Abstract: There is provided a method that achieves ground reinforcement, a rise of ground surface level, and ground surface flattening, and so forth even on ground free of a building construction on it or soft ground. The method involves: determination of the degree of consolidation at a grout injection depth position; prediction of a permeation radius at which grout will permeate first on the basis of the degree of consolidation and the amount of grout for single-shot injection; setting of a plurality of grout injection points so as to be spaced apart by an adjacent distance greater than twice the permeation radius; starting of time-spaced injections at each grout injection point; and formation of a solidified portion during the first injection and formation of an enlarged solidified portion during the second injection.
Abstract: There is provided a method that achieves ground reinforcement, a rise of ground surface level, and ground surface flattening, and so forth even on ground free of a building construction on it or soft ground. The method involves: determination of the degree of consolidation at a grout injection depth position; prediction of a permeation radius at which grout will permeate first on the basis of the degree of consolidation and the amount of grout for single-shot injection; setting of a plurality of grout injection points so as to be spaced apart by an adjacent distance greater than twice the permeation radius; starting of time-spaced injections at each grout injection point; and formation of a solidified portion during the first injection and formation of an enlarged solidified portion during the second injection.