Abstract: A tunnel boring robot includes a tunnel boring machine, a sensing unit, an intelligent decision unit, and a controller unit. The sensing unit, the intelligent decision unit and the controller unit are disposed at the tunnel boring machine. The sensing unit is configured to sense, in real time, boring operation data of a current cycle during which the tunnel boring machine is working according to set boring parameter information. The intelligent decision unit is configured to receive the boring operation data sent by the sensing unit, and generate the set boring parameter information for a next cycle according to a preset prediction algorithm, the boring operation data and a desired boring effect. The controller unit is configured to receive the set boring parameter information, and control the tunnel boring machine to perform a boring operation for the next cycle according to the set boring parameter information.
Type:
Grant
Filed:
November 27, 2019
Date of Patent:
August 10, 2021
Assignees:
HUANENG TIBET YARLUNGZANGBO RIVER HYDROPOWER DEVELOPMENT INVESTMENT CO., LTD., TSINGHUA UNIVERSITY, HUANENG GROUP TECHNOLOGY INNOVATION CENTER CO., LTD.