Abstract: The purpose of the present invention is to provide a method by which a piling is reinforced and stable support strength can be provided to a building. The method accordingly includes a step for removing a peripheral region of a buried piling, and exposing the piling, and a step for forming in the removed area a reinforcement layer surrounding the piling. Employing a reinforcement method of such description enables load from the building to be supported by the piling and the reinforcement layer. The reinforcement layer can be formed by laying crushed rock, sandbags, concrete, or mortar; pouring a hardening materials; or a combination thereof.