Patents Assigned to IHC IQIP UK LTD
  • Patent number: 10968591
    Abstract: The invention relates to a pile guide comprising a base frame and a guide member for guiding a pile as it is driven into a substrate, the guide member comprising a plurality of guide parts that are movable between an operative position for supporting the pile and an inoperative position. The pile guide comprises a mechanism that couples the guide parts such that movement of a guide part towards the operative position results in movement of at least one other guide part towards the operative position.
    Type: Grant
    Filed: September 27, 2017
    Date of Patent: April 6, 2021
    Assignee: IHC IQIP UK LTD.
    Inventor: David Howel Gunter
  • Patent number: 10443203
    Abstract: A pile guide is provided comprising a base frame and a superstructure comprising a pile guide member for guiding the pile as it is driven into a substrate when the base frame is resting thereon. At least part of the superstructure defines an arm that is rotational with respect to the base frame about a first and second points of rotation, to rotate the pile guide member with respect to the base frame. At least one of the first and second points of rotation is translatable with respect to the base frame in a first direction, thereby rotating the arm about the first and second points of rotation with respect to the base frame. At least one of the first and second points of rotation is translatable in a second direction substantially perpendicular to the first and second points of rotation with respect to the base frame direction. A method is also provided.
    Type: Grant
    Filed: February 28, 2014
    Date of Patent: October 15, 2019
    Assignee: IHC IQIP UK LTD.
    Inventor: David Howel Gunter
  • Patent number: 10400414
    Abstract: In a method of installing a pile in the sea bottom by means of a pile guide which has a frame and at least an upper and a lower pair of cooperating guide members, wherein the upper pair and the lower pair are located at a distance from each other in vertical direction. Each pair of guide members comprises a passive guide member and an active guide member. The passive guide members are moved to respective fixed initial guiding positions with respect to the frame and the active guide members are moved to the pile until the passive and the active guide members engage the pile, after which the pile is hold between the upper pair of guide members and between the lower pair of guide members during driving the pile into the sea bottom, during which the actual forces between the pile and the respective guide members are determined.
    Type: Grant
    Filed: April 19, 2016
    Date of Patent: September 3, 2019
    Assignee: IHC IQIP UK LTD
    Inventor: James Ewart Milligan Mack
  • Patent number: 10316484
    Abstract: A pile guide is provided comprising a base frame and a pile guide member for guiding the pile as it is driven into a substrate when the base frame is resting thereon. The pile guide member comprises plural guide parts each moveable between a operative position and an inoperative position, each guide part being pivotally mounted on the base frame. At least one guide part is operably coupled or couplable with an associated counterweight for opening of the guide member to its inoperative position under gravity, such that, at least in an inoperative position, at least part of the counterweight and the associated guide part are movable with respect to each other. In another aspect, at least one of the guide parts and/or at least one of the counterweights is detachably connected with the base frame and/or with each other. Methods are also provided.
    Type: Grant
    Filed: October 10, 2013
    Date of Patent: June 11, 2019
    Assignee: IHC IQIP UK LTD.
    Inventor: David Howel Gunter
  • Publication number: 20180106007
    Abstract: In a method of installing a pile in the sea bottom by means of a pile guide which has a frame and at least an upper and a lower pair of cooperating guide members, wherein the upper pair and the lower pair are located at a distance from each other in vertical direction. Each pair of guide members comprises a passive guide member and an active guide member. The passive guide members are moved to respective fixed initial guiding positions with respect to the frame and the active guide members are moved to the pile until the passive and the active guide members engage the pile, after which the pile is hold between the upper pair of guide members and between the lower pair of guide members during driving the pile into the sea bottom, during which the actual forces between the pile and the respective guide members are determined.
    Type: Application
    Filed: April 19, 2016
    Publication date: April 19, 2018
    Applicant: IHC IQIP UK LTD
    Inventor: James Ewart Milligan Mack