Abstract: Provided as a hoist system for installing a plurality of panels of a panel set onto a building structure at a jobsite. The hoist system comprises a beam assembly configured to hoist the panels and sequentially offload the panels from the beam assembly onto the building structure. The beam assembly comprises an elongate hoist beam, a lifting lug, a plurality of trolleys mounted on one of the opposing ends of hoist beam, and a drive mechanism operative to reposition the lifting lug along the hoist beam such that the hoist beams maintain a substantially horizontal or level orientation.