the cavity of the PHC pipe cased pile which moves along the drilling direction till the bottom of the drilling section. As the hammer element moves along the drilling direction till the bottom of the drilling section, a localized hydraulic force will be induced in the fluid contained in the drilling section of the PHC pipe cased pile by a sharp rise in the fluid pressure in addition to the impact force directly acted on the rock and soil by the hammer element. Under action of the hydraulic force and the impact force, the surrounding soft rock stratum could be crushed and the rock stratum with higher strength is left intact, that is, the drilling apparatus proceeds until harder rock. At this point, concrete casting will bond with the harder rock, resulting in a better bearing capacity of the PHC pipe cased pile foundation.
    Type: Grant
    Filed: January 26, 2021
    Date of Patent: November 22, 2022
    Assignees: GUANGZHOU MUNICIPAL ENGINEERING TESTING CO., LTD., GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO., LTD., GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., GUANGZHOU MUNICIPAL CONSTRUCTION GROUP CO., LTD.
    Inventors: Mengxiong Tang, Zhiguo Zhou, Xiaoli Sun, Jun Yang, Hesong Hu
  • Patent number: 11275192
    Abstract: Provided is a pile integrity detection system based on cross-hole sonic logging method. The operator sets the ultrasonic detector into the measuring tubes of the to-be-detected pile, subsequently inputs the project data and activate the ultrasonic detector, by an acoustic wave transmission among a transmitter and a receiver, a wave energy data of the to-be-detected pile can be obtained, and the wave energy data and a project data will be automatically transmitted to the cloud computing module, thereby the integrity level of the to-be-detected pile can be determined without any manual analysis to the wave energy data, preventing from any error or deflection due to manual operation, whereby it greatly improves the accuracy and efficiency of detection and reduces the error rate.
    Type: Grant
    Filed: July 5, 2019
    Date of Patent: March 15, 2022
    Assignees: GUANGZHOU TESTING CENTRE OF CONSTRUCTION QUALITY AND SAFETY CO., LTD., GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO., LTD.
    Inventors: Hesong Hu, Chunlin Liu, Shuo Zhang, Xueshun Yang
  • Patent number: 11214938
    Abstract: The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile.
    Type: Grant
    Filed: May 21, 2020
    Date of Patent: January 4, 2022
    Assignees: GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO., LTD., GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD
    Inventors: Mengxiong Tang, Hang Chen, Hesong Hu
  • Publication number: 20210292987
    Abstract: The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile.
    Type: Application
    Filed: May 21, 2020
    Publication date: September 23, 2021
    Applicants: GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO.,LTD., Guangzhou Construction Engineering Co., Ltd
    Inventors: Mengxiong TANG, Hang CHEN, Hesong HU
  • Patent number: 10860861
    Abstract: The present disclosure discloses a data transmission system of safety patrol on construction project site based on “internet plus” according to the present disclosure comprises a patrol apparatus for collecting and transmitting an on-site panorama image, 3D point cloud data of the scene, location information and construction on-site data; a cloud computing platform for receiving the on-site panorama image, the 3D point cloud data of the scene, the location information and the construction on-site data, and reconstructing a 3D model of a patrol scene based on the panorama images, the 3D point cloud data of the scene, the location information and the construction on-site data; a safety patrol data terminal providing inspection/browse to construction site; the present disclosure enable users to patrol in construction project remotely, reducing workload of the safety production management personnel, improving patrol efficiency, enhancing the intuitive reality of the patrol and the safety patrol level of the const
    Type: Grant
    Filed: January 11, 2019
    Date of Patent: December 8, 2020
    Assignee: GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO., LTD.
    Inventors: Hesong Hu, Jian Su, Zhongtian Lu, Junyi Wen, Zhuo Yang, Lingsheng Tan, Chaowen Wang, Jieming Li
  • Patent number: 9359738
    Abstract: The present invention relates to a quick coupling for pipe pile, comprising an upper end plate, a lower end plate and a screw hook made of spring steel for coupling the upper and lower end plate, a plurality of tapped holes are uniformly provided on the upper end plate, a plurality of holes corresponding to the tapped holes are provided on the lower end plate, a lock hole is positioned at the lower portion of the hole, while the cross-section area of the lock hole is bigger than the cross-section area of the hole. One end of the screw hook is provided with a screw end mating with the tapped hole on the upper end plate, while the other end is provided with a hook end mating with the lock hole on the lower end plate, whereby the upper and lower end plate can be coupled firmly.
    Type: Grant
    Filed: August 27, 2014
    Date of Patent: June 7, 2016
    Assignees: Guangzhou Institute of Building Science Co., Ltd., Technology Development Center of Guangzhou Institute of Building Science Co., Ltd.
    Inventors: Yuliang Qi, Mengxiong Tang, Hesong Hu