Abstract: A sample transport method, applied to a test instrument including a conveyor belt, and a loading platform and a grab position sequentially disposed along a transport direction of the conveyor belt, wherein a plurality of sample holder transport positions are disposed on the conveyor belt; the method including: pushing a first sample holder from the loading platform to a sample holder transport position of the conveyor; when a sample position on the first sample holder moves to the grab position, determining whether the sample position moved the grab position is a target sample position; if so, then determining whether all samples positions on the first sample holder before the target sample holder other than a predetermined number of sample positions have completed testing, wherein the predetermined number is sample position number corresponding to a delay time in outputting information indicating whether a sample needs to be retested.
Abstract: A sample transport method, applied to a test instrument including a conveyor belt, and a loading platform and a grab position sequentially disposed along a transport direction of the conveyor belt, wherein a plurality of sample holder transport positions are disposed on the conveyor belt; the method including: pushing a first sample holder from the loading platform to a sample holder transport position of the conveyor; when a sample position on the first sample holder moves to the grab position, determining whether the sample position moved the grab position is a target sample position; if so, then determining whether all samples positions on the first sample holder before the target sample holder other than a predetermined number of sample positions have completed testing, wherein the predetermined number is sample position number corresponding to a delay time in outputting information indicating whether a sample needs to be retested.