Patents Assigned to Hydroelectric Corporation
  • Publication number: 20230082285
    Abstract: A system that produces electricity offshore through a floating installation, including minimum of; one power production water turbine, one startup generator, a loop system, one air compressor, one high voltage subsea cable, and one control center; whereas the startup generator produces power for about 5-10 minutes before the loop system kicks in, an onshore control center makes it possible for the plant to be operated unmanned, where the surplus electricity generated through the water turbines are transported to the onshore electricity grid or another offshore structure, through a high voltage subsea cable.
    Type: Application
    Filed: September 12, 2022
    Publication date: March 16, 2023
    Applicant: Hydroelectric Corporation
    Inventor: Eiric Skaaren