Abstract: A method for managing a life cycle of a complex engineering facility, comprising several steps. The steps include forming a facility structure of the facility; selecting constituent elements of the facility structure and the relationships between the constituent elements and a location of each of the constituent elements in a decomposition structure of the facility; forming a linked array of requirements related to the facility and to processes of implementation of the requirement for the facility; planning and accounting for the requirements in accordance with the structural decomposition of the facility, the requirements being assigned a certain status; and forming databases intended for storing an associated array of information about the constituent elements of the facility, the associated array of information comprising at least a plurality of documents related to design data and/or to supply and procurement data and/or to pre-commissioning data and/or operation data and/or facility configuration data.
Type:
Grant
Filed:
March 1, 2017
Date of Patent:
November 22, 2022
Assignees:
JOINT-STOCK COMPANY ASE ENGINEERING COMPANY, JOINT STOCK COMPANY “SCIENCE AND INNOVATIONS”